GH-1 (Grand Omaxe), Phase - 2, at Omaxe Integrated

UPRERARegistered

GH-1 (Grand Omaxe), Phase - 2, at Omaxe Integrated is a RERA-registered residential project by Omaxe Limited in Lucknow (RERA ID UPRERAPRJ775). Registered with a completion deadline of 29 Jul 2025.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ775
Project categoryResidential
Registration typeOngoing
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryLucknow Development Authority
Proposed start4 Apr 2015
Original start4 Apr 2015
Project duration124 months
Addresssarsawan, Lucknow, Lucknow
TehsilLucknow
Applicant typeCompany
Applicant addressSHOP No-19-B, FIRST FLOOR, OMAXE CELEBRATION MALL, SOHNA ROAD, GURGAON-122001
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  2. 2 building permits sanctioned

  3. Registered with RERA

  4. valid to

    Permit revalidated

    39411

  5. Building permit sanctioned

    39411

  6. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  7. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  8. to

    Extension granted

  9. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered27 Jul 2017
Original completion31 Jul 2023
Revised completion29 Jul 2025
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹48,500
Sanctioning authorityLucknow Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors303 · 5 · 20 (units from plan)
Homes · commercial units296 · 7 (shops and offices filed in the same plan)
  • 2 BHK272 90%
  • 1 BHK16 5%
  • SHOP7 2%
  • 4 BHK4 1%
  • PENTHOUSE4 1%
ConfigurationUnitsCarpet area
1 BHK1658
2 BHK27265-72
4 BHK4148-159
PENTHOUSE4148-159
SHOP714
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
Florance -A · 1 BHK, 2 BHK, 4 BHK, OTHER207458-159
Florance -B · 1 BHK, 2 BHK, 4 BHK, OTHER207458-159
Florance -D · 2 BHK, PENTHOUSE, OTHER, 1 BHK207458-159
Florance-C · 2 BHK, PENTHOUSE, 1 BHK, OTHER207458-159
SHOPS · SHOP1714
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
PRAKASH KUMAR
License CA/2008/43012
Omaxe
Engineer
Mr. Sanjeev Jain
Chordia Engineering Consultancy Services, I-1738, Chittranjan Park, Lower Ground Floor, New Delhi-19
Contractor
Omaxe Ltd
7, LSC Kalkaji, New Delhi
Sr.Development work declared to RERA
1Demarcation of Plots
As per Approved layout plan.
2Boundary Wall
All around side Temporary Boundary demarcation Done
3Road Work
Integrated Township Road Developed By Omaxe
4Footpaths
Both side Pathway develop along approach road
5Water Supply Including Drinking Water Facilities
Internal work will be provided within site
6Sewer System
STP will be constructed at site
7Drain
Will be constructed as per requirement
8Parks
Will be developed as per specification
9Tree Planting
Will be developed as per specification
10Design For Electric Supply Including Street Lighting
Will be developed as per specification
11Community Buildings
N/A
12Treatment and Disposal System of Sewage and Sullage water
STP will be Constructed at site and Disposal as per Requirement
13Solid Waste Management And Disposal System
As per Requrement it Will be Provided
14Water Conservation System
As per specification Will be Provided
15Energy Management System Including Use of Renewable Energy
As per specification Will be Provided
16Fire Protection And Fire Safety System
As per specification Will be Provided
17Social Infrastructure And Other Public Amenities Including Public Health Services
N/A
18Emergency Evacuation Services
As per specification Will be Provided
19Other Miscellaneous Work
As per specification Will be Provided
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

61 agents

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1360 REALTORS LLPUPRERAAGT10868
2ALMIGHTY INFRAESTATE PVT LTDUPRERAAGT10163
3ALOK UPADHYAYUPRERAAGT12497
4AMIT GULATIUPRERAAGT12150
5ARADHYA REAL ESTATEUPRERAAGT13179
6ARCHANA GUPTAUPRERAAGT10881
7Arvind Kumar VermaUPRERAAGT12382
8ASA FINCAP ADVISORS LLPUPRERAAGT10926
9Bamdev UpadhyayUPRERAAGT14295
10CHANDRA PRAKASHUPRERAAGT13704
11CITYMAX PROPMART PRIVATE LIMITEDUPRERAAGT13792
12DAIWIK REALTORSUPRERAAGT12075
13DHARMENDRA KUMAR PANDEYUPRERAAGT10923
14DILIP KUMAR SINGHUPRERAAGT10948
15Earth Homes Pvt. LtdUPRERAAGT11244
16GAUTAM ASSOCIATESUPRERAAGT11617
17GOLDEN ESTATEUPRERAAGT10397
18GUNJAN PANDEYUPRERAAGT13682
19Hitesh KesarwaniUPRERAAGT11538
20HITESH KHANNAUPRERAAGT13833
21INVESTORS CARE INFRATECH PVT LTDUPRERAAGT13542
22INVESTORS CLINIC INFRATECH PRIVATE LIMITEDUPRERAAGT10052
23Karshni Buildwell Pvt LtdUPRERAAGT11401
24KAUSHTUBH REALTY PRIVET LIMITEDUPRERAAGT13025
25LINK PROPERTIESUPRERAAGT10081
26M.S. ConsultantsUPRERAAGT10079
27M.S. Property Consultants L.L.P.UPRERAAGT10074
28MAYANK OJHAUPRERAAGT10570
29MOHD AFZALUPRERAAGT13830
30Pankaj MittalUPRERAAGT13523
31PIXEL GLOBAL INFRA PRIVATE LIMITEDUPRERAAGT13936
32PRIYANK SHEKHARUPRERAAGT13933
33PROPERTY JUNCTION PRIVATE LIMITEDUPRERAAGT12902
34Purvanchal BuildhomeUPRERAAGT10883
35RADHESH CHANDRAUPRERAAGT10484
36Raj Kumar UpadhyayUPRERAAGT10920
37RAJEEV KUMAR SHUKLAUPRERAAGT13288
38Rajni DawraUPRERAAGT13519
39RAJNI NIGAMUPRERAAGT10897
40REALTYSTRUCTURE INFRATECH PRIVATE LIMITEDUPRERAAGT10144
41REENA PANDEYUPRERAAGT11611
42RELIVE SOLUTIONS PVT. LTD.UPRERAAGT10078
43Sachan Estate Pvt LtdUPRERAAGT10143
44SANJEEV KUMAR BANKAUPRERAAGT10894
45SDR INFRA BUILD PVT LTDUPRERAAGT11062
46SHASHI KANT SHUKLAUPRERAAGT12289
47SHREE SHRADDHA PROPERTIESUPRERAAGT10301
48SHRI RUDRA REAL ESTATESUPRERAAGT14251
49SILVER EDGE REAL ESTATE SOLUTIONUPRERAAGT12168
50SMC Real Estate Advisors Private LimitedUPRERAAGT10113
51SOURABH NIGAMUPRERAAGT10900
52STRAIGHTEDGE REAL ESTATE PRIVATE LIMITEDUPRERAAGT10067
53SUNIL KUMAR PRAJAPATIUPRERAAGT12499
54Tushar ChandaniUPRERAAGT12001
55Varun Properties Inc.UPRERAAGT11985
56VELOCITY DEVELOPERSUPRERAAGT10813
57VIKAS PANDEYUPRERAAGT11324
58VIKAS SINGHUPRERAAGT12163
59VIRENDRA KUMAR DEWANUPRERAAGT13205
60VISHAL BAJPAIUPRERAAGT11344
61vishal srivastavaUPRERAAGT11982
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

3 permits

An approval and the date it runs to - not proof the work matching it was done.

3 sanctioning permits are on record with UPRERA, the latest valid to 5 Feb 2024. 1 of them carries a revalidation, valid to 7 Aug 2027.

Sanctioned by Lucknow Development Authority · 8,623 sqm of land · an approved plan of 5 blocks and 303 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endRevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossaryDocuments filed
394115 Feb 20161 Feb 20211 Feb 202431 Jul 2023—
394115 Feb 20161 Feb 20211 Feb 202430 Jan 2024—
394115 Feb 20225 Feb 20248 Oct 203030 Jan 20245 Feb 2022
valid to 7 Aug 2027
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 2 completion extensions for this project, the latest running to 29 Jul 2025.

#Granted fromExtended uptoNote
131 Jul 202330 Jan 2024Six months extension in view of force majeure caused by covid-19 pandemic
230 Jan 202429 Jul 2025—

Land & documents

66 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
4003730—
4013260—
4022970—
4031520—
4042150—
4054670—
4087100—
4091240—
410340—
4114820—
4122580—
4805260—
406130—
4976000—
40700—
4003730Khasra
4013260Khasra
4022970Khasra
4030Khasra
4042150Khasra
4054670Khasra
4087100Khasra
4091240Khasra
410340Khasra
4114820Khasra
4122580Khasra
4133270Khasra
4144170Khasra
4805260Khasra
3991460Khasra
4463160Khasra
406130Khasra
4976000Khasra
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

7 registry or lease-deed filings are on this project’s record with UPRERA, the earliest dated 7 Jul 2006.

Registry no.DateTypeArea
949210 Oct 2006Own—
94359 Oct 2006Own—
72123 Aug 2006Own—
69658 May 2013Own—
683524 Jul 2006Own—
63117 Jul 2006Own—
113086 Dec 2006Own—
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Sale deed · 11160
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 124
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 197
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 1343
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 5358
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 6849
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 8495
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 11158
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 11195
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 11660
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 18822
The registered deed by which the promoter bought the land.
PDF ↗
Registry document · 05/07
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 08/94
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 20645
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Lease deed · 3837
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Document checklist
DocumentStatusUploaded
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New10 Nov 2021 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New5 Jul 2018 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New5 Jul 2018 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New5 Jul 2018 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New2 Jul 2018 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New2 Jul 2018 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New5 Jul 2018 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New2 Jul 2018 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New5 Jul 2018 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New31 Jul 2018 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New31 Jul 2018 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New31 Jul 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old27 Jul 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old27 Jul 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old27 Jul 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old27 Jul 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old27 Jul 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old27 Jul 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old27 Jul 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old27 Jul 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old27 Jul 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old27 Jul 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old27 Jul 2017 ↗
Agreement for other land
The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title.
Old27 Jul 2017 ↗
Agreement for other land
The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title.
Old27 Jul 2017 ↗
Agreement for other land
The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title.
Old27 Jul 2017 ↗
Agreement for other land
The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title.
Old27 Jul 2017 ↗
Agreement for other land
The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title.
Old27 Jul 2017 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
Old27 Jul 2017 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
Old27 Jul 2017 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
Old27 Jul 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old24 Oct 2017 ↗

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking waterYes
Fire safety (as filed with RERA)Yes
Health serviceYes
Renewable energyYes
Other facilitieswill be provided later

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Quarterly progress reports

22 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

22 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2025-Q2.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
2024-Q4—CA ↗ · Arch ↗ · Eng ↗
2025-Q1—CA ↗ · Arch ↗ · Eng ↗
2025-Q263.12%CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2025-Q2. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameOmaxe Limited
RolePromoter · current
RERA IDUPRERAPRM2386
PANAAACO0171H
CIN / TANDELO01861G
Name of chairmanMr. Rohtash Goel
Registered addressSHOP No-19-B, FIRST FLOOR, OMAXE CELEBRATION MALL, SOHNA ROAD, GURGAON-122001
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
GRAND OMAXE PHASE-II, LUCKNOW-OMAXE LIMITED- RERA ACCOUNTBankICICI BANKBranchNEW DELHI CANNAUGHT PLACEA/C no.IFSCICIC0000007
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

5 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)224 (Under Registration - 4 ) → 225 (Under Registration - 4 )
changed in Estanzo’s record
18 Oct 2026
Promoter’s complaints tally (all their projects)224 (Under Registration - 5 ) → 224 (Under Registration - 4 )
changed in Estanzo’s record
23 Sept 2026
Promoter’s complaints tally (all their projects)223 (Under Registration - 4 ) → 224 (Under Registration - 5 )
changed in Estanzo’s record
11 Sept 2026
Promoter’s complaints tally (all their projects)223 (Under Registration - 5 ) → 223 (Under Registration - 4 )
changed in Estanzo’s record
7 Sept 2026
Promoter’s complaints tally (all their projects)220 (Under Registration - 3 ) → 223 (Under Registration - 5 )
changed in Estanzo’s record
23 Aug 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 18 Oct 2026 · 5 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

Common questions about GH-1 (Grand Omaxe), Phase - 2, at Omaxe Integrated

Is GH-1 (Grand Omaxe), Phase - 2, at Omaxe Integrated RERA registered?

Yes. GH-1 (Grand Omaxe), Phase - 2, at Omaxe Integrated is registered with UPRERA under registration number UPRERAPRJ775, registered on 27 Jul 2017. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for GH-1 (Grand Omaxe), Phase - 2, at Omaxe Integrated?

The completion date filed with UPRERA is 29 Jul 2025. No completion certificate is on record yet.

Who is the builder of GH-1 (Grand Omaxe), Phase - 2, at Omaxe Integrated?

Omaxe Limited is the promoter entity that filed GH-1 (Grand Omaxe), Phase - 2, at Omaxe Integrated with UPRERA (promoter RERA ID UPRERAPRM2386). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted GH-1 (Grand Omaxe), Phase - 2, at Omaxe Integrated more time to complete?

UPRERA's record carries 2 completion extensions for GH-1 (Grand Omaxe), Phase - 2, at Omaxe Integrated, the latest running to 29 Jul 2025. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does GH-1 (Grand Omaxe), Phase - 2, at Omaxe Integrated have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is GH-1 (Grand Omaxe), Phase - 2, at Omaxe Integrated located?

GH-1 (Grand Omaxe), Phase - 2, at Omaxe Integrated is registered in Lucknow, as filed with UPRERA.

What configurations are available in GH-1 (Grand Omaxe), Phase - 2, at Omaxe Integrated?

The unit plan filed with UPRERA lists 1 BHK, 2 BHK, 4 BHK, PENTHOUSE, OTHER and SHOP. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in GH-1 (Grand Omaxe), Phase - 2, at Omaxe Integrated?

The approved unit plan filed with UPRERA runs from 14 to 159 m² of carpet area (about 148 to 1,713 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in GH-1 (Grand Omaxe), Phase - 2, at Omaxe Integrated?

The approved unit plan describes 5 blocks and 303 units of which 296 are homes and 7 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is GH-1 (Grand Omaxe), Phase - 2, at Omaxe Integrated?

About 142 units per acre: 303 planned units across 2.13 acres (8,623 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗