GH-6 (EWS & LIG) at Omaxe Integrated Township is a RERA-registered residential project by Omaxe Limited in Lucknow (RERA ID UPRERAPRJ15656). Registered with a completion deadline of 28 Apr 2025.
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ15656 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Lucknow Development Authority |
| Proposed start | 1 May 2018 |
| Project duration | 84 months |
| Address | Sarojini Nagar, Lucknow |
| Tehsil | Sarojini Nagar |
| Applicant type | Company |
| Applicant address | SHOP No-19-B, FIRST FLOOR, OMAXE CELEBRATION MALL, SOHNA ROAD, GURGAON-122001 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
2 building permits sanctioned
Registered with RERA
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
- to
Extension granted
“Six months extension in view of force majeure caused by covid-19 pandemic”
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
- valid to
Permit revalidated
LDA/BP/21-22/2875
- to
Extension granted
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 13 Apr 2018 |
| Original completion | 30 Apr 2023 |
| Revised completion | 28 Apr 2025 |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹72,500 |
| Sanctioning authority | Lucknow Development Authority |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
- OTHER390 61%
- 1 BHK240 37%
- SHOP12 2%
| Configuration | Units | Carpet area |
|---|---|---|
| OTHER | 390 | 28 |
| 1 BHK | 240 | 33 |
| SHOP | 12 | 13 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| EWS · OTHER | 10 | 390 | 28 |
| LIG T-1 · 1 BHK | 10 | 120 | 33 |
| LIG T-2 · 1 BHK | 10 | 120 | 33 |
| Shops · SHOP | 1 | 12 | 13 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots As per approved layout plan |
| 2 | Boundary Wall As per approved layout plan |
| 3 | Road Work As per approved layout plan |
| 4 | Footpaths As per approved layout plan |
| 5 | Water Supply Including Drinking Water Facilities Internal work will be provided within site |
| 6 | Sewer System STP will be constructed at site |
| 7 | Drain Will be constructed as per requirement |
| 8 | Parks Will be developed as per specification |
| 9 | Tree Planting Will be developed as per specification |
| 10 | Design For Electric Supply Including Street Lighting Will be developed as per specification |
| 11 | Community Buildings N/A |
| 12 | Treatment and Disposal System of Sewage and Sullage water STP will be Constructed at site and Disposal as per Requirement |
| 13 | Solid Waste Management And Disposal System As per Requrement it Will be Provided |
| 14 | Water Conservation System As per specification Will be Provided |
| 15 | Energy Management System Including Use of Renewable Energy As per specification Will be Provided |
| 16 | Fire Protection And Fire Safety System As per specification Will be Provided |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services N/A |
| 18 | Emergency Evacuation Services As per specification Will be Provided |
| 19 | Other Miscellaneous Work As per specification Will be Provided |
Registered agents
61 agents
Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.
| Sr. | Agent | RERA registration |
|---|---|---|
| 1 | 360 REALTORS LLP | UPRERAAGT10868 |
| 2 | ALMIGHTY INFRAESTATE PVT LTD | UPRERAAGT10163 |
| 3 | ALOK UPADHYAY | UPRERAAGT12497 |
| 4 | AMIT GULATI | UPRERAAGT12150 |
| 5 | ARADHYA REAL ESTATE | UPRERAAGT13179 |
| 6 | ARCHANA GUPTA | UPRERAAGT10881 |
| 7 | Arvind Kumar Verma | UPRERAAGT12382 |
| 8 | ASA FINCAP ADVISORS LLP | UPRERAAGT10926 |
| 9 | Bamdev Upadhyay | UPRERAAGT14295 |
| 10 | CHANDRA PRAKASH | UPRERAAGT13704 |
| 11 | CITYMAX PROPMART PRIVATE LIMITED | UPRERAAGT13792 |
| 12 | DAIWIK REALTORS | UPRERAAGT12075 |
| 13 | DHARMENDRA KUMAR PANDEY | UPRERAAGT10923 |
| 14 | DILIP KUMAR SINGH | UPRERAAGT10948 |
| 15 | Earth Homes Pvt. Ltd | UPRERAAGT11244 |
| 16 | GAUTAM ASSOCIATES | UPRERAAGT11617 |
| 17 | GOLDEN ESTATE | UPRERAAGT10397 |
| 18 | GUNJAN PANDEY | UPRERAAGT13682 |
| 19 | Hitesh Kesarwani | UPRERAAGT11538 |
| 20 | HITESH KHANNA | UPRERAAGT13833 |
| 21 | INVESTORS CARE INFRATECH PVT LTD | UPRERAAGT13542 |
| 22 | INVESTORS CLINIC INFRATECH PRIVATE LIMITED | UPRERAAGT10052 |
| 23 | Karshni Buildwell Pvt Ltd | UPRERAAGT11401 |
| 24 | KAUSHTUBH REALTY PRIVET LIMITED | UPRERAAGT13025 |
| 25 | LINK PROPERTIES | UPRERAAGT10081 |
| 26 | M.S. Consultants | UPRERAAGT10079 |
| 27 | M.S. Property Consultants L.L.P. | UPRERAAGT10074 |
| 28 | MAYANK OJHA | UPRERAAGT10570 |
| 29 | MOHD AFZAL | UPRERAAGT13830 |
| 30 | Pankaj Mittal | UPRERAAGT13523 |
| 31 | PIXEL GLOBAL INFRA PRIVATE LIMITED | UPRERAAGT13936 |
| 32 | PRIYANK SHEKHAR | UPRERAAGT13933 |
| 33 | Purvanchal Buildhome | UPRERAAGT10883 |
| 34 | R K PROPERTIES | UPRERAAGT11201 |
| 35 | RADHESH CHANDRA | UPRERAAGT10484 |
| 36 | Raj Kumar Upadhyay | UPRERAAGT10920 |
| 37 | RAJEEV KUMAR SHUKLA | UPRERAAGT13288 |
| 38 | Rajni Dawra | UPRERAAGT13519 |
| 39 | RAJNI NIGAM | UPRERAAGT10897 |
| 40 | REALTYSTRUCTURE INFRATECH PRIVATE LIMITED | UPRERAAGT10144 |
| 41 | REENA PANDEY | UPRERAAGT11611 |
| 42 | RELIVE SOLUTIONS PVT. LTD. | UPRERAAGT10078 |
| 43 | Sachan Estate Pvt Ltd | UPRERAAGT10143 |
| 44 | SANJEEV KUMAR BANKA | UPRERAAGT10894 |
| 45 | SDR INFRA BUILD PVT LTD | UPRERAAGT11062 |
| 46 | SHASHI KANT SHUKLA | UPRERAAGT12289 |
| 47 | SHREE SHRADDHA PROPERTIES | UPRERAAGT10301 |
| 48 | SHRI RUDRA REAL ESTATES | UPRERAAGT14251 |
| 49 | SILVER EDGE REAL ESTATE SOLUTION | UPRERAAGT12168 |
| 50 | SMC Real Estate Advisors Private Limited | UPRERAAGT10113 |
| 51 | SOURABH NIGAM | UPRERAAGT10900 |
| 52 | STRAIGHTEDGE REAL ESTATE PRIVATE LIMITED | UPRERAAGT10067 |
| 53 | SUNIL KUMAR PRAJAPATI | UPRERAAGT12499 |
| 54 | Tushar Chandani | UPRERAAGT12001 |
| 55 | Varun Properties Inc. | UPRERAAGT11985 |
| 56 | VELOCITY DEVELOPERS | UPRERAAGT10813 |
| 57 | VIKAS PANDEY | UPRERAAGT11324 |
| 58 | VIKAS SINGH | UPRERAAGT12163 |
| 59 | vikram Jeet Singh Chadha | UPRERAAGT10805 |
| 60 | VISHAL BAJPAI | UPRERAAGT11344 |
| 61 | vishal srivastava | UPRERAAGT11982 |
Permits & extensions
2 permits
An approval and the date it runs to - not proof the work matching it was done.
2 sanctioning permits are on record with UPRERA, the latest valid to 21 Dec 2022. 1 of them carries a revalidation, valid to 21 Dec 2025.
Sanctioned by Lucknow Development Authority · 13,486 sqm of land · an approved plan of 4 blocks and 642 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | RevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossary | Documents filed |
|---|---|---|---|---|---|---|
| 42742 | 22 Dec 2017 | 21 Dec 2022 | 21 Dec 2025 | 30 Apr 2023 | — | |
| 42742 | 22 Dec 2017 | 21 Dec 2022 | 21 Aug 2028 | 29 Oct 2023 | 22 Aug 2023 valid to 21 Dec 2025 as LDA/BP/21-22/2875 |
| Document | File |
|---|---|
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Sanctioned layout plan The approved layout of the whole site: where the towers, roads and open areas sit on the plot. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
UPRERA’s record carries 2 completion extensions for this project, the latest running to 28 Apr 2025.
| # | Granted from | Extended upto | Note |
|---|---|---|---|
| 1 | 30 Apr 2023 | 29 Oct 2023 | Six months extension in view of force majeure caused by covid-19 pandemic |
| 2 | 29 Oct 2023 | 28 Apr 2025 | — |
Land & documents
13 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 148 | 15180 | — |
| 151 | 7060 | — |
| 148 | 15180 | Khasra |
| 151 | 7060 | Khasra |
7 registry or lease-deed filings are on this project’s record with UPRERA, the earliest dated 16 Jun 2006.
| Registry no. | Date | Type | Area |
|---|---|---|---|
| 5560 | 16 Jun 2006 | self | — |
| 11659 | 15 Dec 2006 | self | — |
| 6260 | 6 Jul 2006 | self | — |
| 7243 | 4 Aug 2006 | self | — |
| 7245 | 4 Aug 2006 | self | — |
| 8419 | 7 Sept 2006 | self | — |
| 5676 | 19 Jun 2006 | self | — |
| Sale deed · 8419 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 5676 The registered deed by which the promoter bought the land. | PDF ↗ |
| Registry document · 05/07 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 08/94 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 20645 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Lease deed · 3837 The deed by which a development authority leased the land to the promoter, with the term and the conditions on it. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 5 Jul 2018 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 3 Jul 2018 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 5 Jul 2018 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 5 Jul 2018 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 5 Jul 2018 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 5 Jul 2018 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 3 Jul 2018 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 3 Jul 2018 ↗ |
Facilities
as declared to RERA
Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.
| Drinking water | yes |
| Fire safety (as filed with RERA) | yes |
| Health service | yes |
| Renewable energy | yes |
| Other facilities | will be provided |
The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.
Quarterly progress reports
21 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
21 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2025-Q1.
| Quarter | Construction | Certificates |
|---|---|---|
| 2020-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | Omaxe Limited |
| Role | Promoter · current |
| RERA ID | UPRERAPRM2386 |
| PAN | AAACO0171H |
| CIN / TAN | DELO01861G |
| Name of chairman | Mr. Rohtash Goel |
| Registered address | SHOP No-19-B, FIRST FLOOR, OMAXE CELEBRATION MALL, SOHNA ROAD, GURGAON-122001 |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Lucknow
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| Bank account as filed | OMAXE LTD PROJECT EWS & LIG GH-VI RERA A/CBankIDBI BANK LIMITEDBranchC.R. PARK NEW DELHIA/C no.IFSCIBKL0000632 |
What has changed on this record
5 movements
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Promoter’s complaints tally (all their projects) | 224 (Under Registration - 4 ) → 225 (Under Registration - 4 ) changed in Estanzo’s record | 18 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 224 (Under Registration - 5 ) → 224 (Under Registration - 4 ) changed in Estanzo’s record | 23 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 223 (Under Registration - 4 ) → 224 (Under Registration - 5 ) changed in Estanzo’s record | 11 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 223 (Under Registration - 5 ) → 223 (Under Registration - 4 ) changed in Estanzo’s record | 7 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 220 (Under Registration - 3 ) → 223 (Under Registration - 5 ) changed in Estanzo’s record | 23 Aug 2026 |
| Promoter’s complaints tally (all their projects) | changed in Estanzo’s record · 18 Oct 2026 · 5 movements on record |
Common questions about GH-6 (EWS & LIG) at Omaxe Integrated Township
Is GH-6 (EWS & LIG) at Omaxe Integrated Township RERA registered?
Yes. GH-6 (EWS & LIG) at Omaxe Integrated Township is registered with UPRERA under registration number UPRERAPRJ15656, registered on 13 Apr 2018. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for GH-6 (EWS & LIG) at Omaxe Integrated Township?
The completion date filed with UPRERA is 28 Apr 2025. No completion certificate is on record yet.
Who is the builder of GH-6 (EWS & LIG) at Omaxe Integrated Township?
Omaxe Limited is the promoter entity that filed GH-6 (EWS & LIG) at Omaxe Integrated Township with UPRERA (promoter RERA ID UPRERAPRM2386). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Has UPRERA granted GH-6 (EWS & LIG) at Omaxe Integrated Township more time to complete?
UPRERA's record carries 2 completion extensions for GH-6 (EWS & LIG) at Omaxe Integrated Township, the latest running to 28 Apr 2025. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.
Does GH-6 (EWS & LIG) at Omaxe Integrated Township have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is GH-6 (EWS & LIG) at Omaxe Integrated Township located?
GH-6 (EWS & LIG) at Omaxe Integrated Township is registered in Lucknow, as filed with UPRERA.
What configurations are available in GH-6 (EWS & LIG) at Omaxe Integrated Township?
The unit plan filed with UPRERA lists OTHER, 1 BHK and SHOP. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in GH-6 (EWS & LIG) at Omaxe Integrated Township?
The approved unit plan filed with UPRERA runs from 13 to 33 m² of carpet area (about 136 to 354 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
How many towers and units are planned in GH-6 (EWS & LIG) at Omaxe Integrated Township?
The approved unit plan describes 4 blocks and 642 units of which 630 are homes and 12 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is GH-6 (EWS & LIG) at Omaxe Integrated Township?
About 193 units per acre: 642 planned units across 3.33 acres (13,486 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗