GODREJ NEST PHASE-1 is a RERA-registered residential project by BRICK RISE DEVELOPERS PVT. LTD. in Gautam Budh Nagar (RERA ID UPRERAPRJ13521). Registered with a completion deadline of 30 Sept 2024.
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ13521 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Noida Authority |
| Proposed start | 1 Apr 2018 |
| Project duration | 78 months |
| Address | Gautam Buddha Nagar, Gautam Budh Nagar |
| Tehsil | Gautam Buddha Nagar |
| Applicant type | Company |
| Applicant address | 7th Floor, Tower B, Plot No.8, Sector 127, Noida-201301 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
1) Master Plan No. IV/1451/950 dated 17.01.2017 2)Building Plan No. IV/1490/929 dated 30.09.2016
Registered with RERA
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
- to
Extension granted
“Six months extension in view of force majeure caused by covid-19 pandemic”
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 11 Oct 2017 |
| Original completion | 31 Mar 2024 |
| Revised completion | 30 Sept 2024 |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹1,38,000 |
| Sanctioning authority | Noida Authority |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
- 3 BHK182 47%
- OTHER72 19%
- 2 BHK68 18%
- 4 BHK56 15%
- PENTHOUSE7 2%
| Configuration | Units | Carpet area |
|---|---|---|
| 3 BHK | 182 | 105-126 |
| PENTHOUSE | 7 | 256-326 |
| OTHER | 72 | 83 |
| 4 BHK | 56 | 150-169 |
| 2 BHK | 68 | 69 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| Tower A1 [(2BHK) Type1] · OTHER, 2 BHK | 19 | 34 | 69 |
| Tower A1 [(3RHK) Type2] · OTHER | 19 | 36 | 83 |
| Tower A2 [(2BHK) Type1] · 2 BHK, OTHER | 19 | 34 | 69 |
| Tower A2 [(3RHK) Type2] · OTHER | 19 | 36 | 83 |
| Tower B3 [3 BHK + S. WC (Type 3)] · 3 BHK, OTHER | 22 | 38 | 105 |
| Tower B3 [3BHK+2 Store/ Utility](Type 4)] · 3 BHK, OTHER | 22 | 40 | 114 |
| Tower B3 [Simplex Penthouse 4BHK+TOI+Lounge+P RM+U · PENTHOUSE, OTHER | 22 | 1 | 256 |
| Tower B3 [Simplex Penthouse+ 4 TOI+lounge+ P RM+Ut · PENTHOUSE, OTHER | 22 | 1 | 256 |
| Tower C1 [3BHK +2Store/Utility] type4 · 3 BHK, OTHER | 22 | 76 | 114 |
| Tower C1 [Simplex penthouse 4BHK+4toi+lounge+P.RM+ · PENTHOUSE, OTHER | 22 | 2 | 256 |
| Tower D1 [3 BHK+2 Store/Utility](Type 6) · OTHER, 3 BHK | 33 | 28 | 126 |
| Tower D1 [4 BHK+Utility/ Store](Type 5) · OTHER, 4 BHK | 33 | 28 | 150 |
| Tower D1 [4 BHK+Utility/Store+ Family Lounge/Study · OTHER, 4 BHK | 33 | 28 | 169 |
| Tower D1 [Duplex Penthouse 4 BHK+Utility](Type 10) · PENTHOUSE, OTHER | 33 | 1 | 284 |
| Tower D1 [Duplex Penthouse 5 BHK+Store+Utility](Ty · PENTHOUSE, OTHER | 33 | 1 | 312 |
| Tower D1 [Duplex Penthouse 5 BHK+Study+Utility](Ty · PENTHOUSE, OTHER | 33 | 1 | 326 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots As per Approved Building Plan |
| 2 | Boundary Wall As per Approved Building Plan |
| 3 | Road Work As per Approved Building Plan |
| 4 | Footpaths As per Approved Building Plan |
| 5 | Water Supply Including Drinking Water Facilities Noida Authority shall provide water supply to the entire society further water will be treated and supplied at customer premise through piping and pumping and gravity system |
| 6 | Sewer System Centralised STP to treat the sewerage and every tower has its own down comers connected to main sewerage line |
| 7 | Drain Centralised STP to treat the sewerage and every tower has its own down comers connected to main sewerage line |
| 8 | Parks As per Approved Building Plan |
| 9 | Tree Planting As per Approved Building Plan |
| 10 | Design For Electric Supply Including Street Lighting Single feeder shall be taken from Noida Electricity board and connected to central substation and entire project shall have street lighting with timer control |
| 11 | Community Buildings Club comprises of ( Multipurpose hall, Swimming Pool, Kids Pool, Zen Room, Squash Court, Gym, Library, Indoor Games,Café/Restaurant) Amphitheater |
| 12 | Treatment and Disposal System of Sewage and Sullage water Central STP for entire project and all towers shall be connected to STP |
| 13 | Solid Waste Management And Disposal System Project shall have waste segregation area and OWC for treatment of organic waste |
| 14 | Water Conservation System Adequate no of Recharge pits made |
| 15 | Energy Management System Including Use of Renewable Energy LED lights and timer control panels shall be used for efficient energy management |
| 16 | Fire Protection And Fire Safety System Fire alarm system provided |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services As per Approved Building Plan |
| 18 | Emergency Evacuation Services As per Approved Building Plan |
| 19 | Other Miscellaneous Work As per Approved Building Plan |
Registered agents
44 agents
Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.
| Sr. | Agent | RERA registration |
|---|---|---|
| 1 | 360 REALTORS LLP | UPRERAAGT10868 |
| 2 | ANAROCK Property Consultants Private Limited | UPRERAAGT10265 |
| 3 | Bajaj Capital Investment Centre Limited | UPRERAAGT11036 |
| 4 | BOP REALTY PRIVATE LIMITED | UPRERAAGT10206 |
| 5 | BULLMEN REALTY INDIA PRIVATE LIMITED | UPRERAAGT10138 |
| 6 | BUNIYAD REALTY LIMITED (Formerly BUNIYAD RETAIL INDIA PRIVATE LIMITED) | UPRERAAGT11569 |
| 7 | Clicbrics Technologies Private Limited. Formerly Redbrics ITES India Pvt Ltd | UPRERAAGT10906 |
| 8 | Cushman & Wakefield India Private Limited | UPRERAAGT11043 |
| 9 | FINDMYPROPERTY PRIVATE LIMITED | UPRERAAGT11867 |
| 10 | GATEWAY PROPMART PVT LTD | UPRERAAGT10384 |
| 11 | Gharondha Estates & financial consultants | UPRERAAGT13048 |
| 12 | HONEY MONEY ASSOCIATES LIMITED | UPRERAAGT11535 |
| 13 | IA Wealth Private Limited(Formaly Investadvise Wealth Management Private Limited) | UPRERAAGT10048 |
| 14 | INDIABULLS INVESTMENT ADVISORS LIMITED | UPRERAAGT10238 |
| 15 | Innovance Realty Private Limited | UPRERAAGT13354 |
| 16 | INVESTORS CLINIC INFRATECH PRIVATE LIMITED | UPRERAAGT10052 |
| 17 | JAI AMBEY CONSULTANTS | UPRERAAGT11064 |
| 18 | JOINT BRICKS PROPMART | UPRERAAGT11518 |
| 19 | Jones Lang LaSalle Property Consultants (India) Pvt Ltd | UPRERAAGT10791 |
| 20 | JUYAL REALTORS | UPRERAAGT11026 |
| 21 | KAPUR ESTATES | UPRERAAGT11301 |
| 22 | KNIGHT FRANK INDIA PVT LTD | UPRERAAGT12268 |
| 23 | LINK PROPERTIES | UPRERAAGT10081 |
| 24 | Mart One Realty Private Limited | UPRERAAGT10104 |
| 25 | Naturetech Realty Private Limited | UPRERAAGT10282 |
| 26 | NEOBRIX CONSULTING PVT LTD | UPRERAAGT10059 |
| 27 | PRIME ESTATES | UPRERAAGT11881 |
| 28 | PROPAMPLE REALTORS (SANJAY MEHRA) | UPRERAAGT12846 |
| 29 | PROPCASA CONSULTANCY PVT. LTD. | UPRERAAGT10038 |
| 30 | PROPERTY JUNCTION PRIVATE LIMITED | UPRERAAGT12902 |
| 31 | Propertypistol Realty Pvt Ltd | UPRERAAGT12730 |
| 32 | PROPSHOP | UPRERAAGT10129 |
| 33 | PROPTIGER MARKETING SERVICES PRIVATE LIMITED(Formerly ELARA MARKETING SERVICES PRIVATE LIMITED) | UPRERAAGT10032 |
| 34 | PUNEET PAAWA | UPRERAAGT11287 |
| 35 | RAJ NANDINI ESTATES PRIVATE LIMITED | UPRERAAGT10793 |
| 36 | REAL BRICKS INFRATECH | UPRERAAGT13418 |
| 37 | REALTY WORLD INFRATECH PVT. LTD. | UPRERAAGT10531 |
| 38 | Sapphire Estate | UPRERAAGT12673 |
| 39 | SMC Real Estate Advisors Private Limited | UPRERAAGT10113 |
| 40 | SQUARE YARDS CONSULTING PRIVATE LIMITED | UPRERAAGT10119 |
| 41 | star estate | UPRERAAGT10202 |
| 42 | STRAIGHTEDGE REAL ESTATE PRIVATE LIMITED | UPRERAAGT10067 |
| 43 | SYNERGY INFRACON | UPRERAAGT10982 |
| 44 | Tarun Jain | UPRERAAGT11119 |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 16 Jan 2022.
Sanctioned by Noida Authority · 26,536 sqm of land · an approved plan of 16 blocks and 385 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| 1) Master Plan No. IV/1451/950 dated 17.01.2017 2)Building Plan No. IV/1490/929 dated 30.09.2016 | 17 Jan 2017 | 16 Jan 2022 | 15 Jan 2027 | 31 Mar 2024 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Project approval The approval the promoter filed as the basis for registering the project. | PDF ↗ |
| Project approval The approval the promoter filed as the basis for registering the project. | PDF ↗ |
| Project approval The approval the promoter filed as the basis for registering the project. | PDF ↗ |
| Project approval The approval the promoter filed as the basis for registering the project. | PDF ↗ |
| Project approval The approval the promoter filed as the basis for registering the project. | PDF ↗ |
| Project approval The approval the promoter filed as the basis for registering the project. | PDF ↗ |
| Project approval The approval the promoter filed as the basis for registering the project. | PDF ↗ |
| Project approval The approval the promoter filed as the basis for registering the project. | PDF ↗ |
| Project approval The approval the promoter filed as the basis for registering the project. | PDF ↗ |
| Sanctioned layout plan The approved layout of the whole site: where the towers, roads and open areas sit on the plot. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Sanctioned layout plan The approved layout of the whole site: where the towers, roads and open areas sit on the plot. | PDF ↗ |
UPRERA’s record carries 1 completion extension for this project, running to 30 Sept 2024.
| # | Granted from | Extended upto | Note |
|---|---|---|---|
| 1 | 31 Mar 2024 | 30 Sept 2024 | Six months extension in view of force majeure caused by covid-19 pandemic |
Land & documents
25 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| SC-02/H&I | 72000 sq. Mtrs | — |
| SC-02, H&I, Sector-150, Noida | 72000 | Plot |
2 registry or lease-deed filings are on this project’s record with UPRERA, the earliest dated 20 Nov 2015.
| Registry no. | Date | Type | Area |
|---|---|---|---|
| . Lease Deed dated 20/11/2015, Book No.1, Volume N | 20 Nov 2015 | self | — |
| Sub Lease Deed Dated 17/06/2016, Book No. 1, Volum | 17 Jun 2016 | self | — |
| Lease deed · Document No. 7362, Volume No. 6993 Page No. 153 to 186 dated 20th November, 2015 The deed by which a development authority leased the land to the promoter, with the term and the conditions on it. | PDF ↗ |
| Lease deed · Document No. 6337, Volume No. 7881 Page No. 251 to 300 The deed by which a development authority leased the land to the promoter, with the term and the conditions on it. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | not reported | — |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 3 Jul 2018 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 3 Jul 2018 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 3 Jul 2018 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 6 Jul 2018 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 6 Jul 2018 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 6 Jul 2018 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 3 Jul 2018 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 3 Jul 2018 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 4 Jul 2018 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 4 Jul 2018 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 11 Oct 2017 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 11 Oct 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 11 Oct 2017 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | Old | 11 Oct 2017 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | Old | 11 Oct 2017 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | Old | 11 Oct 2017 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | Old | 3 Nov 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 13 Nov 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 13 Nov 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 13 Nov 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 13 Nov 2017 ↗ |
Facilities
as declared to RERA
Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.
| Drinking water | only treated water will be provided |
| Fire safety (as filed with RERA) | yes |
| Health service | yes |
| Renewable energy | yes |
| Other facilities | as per master plan |
The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.
Quarterly progress reports
18 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
18 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2024-Q2.
| Quarter | Construction | Certificates |
|---|---|---|
| 2020-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | BRICK RISE DEVELOPERS PVT. LTD. |
| Role | Promoter · current |
| RERA ID | UPRERAPRM27785 |
| PAN | AAGCB6462L |
| CIN / TAN | U70102UP2016PTC077246 |
| Name of chairman | 1,Achal Raina 2.Shankar Ramachandran Bharadwaj |
| Registered address | 7th Floor, Tower B, Plot No.8, Sector 127, Noida-201301 |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Gautam Budh Nagar
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| Bank account as filed | BRICK RISE DEVELOPERS PVT. LTDBankINDUSLND BANK LTDBranchGOPAL DAS BHAWAN 28 BARAH KHAMBHA ROAD NEW DELHIA/C no.IFSCINDB0000005 |
What has changed on this record
4 movements
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Promoter’s complaints tally (all their projects) | 23 (Under Registration - 2 ) → 23 (Under Registration - 0 ) changed in Estanzo’s record | 18 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 22 (Under Registration - 1 ) → 23 (Under Registration - 2 ) changed in Estanzo’s record | 7 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 22 (Under Registration - 2 ) → 22 (Under Registration - 1 ) changed in Estanzo’s record | 9 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 21 (Under Registration - 1 ) → 22 (Under Registration - 2 ) changed in Estanzo’s record | 31 Aug 2026 |
| Promoter’s complaints tally (all their projects) | changed in Estanzo’s record · 18 Oct 2026 · 4 movements on record |
Common questions about GODREJ NEST PHASE-1
Is GODREJ NEST PHASE-1 RERA registered?
Yes. GODREJ NEST PHASE-1 is registered with UPRERA under registration number UPRERAPRJ13521, registered on 11 Oct 2017. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for GODREJ NEST PHASE-1?
The completion date filed with UPRERA is 30 Sept 2024. No completion certificate is on record yet.
Who is the builder of GODREJ NEST PHASE-1?
BRICK RISE DEVELOPERS PVT. LTD. is the promoter entity that filed GODREJ NEST PHASE-1 with UPRERA (promoter RERA ID UPRERAPRM27785). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Has UPRERA granted GODREJ NEST PHASE-1 more time to complete?
UPRERA's record carries 1 completion extension for GODREJ NEST PHASE-1, the latest running to 30 Sept 2024. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.
Does GODREJ NEST PHASE-1 have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is GODREJ NEST PHASE-1 located?
GODREJ NEST PHASE-1 is registered in Gautam Budh Nagar, as filed with UPRERA.
What configurations are available in GODREJ NEST PHASE-1?
The unit plan filed with UPRERA lists 3 BHK, PENTHOUSE, OTHER, 4 BHK and 2 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in GODREJ NEST PHASE-1?
The approved unit plan filed with UPRERA runs from 69 to 326 m² of carpet area (about 745 to 3,507 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
How many towers and units are planned in GODREJ NEST PHASE-1?
The approved unit plan describes 16 blocks and 385 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is GODREJ NEST PHASE-1?
About 59 units per acre: 385 planned units across 6.56 acres (26,536 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗