Godrej Nurture Phase-1

UPRERARegistered

Godrej Nurture Phase-1 is a RERA-registered residential project by BRICK RISE DEVELOPERS PVT. LTD. in Gautam Budh Nagar (RERA ID UPRERAPRJ17861). Registered with a completion deadline of 28 Sept 2025.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ17861
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryNoida Authority
Proposed start1 Jan 2019
Project duration81 months
AddressGautam Buddha Nagar, Gautam Budh Nagar
TehsilGautam Buddha Nagar
Applicant typeCompany
Applicant address7th Floor, Tower B, Plot No.8, Sector 127, Noida-201301
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    1) Master PLan No. IV/1451/950 2)Building Plan No. Noida M.V.N/2016/IV-1490/929 dated 30/09/2016

  2. Registered with RERA

  3. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  4. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  5. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  6. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered30 Oct 2018
Original completion29 Mar 2025
Revised completion28 Sept 2025
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹1,37,000
Sanctioning authorityNoida Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors399 · 6 · 33 (units from plan)
Homes · commercial units385 · 14 (shops and offices filed in the same plan)
  • 3 BHK182 46%
  • OTHER72 18%
  • 2 BHK68 17%
  • 4 BHK56 14%
  • SHOP14 4%
  • PENTHOUSE7 2%
ConfigurationUnitsCarpet area
3 BHK182105-126
PENTHOUSE7256-326
OTHER7283
4 BHK56150-169
2 BHK6869
SHOP1418
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
COMMERCIAL · SHOP21418
TOWER-A1a · OTHER, 2 BHK197069-83
TOWER-A2a · OTHER, 2 BHK197069-83
TOWER-B3a · 3 BHK, PENTHOUSE, OTHER2280105-256
TOWER-C1a · OTHER, 3 BHK, PENTHOUSE2278114-256
TOWER-D1a · OTHER, 4 BHK, PENTHOUSE, 3 BHK3387126-326
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Arcop Associates. Pvt. Ltd.
License CA/2001/27447
Plot No-36, Jharsa Road, Sector 32, Gurugram, Haryana 122018
Engineer
TPC Technical Projects Consultants Pvt. ltd
B-74, Sector- 57, Noida 201301
Contractor
Contractor to be decided
Contractor to be decided
Sr.Development work declared to RERA
1Demarcation of Plots
As per Approved Building Plan
2Boundary Wall
As per Approved Building Plan
3Road Work
As per Approved Building Plan
4Footpaths
As per Approved Building Plan
5Water Supply Including Drinking Water Facilities
Noida Authority shall provide water supply to the entire society further water will be treated and supplied at customer premise through piping and pumping and gravity system
6Sewer System
Centralised STP to treat the sewerage and every tower has its own down comers connected to main sewerage line
7Drain
Common drainage system designed for complete project rain water is connected to recharge pits and finally it’s overflow to govt drain line
8Parks
as per approved building plan
9Tree Planting
as per approved Building PLan
10Design For Electric Supply Including Street Lighting
Single feeder shall be taken from Noida Electricity board and connected to central substation and entire project shall have street lighting with timer control
11Community Buildings
Club complete with recreational water feature
12Treatment and Disposal System of Sewage and Sullage water
Central STP for entire project and all towers shall be connected to STP
13Solid Waste Management And Disposal System
Project shall have waste segregation area and OWC for treatment of organic waste
14Water Conservation System
Adequate no of Recharge pits made
15Energy Management System Including Use of Renewable Energy
LED lights and timer control panels shall be used for efficient energy management
16Fire Protection And Fire Safety System
Fire alarm system provided
17Social Infrastructure And Other Public Amenities Including Public Health Services
As per approved building plan
18Emergency Evacuation Services
As per approved building plan
19Other Miscellaneous Work
as per approved building plan
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

43 agents

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1360 REALTORS LLPUPRERAAGT10868
2ANAROCK Property Consultants Private LimitedUPRERAAGT10265
3Bajaj Capital Investment Centre LimitedUPRERAAGT11036
4BOP REALTY PRIVATE LIMITEDUPRERAAGT10206
5BULLMEN REALTY INDIA PRIVATE LIMITEDUPRERAAGT10138
6BUNIYAD REALTY LIMITED (Formerly BUNIYAD RETAIL INDIA PRIVATE LIMITED)UPRERAAGT11569
7Clicbrics Technologies Private Limited. Formerly Redbrics ITES India Pvt LtdUPRERAAGT10906
8Cushman & Wakefield India Private LimitedUPRERAAGT11043
9FINDMYPROPERTY PRIVATE LIMITEDUPRERAAGT11867
10GATEWAY PROPMART PVT LTDUPRERAAGT10384
11Gharondha Estates & financial consultantsUPRERAAGT13048
12HONEY MONEY ASSOCIATES LIMITEDUPRERAAGT11535
13IA Wealth Private Limited(Formaly Investadvise Wealth Management Private Limited)UPRERAAGT10048
14INDIABULLS INVESTMENT ADVISORS LIMITEDUPRERAAGT10238
15Innovance Realty Private LimitedUPRERAAGT13354
16INVESTORS CLINIC INFRATECH PRIVATE LIMITEDUPRERAAGT10052
17JAI AMBEY CONSULTANTSUPRERAAGT11064
18JOINT BRICKS PROPMARTUPRERAAGT11518
19Jones Lang LaSalle Property Consultants (India) Pvt LtdUPRERAAGT10791
20JUYAL REALTORSUPRERAAGT11026
21KAPUR ESTATESUPRERAAGT11301
22KNIGHT FRANK INDIA PVT LTDUPRERAAGT12268
23LINK PROPERTIESUPRERAAGT10081
24Mart One Realty Private LimitedUPRERAAGT10104
25Naturetech Realty Private LimitedUPRERAAGT10282
26NEOBRIX CONSULTING PVT LTDUPRERAAGT10059
27PRIME ESTATESUPRERAAGT11881
28PROPAMPLE REALTORS (SANJAY MEHRA)UPRERAAGT12846
29PROPCASA CONSULTANCY PVT. LTD.UPRERAAGT10038
30PROPERTY JUNCTION PRIVATE LIMITEDUPRERAAGT12902
31Propertypistol Realty Pvt LtdUPRERAAGT12730
32PROPSHOPUPRERAAGT10129
33PROPTIGER MARKETING SERVICES PRIVATE LIMITED(Formerly ELARA MARKETING SERVICES PRIVATE LIMITED)UPRERAAGT10032
34PUNEET PAAWAUPRERAAGT11287
35RAJ NANDINI ESTATES PRIVATE LIMITEDUPRERAAGT10793
36REAL BRICKS INFRATECHUPRERAAGT13418
37REALTY WORLD INFRATECH PVT. LTD.UPRERAAGT10531
38Sapphire EstateUPRERAAGT12673
39SMC Real Estate Advisors Private LimitedUPRERAAGT10113
40SQUARE YARDS CONSULTING PRIVATE LIMITEDUPRERAAGT10119
41star estateUPRERAAGT10202
42STRAIGHTEDGE REAL ESTATE PRIVATE LIMITEDUPRERAAGT10067
43SYNERGY INFRACONUPRERAAGT10982
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 16 Jan 2022.

Sanctioned by Noida Authority · 26,380 sqm of land · an approved plan of 6 blocks and 399 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
1) Master PLan No. IV/1451/950 2)Building Plan No. Noida M.V.N/2016/IV-1490/929 dated 30/09/201617 Jan 201716 Jan 202216 Jan 202729 Mar 2025
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 1 completion extension for this project, running to 28 Sept 2025.

#Granted fromExtended uptoNote
129 Mar 202528 Sept 2025Six months extension in view of force majeure caused by covid-19 pandemic

Land & documents

14 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
SC/02 H and I72000Plot
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Lease deed · 6337
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Lease deed · 7362
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Allotment letter from the authority · Noida/commercial/2014/1498
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Document checklist
DocumentStatusUploaded
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
not reported—
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
not reported—
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New23 Oct 2018 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New22 Oct 2018 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New22 Oct 2018 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New23 Oct 2018 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New23 Oct 2018 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New23 Oct 2018 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New23 Oct 2018 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New25 Oct 2018 ↗

Quarterly progress reports

22 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

22 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2025-Q2.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
2024-Q4—CA ↗ · Arch ↗ · Eng ↗
2025-Q1—CA ↗ · Arch ↗ · Eng ↗
2025-Q267%CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2025-Q2. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameBRICK RISE DEVELOPERS PVT. LTD.
RolePromoter · current
RERA IDUPRERAPRM27785
PANAAGCB6462L
CIN / TANU70102UP2016PTC077246
Name of chairman1,Achal Raina 2.Shankar Ramachandran Bharadwaj
Registered address7th Floor, Tower B, Plot No.8, Sector 127, Noida-201301
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Gautam Budh Nagar

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
Brick Rise Developers Pvt. Ltd.BankIndusInd Bank LtdBranchGurgaonA/C no.IFSCINDB0000724
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

4 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)23 (Under Registration - 2 ) → 23 (Under Registration - 0 )
changed in Estanzo’s record
18 Oct 2026
Promoter’s complaints tally (all their projects)22 (Under Registration - 1 ) → 23 (Under Registration - 2 )
changed in Estanzo’s record
7 Oct 2026
Promoter’s complaints tally (all their projects)22 (Under Registration - 2 ) → 22 (Under Registration - 1 )
changed in Estanzo’s record
9 Sept 2026
Promoter’s complaints tally (all their projects)21 (Under Registration - 1 ) → 22 (Under Registration - 2 )
changed in Estanzo’s record
31 Aug 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 18 Oct 2026 · 4 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about Godrej Nurture Phase-1

Is Godrej Nurture Phase-1 RERA registered?

Yes. Godrej Nurture Phase-1 is registered with UPRERA under registration number UPRERAPRJ17861, registered on 30 Oct 2018. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for Godrej Nurture Phase-1?

The completion date filed with UPRERA is 28 Sept 2025. No completion certificate is on record yet.

Who is the builder of Godrej Nurture Phase-1?

BRICK RISE DEVELOPERS PVT. LTD. is the promoter entity that filed Godrej Nurture Phase-1 with UPRERA (promoter RERA ID UPRERAPRM27785). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted Godrej Nurture Phase-1 more time to complete?

UPRERA's record carries 1 completion extension for Godrej Nurture Phase-1, the latest running to 28 Sept 2025. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does Godrej Nurture Phase-1 have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Godrej Nurture Phase-1 located?

Godrej Nurture Phase-1 is registered in Gautam Budh Nagar, as filed with UPRERA.

What configurations are available in Godrej Nurture Phase-1?

The unit plan filed with UPRERA lists 3 BHK, PENTHOUSE, OTHER, 4 BHK, 2 BHK and SHOP. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in Godrej Nurture Phase-1?

The approved unit plan filed with UPRERA runs from 18 to 326 m² of carpet area (about 194 to 3,507 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in Godrej Nurture Phase-1?

The approved unit plan describes 6 blocks and 399 units of which 385 are homes and 14 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is Godrej Nurture Phase-1?

About 61 units per acre: 399 planned units across 6.52 acres (26,380 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗