Golden I Phase-III

UPRERARegistered

Golden I Phase-III is a RERA-registered commercial project by OCEAN INFRAHEIGHTS PRIVATE LIMITED in Gautam Budh Nagar (RERA ID UPRERAPRJ732580). Registered with a completion deadline of 23 Dec 2026.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Construction progress

As filed in quarterly progress reports · % complete · latest filed Apr–Jun 2026
Quarters shown are calendar quarters. UP-RERA files them by financial year.
—Q3'24
—Q4'24
12%Q1'25
12%Q2'25
12%Q3'25
12%Q4'25
14%Q1'26
27%Q2'26

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ732580
Project categoryCommercial
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryGreater Noida Authority
Proposed start1 Jul 2022
Project duration54 months
AddressPlot No. 11, Tech Zone 4, Greater NOIDA (West), Gautam Buddha Nagar, UP – 201318, Gautam Buddha Nagar, Gautam Budh Nagar
TehsilGautam Buddha Nagar
Applicant typeCompany
Applicant addressRegistered Office Address- Plot No. 11, Tech Zone 4, Greater NOIDA (West), Gautam Buddha Nagar, UP - 201318, Corporate Office Address- H-191, Sector-63, Noida, UP-201301, Site Address- Plot No. 11, Tech Zone 4, Greater NOIDA (West), Gautam Buddha Nagar, UP - 201318.
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    PLG/BP/SM-24-May-2019.5533

  2. Registered with RERA

  3. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  4. to

    Extension granted

  5. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  6. to

    Extension granted

    “Extension of validity on account of Force Majeure as per MoHUA advisory dated 31-07-2026”

  7. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered5 Jan 2022
Original completion30 Dec 2024
Revised completion23 Dec 2026
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹93,000
Sanctioning authorityGreater Noida Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors500 · 1 · 15 (units from plan)
ConfigurationUnitsCarpet area
OTHER50035-51
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
T4 · OTHER1550035-51
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Raman Sikka- Sikka Associates Architects
License Regn. No. 93/ 16497
A-2/1, Africa Avenue, Safadarjung Enclave, New Delhi-110029
Engineer
Maqsud Nazar
NNC Design International, G-70, 2nd Floor, Jaswant Plaza, Shaheen Bagh, New Delhi- 110025
Contractor
Rajesh Kumar- RN Buildcon
Plot No. 11, Sector Techzone 4, Greater Noida West , Greater Noida, Gautam Buddha Nagar, Uttar Pradesh
Sr.Development work declared to RERA
1Demarcation of Plots
Plot No.-11, Sector Techzoe-4,Greater Noida( West) demarcation has been done Greater Noida Industrial Development Authority ( GNIDA). Phase III is shown as per site Plan.
2Boundary Wall
Boundary wall shall be secured by natural wall of out facing shops other barrier.
3Road Work
Road work will be done using R.C.C./ interlocking tiles as per Sanctioned Plan.
4Footpaths
Footpath will be constructed using interlocking / Paver as per Sanctioned Plan.
5Water Supply Including Drinking Water Facilities
Drinking Water will be provided by government supply and it will be stored in under ground / overhead tanks and STP treated water will be available for gardening and flushing as per Plans.
6Sewer System
Proper Sewerage system will be constructed using R.C.C./ UPVC pipes as per drawings and it will be treated with STP. STP treated water will be used as mentioned above and residual will be disposed of in government sewerage system.
7Drain
Draining System will be constructed using R.C.C./ UPVC pipes as per drawings.
8Parks
Proper Park/ Green Area will be developed as per Sanctioned layout Plans.
9Tree Planting
Sufficient number of trees as per Sanctioned Layout will be planted in the project.
10Design For Electric Supply Including Street Lighting
HT Electrical supply will be made by NPCL / competent authority , a sub station will be set-up in project as per drawings and LT electrical supply will be available for individual unit(s) . Sufficient power backup arrangement will be made using DG Sets. Street Lighting will be done using LT supply / Power back-up.
11Community Buildings
No
12Treatment and Disposal System of Sewage and Sullage water
Sewerage Treatment plant will be installed / constructed as per approved drawings. All sewerage will be treated and treated water will be available for gardening and flushing and residual of sewerage treatment plant will be drained in government sewer system.
13Solid Waste Management And Disposal System
Solid waste will be collected manually and disposal will be done as per norms.
14Water Conservation System
Water conservation will be done by rain water harvesting system and through Sewerage Treatment Plant( STP).
15Energy Management System Including Use of Renewable Energy
Good quality and approved brand equipment will be used in sub -station to minimize energy loss and Solar Energy System will be installed as per norms and approved drawings.
16Fire Protection And Fire Safety System
Fire Fighting system including hydrant, sprinkler system, and fire alarms will be installed as per drawings. Fire escape staircase will be constructed as per drawings. Refuge area will be made as per norms.
17Social Infrastructure And Other Public Amenities Including Public Health Services
Shopping Complex , Food court are available in the project.
18Emergency Evacuation Services
Fire staircase refuge area will provided as per requirement for evacuation in case of any emergency.
19Other Miscellaneous Work
Proper security system including security guards, CCTV Cameras and controlled access will be made available
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

17 agents

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1ANAROCK Property Consultants Private LimitedUPRERAAGT10265
2AU FAIT FINCARE PRIVATE LIMITEDUPRERAAGT11379
3BLUECRUMBS INFRA PRIVATE LIMITEDUPRERAAGT16897
4Easy Street Consulting Private Limited (formally Known as Easy Street Infra Services Private Limited)UPRERAAGT12595
5KASHAVI A COMPLETE PROPERTY SOLUTION PRIVATE LIMITEDUPRERAAGT22119
6MANOJ KUMAR VERMAUPRERAAGT19282
7Mart One Realty Private LimitedUPRERAAGT10104
8Nishan Engineering Services Private LimitedUPRERAAGT19512
9Pegasus Infra Consulting Pvt Ltd ( formerly known as Investors Infrahome Pvt Ltd)UPRERAAGT10062
10Prashant KaushikUPRERAAGT14090
11Rajesh Kumar RaiUPRERAAGT25912
12Rajesh SinghUPRERAAGT11077
13Reckon Projects Pvt.Ltd.UPRERAAGT10043
14REDBRIX INFRATECH PVT LTDUPRERAAGT17707
15ROHIT SHARMAUPRERAAGT19112
16Vaibhav khandelwalUPRERAAGT11045
17Vivek singhUPRERAAGT25488
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 24 Aug 2026.

Sanctioned by Greater Noida Authority · 8,207 sqm of land · an approved plan of 1 block and 500 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
PLG/BP/SM-24-May-2019.553325 Aug 202124 Aug 202624 Aug 203130 Dec 2024
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 2 completion extensions for this project, the latest running to 23 Dec 2026.

#Granted fromExtended uptoNote
130 Dec 202423 Dec 2026—
224 Aug 202623 Dec 2026Extension of validity on account of Force Majeure as per MoHUA advisory dated 31-07-2026

Land & documents

15 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
Plot No. 11, Sector Techzone- IV, Greater Noida West100035.70Plot
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Lease deed · 18290
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Allotment letter from the authority · GNIDA/I.T./2016/9278
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Allotment letter from the authority · Land Title Search Report
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Allotment letter from the authority · Affidavit
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Allotment letter from the authority · Reply Letter to UPRERA for Objection Project Registration
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
PDF ↗
Document checklist
DocumentStatusUploaded
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New23 Nov 2021 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New23 Nov 2021 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New23 Nov 2021 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New23 Nov 2021 ↗
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
New23 Nov 2021 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New23 Nov 2021 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New23 Nov 2021 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New23 Nov 2021 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New23 Nov 2021 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New23 Nov 2021 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New23 Nov 2021 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New23 Nov 2021 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New23 Nov 2021 ↗

Quarterly progress reports

16 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

16 quarterly progress reports are on file with UPRERA, covering 2022-Q2 to 2026-Q1.

QuarterConstructionCertificates
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
2024-Q412%CA ↗ · Arch ↗ · Eng ↗
2025-Q112%CA ↗ · Arch ↗ · Eng ↗
2025-Q212%CA ↗ · Arch ↗ · Eng ↗
2025-Q312%CA ↗ · Arch ↗ · Eng ↗
2025-Q414%CA ↗ · Arch ↗ · Eng ↗
2026-Q127%CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameOCEAN INFRAHEIGHTS PRIVATE LIMITED
RolePromoter · current
RERA IDUPRERAPRM5807
PANAABCO7770M
CIN / TANKNPO01239A
Name of chairmanMr. Anand Kumar Shukla
Registered addressRegistered Office Address- Plot No. 11, Tech Zone 4, Greater NOIDA (West), Gautam Buddha Nagar, UP - 201318, Corporate Office Address- H-191, Sector-63, Noida, UP-201301, Site Address- Plot No. 11, Tech Zone 4, Greater NOIDA (West), Gautam Buddha Nagar, UP - 201318.
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Gautam Budh Nagar

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
Ocean Infraheights Pvt. Ltd. Collection Account for Golden I Phase-IIIBankAxis Bank LimitedBranchSector-62, NOIDABranch addressThe Corenthum , GF, Office No.1, Lobe-05 Tower A, Plot No.A-41,Sector 62, NOIDA, Uttar Pradesh, PIN-201301Branch districtGautam Buddha NagarA/C no.IFSCUTIB0000723
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
Ocean Infraheights Pvt. Ltd. Separate Bank Account for Golden I Phase-IIIBankAxis Bank LimitedBranchSector 62, NOIDABranch addressThe Corenthum, GF, Office No. 1, Lobe-05 Tower A, Plot No. A-41, Sector 62, NOIDA, Uttar Pradesh, PIN- 201301Branch districtGautam Buddha NagarA/C no.IFSCUTIB0000723
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
Ocean Infraheights Pvt. Ltd. RERA Transaction Account for Golden I Phase-IIIBankAxis Bank LimitedBranchSector 62, NOIDABranch addressThe Corenthum, GF, Office No. 1, Lobe-05 Tower A, Plot No. A-41, Sector 62, NOIDA, Uttar Pradesh, PIN- 201301Branch districtGautam Buddha NagarA/C no.IFSCUTIB0000723
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

8 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)53 (Under Registration - 2 ) → 53 (Under Registration - 0 )
changed in Estanzo’s record
13 Sept 2026
Revised completion date on file2026-12-24 → 2026-12-23
changed in Estanzo’s record
7 Sept 2026
Completion extension
no. 2 — extended upto
2026-12-24 → 2026-12-23
changed in Estanzo’s record
7 Sept 2026
Completion extension
no. 1 — extended upto
2026-08-24 → 2026-12-23
changed in Estanzo’s record
7 Sept 2026
Revised completion date on file2026-08-24 → 2026-12-24
changed in Estanzo’s record
5 Sept 2026
Completion date promised at registration2024-12-30
first recorded by Estanzo
5 Sept 2026
Completion extension
no. 2
extension 2 to 2026-12-24
newly filed with RERA
5 Sept 2026
Promoter’s complaints tally (all their projects)53 (Under Registration - 3 ) → 53 (Under Registration - 2 )
changed in Estanzo’s record
23 Aug 2026
When these facts last moved
Revised completion date on filechanged in Estanzo’s record · 7 Sept 2026 · 2 movements on record
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 13 Sept 2026 · 2 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about Golden I Phase-III

Is Golden I Phase-III RERA registered?

Yes. Golden I Phase-III is registered with UPRERA under registration number UPRERAPRJ732580, registered on 5 Jan 2022. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for Golden I Phase-III?

The completion date filed with UPRERA is 23 Dec 2026. No completion certificate is on record yet.

Who is the builder of Golden I Phase-III?

OCEAN INFRAHEIGHTS PRIVATE LIMITED is the promoter entity that filed Golden I Phase-III with UPRERA (promoter RERA ID UPRERAPRM5807). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted Golden I Phase-III more time to complete?

UPRERA's record carries 2 completion extensions for Golden I Phase-III, the latest running to 23 Dec 2026. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does Golden I Phase-III have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Golden I Phase-III located?

Golden I Phase-III is registered in Gautam Budh Nagar, as filed with UPRERA.

What configurations are available in Golden I Phase-III?

The unit plan filed with UPRERA lists OTHER. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in Golden I Phase-III?

The approved unit plan filed with UPRERA runs from 35 to 51 m² of carpet area (about 375 to 548 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in Golden I Phase-III?

The approved unit plan describes 1 block and 500 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is Golden I Phase-III?

About 247 units per acre: 500 planned units across 2.03 acres (8,207 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗