Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ6747
Project categoryCommercial
Registration typeOngoing
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryGreater Noida Authority
Proposed start16 Jun 2017
Original start16 Jun 2017
Project duration78 months
AddressGautam Buddha Nagar, Gautam Budh Nagar
TehsilGautam Buddha Nagar
Applicant typeCompany
Applicant addressRegistered Office Address- Plot No. 11, Tech Zone 4, Greater NOIDA (West), Gautam Buddha Nagar, UP - 201318, Corporate Office Address- H-191, Sector-63, Noida, UP-201301, Site Address- Plot No. 11, Tech Zone 4, Greater NOIDA (West), Gautam Buddha Nagar, UP - 201318.
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. 2 building permits sanctioned

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. valid to

    Permit revalidated

    PLG/BP/SM-24-MAY-2019:5533

  5. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  6. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  7. Extension granted (2)

  8. Completion certificate filed

  9. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered9 Aug 2017
Original completion15 Jun 2022
Revised completion13 Dec 2023
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary15 Mar 2023
Registration fee₹6,22,000
Sanctioning authorityGreater Noida Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors2,810 · 8 · 26 (units from plan)
Homes · commercial units2,374 · 436 (shops and offices filed in the same plan)
  • OTHER2,160 77%
  • SHOP436 16%
  • STUDIO118 4%
  • 3 BHK96 3%
ConfigurationUnitsCarpet area
OTHER2,1608-205
SHOP4367-261
STUDIO11827-27
3 BHK9668
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
BLOCK A · SHOP, OTHER73908-39
BLOCK B · SHOP, OTHER75697-37
BLOCK C · SHOP, OTHER75188-172
BLOCK D&E · SHOP, OTHER764917-261
BLOCK F · OTHER66596-1,671
H2 · STUDIO1511827-27
H3 · 3 BHK249668
T3 · OTHER1246419-130
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.The plan also files 1,671.03 m² for a OTHER, 1,671.03 m² for a OTHER, 1,671.03 m² for a OTHER and 10 other units like them, far outside the rest of that type, so the ranges above leave them out.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Sikka Associates Architects- Raman Sikka
License Regn. No. 93/16497
E-24 South Extension 1 New Delhi, 110049
Engineer
Mr. Hari Shankar
G-70, 2nd Floor, Jaswant Plaza, Near Kalindi Kunj, Main Sarita Vihar Road, Okhla, New Delhi-110025
Contractor
Divyam Developers Pvt. Ltd
9-10/3 Laxman House, Aasaf Ali Road, New Delhi-6
Sr.Development work declared to RERA
1Demarcation of Plots
Plot No-11, Sector Techzone -4, Greater Noida, demarcation by Greater Noida Authority. Phase 1 is shown as per site plan.
2Boundary Wall
Boundary wall shall be secured by natural wall of out facing shops & other barrier.
3Road Work
Road work will be done using R.C.C/ interlocking tiles as per plans.
4Footpaths
Footpath will be constructed using Interlocking/ Paver as per plans.
5Water Supply Including Drinking Water Facilities
Drinking water will be provided by government supply and it will be stored in under ground / overhead water tanks and STP treated water will be available for gardening and flushing as per plans.
6Sewer System
Proper sewarge system will be constructed using R.C.C /UPVC pipes as per drawings and it will be treated with STP. STP treated water will be used as mentioned above and residual will be disposed of in government sewarge system.
7Drain
Draining system will be constructed using R.C.C /UPVC pipes as per drawings.
8Parks
Proper park / green area will be developed as per sanctioned layout partially in phase-1 and rest later on.
9Tree Planting
Sufficient number of trees as per approved layout (approx. 750 trees) will be planted in both phases.
10Design For Electric Supply Including Street Lighting
HT electrical supply will be made by NPCL/competent authority, a sub-station will be set-up on project as per drawing and LT electrical supply will be avialable for individual unit. Sufficeint power back-up arrangement will be made using DG Sets. Street Lighting will be done using LT supply/power back-up.
11Community Buildings
Club/Community Hall will be constructed for residential units with proper facilities.
12Treatment and Disposal System of Sewage and Sullage water
Sewarge Treatment Plant will be installed / constructed as per approved drawings. All sewarage will be treated and treated water will be available for gardening and flushing and residual of sewarage treatment plant will be drained in government sewer system.
13Solid Waste Management And Disposal System
Solid waste will be collected manually and disposal will be done as per norms.
14Water Conservation System
Water conservation will be done by rain water harvesting system and sewerage treatment plant.
15Energy Management System Including Use of Renewable Energy
Good Quality and approved brand equipments will be used in sub-station to minimise energy loss and solar energy system will be installed as per norms and approved drawings.
16Fire Protection And Fire Safety System
Fire Fighting System including hydrant,sprinkler system, and fire alarms will be installed as per drawings. Fire escape staircase will be constructed as per drawings. Refuge area will be made as per norms.
17Social Infrastructure And Other Public Amenities Including Public Health Services
Shopping Complex, Food court, Multiplex Cinema Hall, are available in Phase-1
18Emergency Evacuation Services
Fire staircase & refuge area will provided as per requirment for evacuation in case of any emergency.
19Other Miscellaneous Work
Proper security system including security guards, CCTV camera and controlled access will be made available.
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

16 agents

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1ANAROCK Property Consultants Private LimitedUPRERAAGT10265
2AU FAIT FINCARE PRIVATE LIMITEDUPRERAAGT11379
3BLUECRUMBS INFRA PRIVATE LIMITEDUPRERAAGT16897
4Easy Street Consulting Private Limited (formally Known as Easy Street Infra Services Private Limited)UPRERAAGT12595
5KASHAVI A COMPLETE PROPERTY SOLUTION PRIVATE LIMITEDUPRERAAGT22119
6MANOJ KUMAR VERMAUPRERAAGT19282
7Mart One Realty Private LimitedUPRERAAGT10104
8Nishan Engineering Services Private LimitedUPRERAAGT19512
9Pegasus Infra Consulting Pvt Ltd ( formerly known as Investors Infrahome Pvt Ltd)UPRERAAGT10062
10Rajesh Kumar RaiUPRERAAGT25912
11Rajesh SinghUPRERAAGT11077
12Reckon Projects Pvt.Ltd.UPRERAAGT10043
13REDBRIX INFRATECH PVT LTDUPRERAAGT17707
14ROHIT SHARMAUPRERAAGT19112
15Vaibhav khandelwalUPRERAAGT11045
16Vivek singhUPRERAAGT25488
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

2 permits

An approval and the date it runs to - not proof the work matching it was done.

2 sanctioning permits are on record with UPRERA, the latest valid to 15 Jun 2022. 1 of them carries a revalidation, valid to 24 Aug 2026.

Sanctioned by Greater Noida Authority · 61,138 sqm of land · an approved plan of 8 blocks and 2810 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endRevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossaryDocuments filed
37805 - 350916 Jun 201715 Jun 202215 Jun 202715 Jun 2022—
37805 - 350916 Jun 201715 Jun 202224 Aug 203114 Dec 202225 Aug 2021
valid to 24 Aug 2026
as PLG/BP/SM-24-MAY-2019:5533
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 3 completion extensions for this project, the latest running to 13 Dec 2023.

#Granted fromExtended uptoNote
115 Jun 202214 Dec 2022Six months extension in view of force majeure caused by covid-19 pandemic
214 Dec 202213 Dec 2023—
314 Dec 202213 Dec 2023—

Land & documents

17 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
Plot No 11, Tech Zone IV Greater Noida West100035.70Plot
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Lease deed · 18290
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Allotment letter from the authority · GNIDA/I.T./2016/9278
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Allotment letter from the authority · Land Title Search Report
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Document checklist
DocumentStatusUploaded
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
not reported—
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New7 Oct 2021 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New6 Oct 2021 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New6 Oct 2021 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New7 Oct 2021 ↗
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
New7 Oct 2021 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New7 Oct 2021 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New7 Oct 2021 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New7 Oct 2021 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New7 Oct 2021 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New19 Jul 2018 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New6 Oct 2021 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New6 Oct 2021 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New6 Oct 2021 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old31 Jul 2017 ↗

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking waterAs approved by Competent Authority
Fire safety (as filed with RERA)As approved by Competent Authority
Renewable energyAs approved by Competent Authority
Other facilitiesAs approved by Competent Authority

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Quarterly progress reports

15 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

15 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2023-Q3.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameOCEAN INFRAHEIGHTS PRIVATE LIMITED
RolePromoter · current
RERA IDUPRERAPRM5807
PANAABCO7770M
CIN / TANKNPO01239A
Name of chairmanMr. Anand Kumar Shukla
Registered addressRegistered Office Address- Plot No. 11, Tech Zone 4, Greater NOIDA (West), Gautam Buddha Nagar, UP - 201318, Corporate Office Address- H-191, Sector-63, Noida, UP-201301, Site Address- Plot No. 11, Tech Zone 4, Greater NOIDA (West), Gautam Buddha Nagar, UP - 201318.
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Gautam Budh Nagar

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
Ocean Infraheights Pvt. LtdBankCorporation BankBranchVadhundraA/C no.IFSCCORP0002106
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

3 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)53 (Under Registration - 2 ) → 53 (Under Registration - 0 )
changed in Estanzo’s record
13 Sept 2026
Completion extension
no. 3
extension 3 to 2023-12-13
newly filed with RERA
3 Sept 2026
Promoter’s complaints tally (all their projects)53 (Under Registration - 3 ) → 53 (Under Registration - 2 )
changed in Estanzo’s record
23 Aug 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 13 Sept 2026 · 2 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

Common questions about Golden I Phase-I

Is Golden I Phase-I RERA registered?

Yes. Golden I Phase-I is registered with UPRERA under registration number UPRERAPRJ6747, registered on 9 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.

Has Golden I Phase-I been completed?

UPRERA still lists Golden I Phase-I as Registered, so it is not shown as completed here. A completion certificate dated 15 Mar 2023 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.

Who is the builder of Golden I Phase-I?

OCEAN INFRAHEIGHTS PRIVATE LIMITED is the promoter entity that filed Golden I Phase-I with UPRERA (promoter RERA ID UPRERAPRM5807). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted Golden I Phase-I more time to complete?

UPRERA's record carries 3 completion extensions for Golden I Phase-I, the latest running to 13 Dec 2023. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does Golden I Phase-I have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Golden I Phase-I located?

Golden I Phase-I is registered in Gautam Budh Nagar, as filed with UPRERA.

What configurations are available in Golden I Phase-I?

The unit plan filed with UPRERA lists OTHER, SHOP, STUDIO and 3 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in Golden I Phase-I?

The approved unit plan filed with UPRERA runs from 7 to 261 m² of carpet area (about 75 to 2,814 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in Golden I Phase-I?

The approved unit plan describes 8 blocks and 2,810 units of which 2,374 are homes and 436 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is Golden I Phase-I?

About 186 units per acre: 2,810 planned units across 15.11 acres (61,138 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗