Grace City Land

UPRERAAbeyanceRERA data as of 17 Aug 2026

Grace City Land is a RERA-registered residential project by Graceland Developers Private Limited in Kanpur Nagar (RERA ID UPRERAPRJ11311). RERA status: Abeyance. Data as reported by UP-RERA. as reported by UPRERA

RERA status as reported: Abeyance.
Project cost
14
Land area
18,820 4.65 acres
Units
not reported
Density (derived)
not reported
Towers
not reported
Config
not reported
Carpet
not reported
Registered
15 Aug 2017

Basic details

Descriptive fields the promoter entered when registering. UP-RERA publishes them as filed and does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ11311
Project categoryResidential
Registration typeOngoing
RERA statusAbeyanceAbeyance“Held in suspension.” UP-RERA lists projects whose registration it has placed in abeyance.Read the full entry in the glossary
Proposed start21 Sept 2017
Original start21 Sept 2017
Project duration66
AddressKanpur, Kanpur Nagar
TehsilKanpur
Coordinates26.429976, 80.279347
Applicant typeCompany
Applicant addressSHOP NO 101/102, WHC ROAD, SWAPNIL TARANGINI APARTMENT, PLOT NO J-12, LAXMI NAGAR NAGPUR, MAHARASHTR
Applicant contact9970022555 · info@gracelands.co.in

Registration & timeline

Dates on the registration itself. They do not describe the state of construction - the quarterly reports are where that is filed.

RERA registered15 Aug 2017
Promised completion20 Sept 2022
Revised completion19 Mar 2023
Completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹1,28,500

Project team & development works

The filing names who was engaged and what was promised. It carries no status against any individual work, so none is shown.

Architect
Rahul Deshpandey
License CA/2000/26055
H Block 301, Sanchayani Prestige Complex, Swavlambi Nagar, Nagpur 440022
Engineer
Rajat Kumar Khare
B 5 Sarvoday Nagar, kanpur 208005

Permits & extensions

0 permits

A permit shows an approval and the date it runs to, not that work matching it has been done.

18,819.7 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.

Plans and approvals filed with RERA
DocumentFile
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 1 completion extension for this project, running to 19 Mar 2023.

#Granted fromExtended uptoNote
120 Sept 202219 Mar 2023Six months extension in view of force majeure caused by covid-19 pandemic

Land & documents

17 filings

What the promoter placed on the record about how it holds the land. Not a title search - nothing here confirms the land is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
11952460
11979120
1198310
120110140
12004610
12051230
12026040
1199920
12032660
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

4 registry or lease-deed filings are on this project’s record with UPRERA, the earliest dated 17 Jul 2014.

Registry no.DateTypeArea
710917 Jul 2014self
710817 Jul 2014self
860726 Aug 2014self
80427 Aug 2014self
Document checklist
DocumentStatusUploaded
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old14 Aug 2017
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
Old14 Aug 2017
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
Old14 Aug 2017
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
Old14 Aug 2017
Water supply plan
How the project proposed to supply water, as filed at registration.
Old14 Aug 2017
Electricity supply plan
How the project proposed to supply power, as filed at registration.
Old14 Aug 2017
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
Old14 Aug 2017
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
Old14 Aug 2017

Facilities

as declared to RERA

What the promoter declared at registration, in most cases a reference number for a filing made elsewhere such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking waterYes
Fire safety (as filed with RERA)Yes
Health serviceNo
Renewable energyNo
Other facilitiesDoor Video Calling, CCTV

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Data as reported by UPRERA

Promoter (SPV) details

The legal entity carrying this project’s obligations under the Act. It may not be the brand the project is marketed under.

Legal nameGraceland Developers Private Limited
Roleprimary · current
RERA IDUPRERAPRM12556
PANAAFCG6515Q
CIN / TANU45303MH2014PTC255847
Name of chairmanPARESH SHYAM BHIDE
Registered addressSHOP NO 101/102, WHC ROAD, SWAPNIL TARANGINI APARTMENT, PLOT NO J-12, LAXMI NAGAR NAGPUR, MAHARASHTR
RERA contactinfo@gracelands.co.in · 9970022555
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details - public record, shown as reported by UPRERA. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Kanpur Nagar

Straight-line distance between the coordinates each project filed with RERA. Not a comparison, a ranking or a travel distance.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that any money is in these accounts, and account details change - verify against the official source before any payment.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
Graceland Developers Private LimitedBankState Bank of IndiaBranchKarrahi BranchA/C no.36619722510IFSCSBIN0015624
Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

A row is when Estanzo first observed a difference, not proof that RERA’s record changed on that date.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

3 not published

These are fields UP-RERA has not published for this project. The authority’s coverage is uneven and older registrations carry less of it, so an absence here is not evidence that anything is wrong - it is simply something this page cannot answer, and worth asking about.

  • No sanctioning permit is published for this project.Ask which authority sanctioned the plans, for the permit number, and for the date it is valid to.
  • No quarterly progress report is published for this project.Ask the promoter for the latest quarterly report filed and the construction percentage certified in it.
  • No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.

Common questions about Grace City Land

Is Grace City Land RERA registered?

Yes. Grace City Land is registered with UPRERA under registration number UPRERAPRJ11311, registered on 15 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for Grace City Land?

The completion date filed with UPRERA is 19 Mar 2023. No completion certificate is on record yet.

Who is the builder of Grace City Land?

Graceland Developers Private Limited is the promoter entity that filed Grace City Land with UPRERA (promoter RERA ID UPRERAPRM12556). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted Grace City Land more time to complete?

UPRERA's record carries 1 completion extension for Grace City Land, the latest running to 19 Mar 2023. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does Grace City Land have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Grace City Land located?

Grace City Land is registered in Kanpur Nagar, as filed with UPRERA.

Data as reported by UPRERA, as of 17 Aug 2026. official source ↗