GREEN ESTATE is a RERA-registered residential project by GOLDEN SAHKARI AWAS SAMITI LIMITED in BHAGIPUR, JHUNSI, Prayagraj (RERA ID UPRERAPRJ164505). Registered with a completion deadline of 29 Jun 2027.
RERA status as reported: Registered.Construction progress
Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ164505 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Prayagraj(Allahabad) Development Authority |
| Proposed start | 1 Jul 2025 |
| Project duration | 24 months |
| Address | ARAZI NO 84 PART, 85 PART, 86, 87, 89 MI, BHAGIPUR, JHUNSI, Phulpur, Prayagraj |
| Tehsil | Phulpur |
| Applicant type | Societies |
| Applicant address | 135B/8N CHAK NIRATUL RAJROOPPUR PRAYAGRAJ |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
- valid to
Permit revalidated
Patrank-105/Pra.A.-Bhawan/Zone-5/Prasta./L.O.P./2013-14/2013-14 Dated 30/06/2022
2 building permits sanctioned
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 26 Dec 2025 |
| Original completion | 29 Jun 2027 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹89,000 |
| Sanctioning authority | Prayagraj(Allahabad) Development Authority |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots AS PER APPROVED MAP A TOTAL 74 PLOTS ARE BEING DEVELOPED OF VARIOUS SIZES. DEMARCATION OF PLOT WILL BE DONE WITH RCC PILLARS ON FOUR CORNERS OF 3 FT HEIGHT. |
| 2 | Boundary Wall PROJECT BOUNDED BY COMPOUND WALL. THE SAID BOUNDRY WALL IS CONSTRUCTED WITH 9 INCH THICK BRICK WORK AND 6 FT IN HEIGHT. THE CONSTRUCTION IS DONE BY FLY ASH AND RED BRICK USING CEMENT MORTAR IN 1-6 RATIO. |
| 3 | Road Work THE INTERNAL ROAD 4734.56 SQ MTR WILL BE DEVELOPED WITHIN THE PROJECT WITH 9 MTR WIDTH. ROAD CONSTRUCTION IS CARRIED OUT WITH BASIC EARTH WORK FOLLOWED BY WBM . GSB AND STONE DUST AND GANGA SAND FOLLOWED WITH EXTENSIVE COMPACTION AND THEREAFTER FINISHED WITH RCC WORK |
| 4 | Footpaths THE FOOTPATH (3FT WIDE) HAVE BEEN DESIGNED TO CARRY SEWER (6INCH HUME PIPE )WATER LINE (6 INCH PVC PIPE) DRAIN PIPE. ALL THESE SERVICES ARE UNDERGROUND. THE FOOTPATH CONSTRUCTED USING PAVER BLOCKS WITH KERB STONE (12INCH WIDE) |
| 5 | Water Supply Including Drinking Water Facilities WATER IS BEING SUPPLED THROUG BOREWELL WITH 6INCH BORING AND 5 HP PUMP |
| 6 | Sewer System A NEWORK UNDERGORUND 6 INCH HUME PIPE WILL BE LAID TO CARRY SEWAGE FROM HOUSEHOLD TO STP PLACED WITHIN THE PROJECT. |
| 7 | Drain WASTE WATER FROM HOUSEHOLD THROUGH 6INCH PVC PIPE WHICH IS LAID UNDERGROUND DEPENDING UPON THE CLASSIFICATION OF WASTE WATER |
| 8 | Parks THE TOTAL PARK AREA TO BE DEVELOPED AS PER HORTICULTURE PLAN. THE PARK WILL BE BOUNDE BY MS GRILL AND LIGHTING ARRANGEMENT AND PARK BENCHES WILL BE INSTALLED REGULAR INTERVALS. |
| 9 | Tree Planting MORE THAN 100 TREE WILL BE IMPLANTED IN THE PROJECT. FLOWERING PLANTS AND EVERGEEN PLANT WILL BE PLANTED IN OPERN AREAS AND OTHER INSTALLATION |
| 10 | Design For Electric Supply Including Street Lighting CABLE WILL BE USED TO SUPPLY LT POWER . WE WILL DESIGN AND IMPLEMENT THE SYSTEM AS PER LOCAL AUTHORITY BOARD AND WILL BE CONSIDER CENTRALIZED TRANSFORMER. |
| 11 | Community Buildings CONSIDERING SIZE OF PROJECT NO SUCH COMMUNITY BUILDING IS PLANNED |
| 12 | Treatment and Disposal System of Sewage and Sullage water THE SEWAGE AND SULLAGE WATER WILL BE CARRIED FROM HOUSEHOLD THROUGH UNDERGROUND SERVICE PIPE TO STP. |
| 13 | Solid Waste Management And Disposal System STP PLANNED FOR THE PROJECT WORK BREAK DOWN SOLID WASTE AND FILTERED WATER IS RECEIVED FROM THE INCOMING GREY WATER |
| 14 | Water Conservation System WE WILL SUGGEST TO INDIVIDUAL TO USE LOW FLOW FIXTURE AS WELL DUAL FLUSH CISTERN AND RAW WATER HARVESTING SYSTEM TO REDUCE THE WATER CONSUMPTION AND IMPROVE THE GROUND WATER LEVEL. |
| 15 | Energy Management System Including Use of Renewable Energy THE ELECTRICAL PLAN OF THE PROJECT HAS BEEN DEVELOPED AS PER THE NORMS OF THE UP ELECTRICITY BOARD AND PuVVNL. |
| 16 | Fire Protection And Fire Safety System BEING A PLOTTED DEVELOPMENT PROJECT THE REQUIREMENT FOR FIRE PROTECTION IS LIMITED, HOWEVER 08 NUMBER OF FIRE HYDRANT AND SAND BUCKETS HAVE BEEN PLACED IN VARIOUS COMMON AREA |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services NOT APPLICABLE IN THIS PROJECT. |
| 18 | Emergency Evacuation Services WE WILL HAVE STAIRCASES WHICH WILL BE PROVIDED WITH EMERGENCY EXIT DOORS AND EMERGENCY EXIT GATES |
| 19 | Other Miscellaneous Work DEVELOPMENT NORMS AND RULES AND COMMITEMENT MADE IN THE DEVELOPMENT PLANS WILL BE ADHERE TO |
Permits & extensions
2 permits
An approval and the date it runs to - not proof the work matching it was done.
2 sanctioning permits are on record with UPRERA, the latest valid to 29 Jun 2027. 1 of them carries a revalidation, valid to 29 Jun 2027.
Sanctioned by Prayagraj(Allahabad) Development Authority · 16,766 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | RevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossary | Documents filed |
|---|---|---|---|---|---|---|
| Patrank-105/Pra.A.-Bhawan/Zone-5/Prasta./L.O.P./2013-14 Dated 30/06/2022 | 30 Jun 2022 | 29 Jun 2027 | 29 Jun 2027 | 29 Jun 2027 | — | |
| Patrank-105/Pra.A.-Bhawan/Zone-5/Prasta./L.O.P./2013-14/2013-14 Dated 30/06/2022 | 30 Jun 2022 | 29 Jun 2027 | 21 Sept 2031 | 29 Jun 2027 | 30 Jun 2022 valid to 29 Jun 2027 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
Land & documents
25 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 86 | 2230 | Khasra |
| 269 | 1140 | Khasra |
| 269Part | 2280 | Khasra |
| 84 Part | 2472.21 | Khasra |
| 85Part | 2186.67 | Khasra |
| 87 | 630 | Khasra |
| 85 | 2186.67 | Khasra |
| 89mi | 1140 | Khasra |
| 286A | 2500 | Khasra |
| Registry document · 1-5075/201-234/9812 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 1/4225/153-180/1014 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 1/4304/93-116/2521 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 1/4462/137-178/5606 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 1/4344/99-126/3340 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 1/4209/257-278/705 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 1/4594/37-70/8412 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 1/5177/115-150/1575 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Khatauni extract · 1428-1433 (01 July, 2020 to 30 June, 2026) An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1428-1433 (01 July,2020 to 30 June, 2026) An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1428-1433 (01 July,2020 to 30 June, 2026) An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1428-1433 (01 July, 2020 to 30 June, 2026) An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1428-1433 (01 July, 2020 to 30 June, 2026) An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1427-1432 (01 July, 2019 to 30 June, 2025) An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1428-1433 (01 July,2020 to 30 June,2026) An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1427-1432 (01July,2019 to 30 June,2025) An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Registry document · WahiNo.04/ZildNo.119/PageNo.303-322/183 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 1/4352/1-28/3490 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 1/4312/63-86/2670 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 25 Aug 2025 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 25 Aug 2025 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 25 Aug 2025 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 25 Aug 2025 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 25 Aug 2025 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 25 Aug 2025 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 25 Aug 2025 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 25 Aug 2025 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 5 Sept 2025 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 10 Nov 2025 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 10 Nov 2025 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 10 Nov 2025 ↗ |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | New | 9 Dec 2025 ↗ |
| Agreement for sale (proforma) The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind. | New | 25 Aug 2025 ↗ |
Quarterly progress reports
4 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
4 quarterly progress reports are on file with UPRERA, covering 2025-Q2 to 2026-Q1.
| Quarter | Construction | Certificates |
|---|---|---|
| 2025-Q2 | 50% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q3 | 50% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q4 | 50% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q1 | 65% | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | GOLDEN SAHKARI AWAS SAMITI LIMITED |
| Role | Promoter · current |
| RERA ID | UPRERAPRM189412 |
| PAN | AABAG6993L |
| CIN / TAN | ALDG02924F |
| Registered address | 135B/8N CHAK NIRATUL RAJROOPPUR PRAYAGRAJ |
| RERA contact | |
| Registered since | 2022 |
| Legal name | MOHAMMAD AFZAL KHAN |
| Role | Co-promoter |
| Applicant type | Individual |
| Address | CHAK HARI HAR VAN JHUNSI PRAYAGRAJ-211019 |
| RERA contact |
| Legal name | RAJEEV NAAGAR |
| Role | Co-promoter |
| Applicant type | Individual |
| Address | 97, CHAK NIRATUL, CHAUFATKA, GTB NAGAR, PRAYAGRAJ-211016 |
| RERA contact |
Nearby projects
Prayagraj
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | Golden Sahkari Awas Samiti- Collection A/c for Green EstateBankIndian BankBranchHindi Sahitya Sammelan BranchBranch addressHindi Sahitya Sammelan Marg 12, K.P. Kakkar Road, Prayagraj-211019Branch districtPrayagrajA/C no.IFSCIDIB000A580Branch emailA580@indianbank.co.in |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | Golden Sahkari Awas Samiti- Separate A/c for Green EstateBankIndian BankBranchHindi Sahitya Sammelan BranchBranch addressHindi Sahitya Sammelan marg 12, KP Kakkar Road, PrayagrajBranch districtPrayagraj, Uttar PradeshA/C no.IFSCIDIB000A580 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | Golden Sahkari Awas Samiti- Transaction A/c for Green EstateBankIndian BankBranchHindi Sahitya Sammelan branchBranch addressHindi Sahitya Sammelan Marg, 12, KP Kakkar Road, Prayagraj-211019Branch districtPrayagraj, Uttar PradeshA/C no.IFSCIDIB000A580 |
What has changed on this record
5 movements
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Permit paperwork 2 · Project Specifications | Project Specifications newly filed with RERA | 29 Sept 2026 |
| Permit paperwork 2 · Approved Map | Approved Map newly filed with RERA | 29 Sept 2026 |
| Permit paperwork 2 · Sanctioned Letter | Sanctioned Letter newly filed with RERA | 29 Sept 2026 |
| Permit paperwork 2 · Approved Layout | Approved Layout newly filed with RERA | 29 Sept 2026 |
| Sanctioning permit no. 2 | Patrank-105/Pra.A.-Bhawan/Zone-5/Prasta./L.O.P./2013-14/2013-14 Dated 30/06/2022 newly filed with RERA | 29 Sept 2026 |
What to verify and what to ask
2 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about GREEN ESTATE
Is GREEN ESTATE RERA registered?
Yes. GREEN ESTATE is registered with UPRERA under registration number UPRERAPRJ164505, registered on 26 Dec 2025. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for GREEN ESTATE?
The completion date filed with UPRERA is 29 Jun 2027. No completion certificate is on record yet.
Who is the builder of GREEN ESTATE?
GOLDEN SAHKARI AWAS SAMITI LIMITED is the promoter entity that filed GREEN ESTATE with UPRERA (promoter RERA ID UPRERAPRM189412). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does GREEN ESTATE have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is GREEN ESTATE located?
GREEN ESTATE is registered in BHAGIPUR, JHUNSI, Prayagraj, as filed with UPRERA.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗