Green Heights-1 is a RERA-registered residential project by A TO Z BUILDERS AND DEVELOPERS in Meerut (RERA ID UPRERAPRJ386533). Registered with a completion deadline of 29 Jul 2026.
RERA status as reported: Registered.Construction progress
Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ386533 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Meerut Development Authority |
| Proposed start | 15 Aug 2021 |
| Project duration | 60 months |
| Address | Sardhana, Meerut |
| Tehsil | Sardhana |
| Applicant type | Partnership Firm |
| Applicant address | K-6 PALLAV PURAM PHASE-II MODIPURAM MEERUT |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
Plotted Resi development/ Plotted Housing /00272/MDA/LD/20-21/0181/31082020
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 22 Oct 2021 |
| Original completion | 29 Jul 2026 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹1,23,500 |
| Sanctioning authority | Meerut Development Authority |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots Demarcation of plots already done and the complete detail of plots given in the project specification attached with land details |
| 2 | Boundary Wall BOUNDARY WALL all sides 6ft heights, 9 inches width made of bricks |
| 3 | Road Work internal roads with soiling coat stone ballast 40-63 mm gauge, inter coat stone ballast 25-55 mm gauage, tack coat on w.b.m surface p/a 5cm thick BM and brick edging on both sides |
| 4 | Footpaths NOT APPLICABLE |
| 5 | Water Supply Including Drinking Water Facilities r.c.c overhead tank shaft typr 150 KL capacity over a staging of 16 meter from g.l to top of bottom as per drawing, P.V.C pipe fixing with proper earth work to provide drinking water facilities |
| 6 | Sewer System SICTC OF 400KLD ANAEROBIC TYPE SEWAGE TREATMENT SYSTEM WITH ALL CIVIL ELECTRICAL AND MECHANICAL COMMISSIONING N.P. R.C.C SPUN PIPE INTO TRENCHES IN DEPTH UPTO 1.20 MTR BELOW GROUND LEVEL TRUE TO SLIGNMENT CAULKING THE JOINTS WITH NECESSARY SPUN YARN |
| 7 | Drain EARTH WORK IN EXCAVATION , CONCRETE WITH 40MM GAUGE B.B FINE SAND AND CEMENT MORTAR IN 12.6.1 AND ALL COMPLETE,1ST CLASS B/W IN CM (1-4) CM |
| 8 | Parks PARKS WILL BE AS PER DEVELPMENT PLAN ATTACHED AND WILL BE COVERED BY BOUNDARY WALL OF 2 FT NHEIGHTS AND WILL HAVE SHADY TREES, GREEN GRASS SITTING BENCHES AND SWINGS FOR CHILDREN |
| 9 | Tree Planting SHADY TREES AT BOTH SIDES OF INTERNALS ROAD AND IN PARKS |
| 10 | Design For Electric Supply Including Street Lighting 500 KW CONNECTION ALREADY APPLIED IRON POLES AT AVERAGE DISTANCE OF 25 TO 30 METER ALUMINIUM WIRING APPROX 35 L.E.D LIGHTS TO COVER 90 PLOTS AND 2 TRNASFORMERS EACH OF 250 KW |
| 11 | Community Buildings NOT APPLICABLE |
| 12 | Treatment and Disposal System of Sewage and Sullage water 400 KLD/400 HOUSES SEWEAGE WASTE WATER TREATMENT SYSTEM AS PER LAYOUT AND DRAWINGS |
| 13 | Solid Waste Management And Disposal System DOOR TO DOOR COLLECTION OF SOLID WASTE AND DUMP BY NAGAR NIGAM |
| 14 | Water Conservation System 2 RAIN WATER HARVESTING SYSTEMS TO MAINTAIN GROUND WATER LEVEL AND AVOID WATER LOGGING WILL BE GIVEN IN PARK AS PER LAYOUT AND DRAWINGS |
| 15 | Energy Management System Including Use of Renewable Energy NOT APPLICABLE |
| 16 | Fire Protection And Fire Safety System NOT APPLICABLE |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services NOT APPLICABLE |
| 18 | Emergency Evacuation Services NOT APPLICABLE |
| 19 | Other Miscellaneous Work NOT APPLICABLE |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 29 Jul 2026.
Sanctioned by Meerut Development Authority · 23,654 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| Plotted Resi development/ Plotted Housing /00272/MDA/LD/20-21/0181/31082020 | 30 Jul 2021 | 29 Jul 2026 | 29 Jul 2029 | 29 Jul 2026 |
| Document | File |
|---|---|
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
Land & documents
28 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 1410 | 500 | Khasra |
| 1411 | 4050 | Khasra |
| 1412 | 2910 | Khasra |
| 1417 | 970 | Khasra |
| 1393 | 2030 | Khasra |
| 1393 | 2020 | Khasra |
| 1392F | 2020 | Khasra |
| 1392 | 1145.16 | Khasra |
| 1390 | 2020 | Khasra |
| 1391 | 1290 | Khasra |
| 1428 | 1376 | Khasra |
| 1429 | 675 | Khasra |
| 1430 | 442 | Khasra |
| 1420 | 1245 | Khasra |
| 1394 | 2025 | Khasra |
| Registry document · 10522 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 3035 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 9568 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 4721 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 12149 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 15967 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 12285 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 15543 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 19354 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 15544 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 9693 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Khatauni extract · 1427-1432 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Registry document · Project Specification The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 14 Oct 2021 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 13 Oct 2021 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 17 Sept 2021 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 17 Sept 2021 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 17 Sept 2021 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 17 Sept 2021 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 17 Sept 2021 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 14 Oct 2021 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 13 Oct 2021 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 14 Oct 2021 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 14 Oct 2021 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 14 Oct 2021 ↗ |
Quarterly progress reports
21 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
21 quarterly progress reports are on file with UPRERA, covering 2021-Q2 to 2026-Q2.
| Quarter | Construction | Certificates |
|---|---|---|
| 2021-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q2 | 100% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q3 | 100% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q4 | 100% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q1 | 100% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | A TO Z BUILDERS AND DEVELOPERS |
| Role | Promoter · current |
| RERA ID | UPRERAPRM149070 |
| PAN | AANFA5223C |
| CIN / TAN | MRTA02612B |
| Registered address | K-6 PALLAV PURAM PHASE-II MODIPURAM MEERUT |
| RERA contact | |
| Registered since | 2021 |
Nearby projects
Meerut
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | A to Z Builders And DevelopersBankBank of MaharashtraBranchDulehra ChauhanBranch addressDulehra Chauhan Supertech Meerut sports City VillageBranch districtMeerutA/C no.IFSCMAHB0001755 |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | A to Z Builders And DevelopersBankBank of MaharashtraBranchDulehra ChauhanBranch addressDulehra Chauhan Supertech MeerutBranch districtMeerutA/C no.IFSCMAHB0001755 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | A to Z Builders And DevelopersBankBANK OF MAHARASHTRABranchDULEHRA CHAUHANBranch addressDULEHRA CHAUHAN SUPERTECH MEERUTBranch districtMeerutA/C no.IFSCMAHB0001755 |
What has changed on this record
1 movement
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Quarterly progress report 2026-Q2 | QPR 2026-Q2 newly filed with RERA | 15 Oct 2026 |
What to verify and what to ask
2 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about Green Heights-1
Is Green Heights-1 RERA registered?
Yes. Green Heights-1 is registered with UPRERA under registration number UPRERAPRJ386533, registered on 22 Oct 2021. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for Green Heights-1?
The completion date filed with UPRERA is 29 Jul 2026. No completion certificate is on record yet.
Who is the builder of Green Heights-1?
A TO Z BUILDERS AND DEVELOPERS is the promoter entity that filed Green Heights-1 with UPRERA (promoter RERA ID UPRERAPRM149070). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does Green Heights-1 have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is Green Heights-1 located?
Green Heights-1 is registered in Meerut, as filed with UPRERA.