MEERUT SPORTS CITY (PHASE-I)

UPRERANCLT

MEERUT SPORTS CITY (PHASE-I) is a RERA-registered residential project by SUPERTECH LIMITED in Meerut (RERA ID UPRERAPRJ5767). RERA status: NCLT (since 25 Mar 2022). UP-RERA flags this project "Default on QPR": it has not filed its mandatory quarterly progress report(s).

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: NCLT.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ5767
Project categoryResidential
Registration typeOngoing
RERA statusNCLTNCLTThe tribunal that hears company insolvency cases. UP-RERA lists projects whose promoter is before it.Read the full entry in the glossary
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryMeerut Development Authority
Proposed start10 May 2011
Original start10 May 2011
Project duration146 months
AddressSardhana, Meerut
TehsilSardhana
Applicant typeCompany
Applicant address1114 HAMKUNT CHAMBERS ,11 FLOOR 89, NEHRU PLACE NEW DELHI DL 110019 INDIA
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  2. Registered with RERA

  3. NCLT order

  4. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  5. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  6. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as NCLT. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly reports are in default on this project’s record.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered12 Aug 2017
Original completion30 Dec 2022
Revised completion29 Jun 2023
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹1,60,500
Sanctioning authorityMeerut Development Authority
NCLT order date25 Mar 2022

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors834 · 6 · 16 (units from plan)
  • 3 BHK297 36%
  • 1 BHK269 32%
  • 2 BHK209 25%
  • 4 BHK59 7%
ConfigurationUnitsCarpet area
3 BHK29775-85
2 BHK20950-50
1 BHK26932-32
4 BHK5928
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
A3 · OTHER, 4 BHK165928
C2 · OTHER, 3 BHK168975-85
C6 · OTHER, 3 BHK168975-85
D1 · OTHER, 3 BHK1611975-85
F2 · OTHER, 2 BHK1620950-50
G1 · OTHER, 1 BHK1626932-32
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Space Designer International
License CA/98/23185
B-34 Sec-67 Noida ( UP)
Engineer
Optimization Consultant
Karampura Moti Nagar , Delhi
Sr.Development work declared to RERA
1Demarcation of Plots
As per approved building plans
2Boundary Wall
As per approved building plans
3Road Work
As per approved building plans
4Footpaths
As per approved building plans
5Water Supply Including Drinking Water Facilities
Water shall be provided by Authority & internal distribution shall be done by developer.
6Sewer System
STP shall be provided for sewerage system.
7Drain
Proper drainage system shall be provided
8Parks
As per approved plans
9Tree Planting
As per approved plans
10Design For Electric Supply Including Street Lighting
As per approval from authority.
11Community Buildings
As per approved building plans
12Treatment and Disposal System of Sewage and Sullage water
STP shall be provided for sewerage system and treated water shall be used for flushing & irrigation system.
13Solid Waste Management And Disposal System
Waste shall be segregated and will be treated by organic waste converter. Manure produced shall be used in green area and surplus effluent shall be disposed to authorized vendors.
14Water Conservation System
Adequate nos of recharge pits shall be provided
15Energy Management System Including Use of Renewable Energy
In common areas LED lights shall be provided with timer control.
16Fire Protection And Fire Safety System
As per fire NOC
17Social Infrastructure And Other Public Amenities Including Public Health Services
As per approved building plans
18Emergency Evacuation Services
As per fire NOC
19Other Miscellaneous Work
As per approved building plans
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

1 agent

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1INVESTORS CLINIC INFRATECH PRIVATE LIMITEDUPRERAAGT10052
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

0 permits

An approval and the date it runs to - not proof the work matching it was done.

Sanctioned by Meerut Development Authority · 31,018 sqm of land · an approved plan of 6 blocks and 834 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 1 completion extension for this project, running to 29 Jun 2023.

#Granted fromExtended uptoNote
130 Dec 202229 Jun 2023Six months extension in view of force majeure caused by covid-19 pandemic

Land & documents

21 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
789-792 to 797Shivay jamaulampur dulhera chauhan—
7802780Khasra
7911260Khasra
7921260Khasra
7931490Khasra
794630Khasra
7951900Khasra
7961390Khasra
7971265Khasra
8012740Khasra
8043790Khasra
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

1 registry or lease-deed filing is on this project’s record with UPRERA, dated 3 May 2008.

Registry no.DateTypeArea
47833 May 2008self—
Document checklist
DocumentStatusUploaded
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New6 Jul 2018 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New6 Jul 2018 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New6 Jul 2018 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New6 Jul 2018 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New6 Jul 2018 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New6 Jul 2018 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New6 Jul 2018 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New6 Jul 2018 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New6 Jul 2018 ↗
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
Old28 Apr 2018 ↗

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking waterOwn Arrengment
Fire safety (as filed with RERA)As per Applicable bye laws, code & slandered norms
Health serviceOwn arrangement for STP & Drainage & Rain Harvesting System .

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Quarterly progress reports

5 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

5 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2021-Q1.

QuarterConstructionCertificates
2020-Q1—Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—Arch ↗ · Eng ↗
2020-Q4—Eng ↗
2021-Q1—Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameSUPERTECH LIMITED
RolePromoter · current
RERA IDUPRERAPRM1754
PANAABCS0646N
CIN / TANU74899DL1995PLC074422
Name of chairmanRam Kishor Arora
Registered address1114 HAMKUNT CHAMBERS ,11 FLOOR 89, NEHRU PLACE NEW DELHI DL 110019 INDIA
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Meerut

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
Supertech LimitedBankPUNJAB NATIONAL BANKBranchPUNJAB NATIONAL BANK MANGAL PANDEY NAGAR MEERUTA/C no.IFSCPUNB0620400
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

3 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)2803 (Under Registration - 3 ) → 2803 (Under Registration - 2 )
changed in Estanzo’s record
18 Oct 2026
Promoter’s complaints tally (all their projects)2802 (Under Registration - 2 ) → 2803 (Under Registration - 3 )
changed in Estanzo’s record
27 Sept 2026
Promoter’s complaints tally (all their projects)2802 (Under Registration - 3 ) → 2802 (Under Registration - 2 )
changed in Estanzo’s record
23 Aug 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 18 Oct 2026 · 3 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No sanctioning permit is published for this project.Ask which authority sanctioned the plans, for the permit number, and for the date it is valid to.

Common questions about MEERUT SPORTS CITY (PHASE-I)

Is MEERUT SPORTS CITY (PHASE-I) RERA registered?

Yes. MEERUT SPORTS CITY (PHASE-I) is registered with UPRERA under registration number UPRERAPRJ5767, registered on 12 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for MEERUT SPORTS CITY (PHASE-I)?

The completion date filed with UPRERA is 29 Jun 2023. No completion certificate is on record yet.

Who is the builder of MEERUT SPORTS CITY (PHASE-I)?

SUPERTECH LIMITED is the promoter entity that filed MEERUT SPORTS CITY (PHASE-I) with UPRERA (promoter RERA ID UPRERAPRM1754). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Why does MEERUT SPORTS CITY (PHASE-I) show "default on QPR"?

UPRERA flags this project as in default on quarterly progress reporting - the promoter has not filed one or more mandatory quarterly progress reports. The flag is the authority's, not Estanzo's.

Has UPRERA granted MEERUT SPORTS CITY (PHASE-I) more time to complete?

UPRERA's record carries 1 completion extension for MEERUT SPORTS CITY (PHASE-I), the latest running to 29 Jun 2023. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does MEERUT SPORTS CITY (PHASE-I) have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is MEERUT SPORTS CITY (PHASE-I) located?

MEERUT SPORTS CITY (PHASE-I) is registered in Meerut, as filed with UPRERA.

What configurations are available in MEERUT SPORTS CITY (PHASE-I)?

The unit plan filed with UPRERA lists OTHER, 3 BHK, 2 BHK, 1 BHK and 4 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in MEERUT SPORTS CITY (PHASE-I)?

The approved unit plan filed with UPRERA runs from 28 to 85 m² of carpet area (about 298 to 914 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in MEERUT SPORTS CITY (PHASE-I)?

The approved unit plan describes 6 blocks and 834 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is MEERUT SPORTS CITY (PHASE-I)?

About 109 units per acre: 834 planned units across 7.66 acres (31,018 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗