GREEN ORCHID

UPRERARegistered

GREEN ORCHID is a RERA-registered residential project by S.L Group and Associates in Moradabad (RERA ID UPRERAPRJ6472). Registered with a completion deadline of 30 Sept 2020. UP-RERA flags this project "Default on QPR": it has not filed its mandatory quarterly progress report(s).

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ6472
Project categoryResidential
Registration typeOngoing
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryMoradabad Development Authority
Proposed start14 May 2016
Original start14 May 2016
Project duration53 months
AddressMoradabad, Moradabad
TehsilMoradabad
Applicant typePartnership Firm
Applicant addressB-49 MASAROVAR COLONY DELHI ROAD MORADABAD
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Permit revalidated (2)

  2. 3 building permits sanctioned

  3. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  4. Registered with RERA

  5. to

    Extension granted

  6. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  7. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  8. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly reports are in default on this project’s record.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered31 Jul 2017
Original completion31 Mar 2019
Revised completion30 Sept 2020
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹53,000
Sanctioning authorityMoradabad Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors298 · 4 · 14 (units from plan)
Homes · commercial units292 · 6 (shops and offices filed in the same plan)
  • 2 BHK182 61%
  • 3 BHK98 33%
  • 4 BHK12 4%
  • SHOP6 2%
ConfigurationUnitsCarpet area
2 BHK18254-54
4 BHK12154-260
3 BHK9870-89
SHOP613-22
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
TOWER A · 2 BHK, 4 BHK1410654-54
TOWER B · 2 BHK, 4 BHK148054
TOWER C · 3 BHK, 4 BHK145470-185
TOWER C2 · SHOP, 3 BHK, 4 BHK145813-185
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
SPACE DESIGNER INTERNATIONAL ARCHITECT PVT LTD
B 34, SECTOR 67, NOIDA UP
Engineer
S DAC ENGINEERS PVT LTD
52, SECTOR 5 VAISHALI GHAZIABAD UP
Contractor
MAHI BUILD HOME PVT LTD
27- FF , KADAMBA SHOPPING COMPLEX , GAMA 1ST, GREATER NOIDA , UP
Sr.Development work declared to RERA
1Demarcation of Plots
9529.51 SQ. MT.
2Boundary Wall
1800 mm high, along entire periphery.
3Road Work
Interlocking Pavers
4Footpaths
Interlocking Pavers
5Water Supply Including Drinking Water Facilities
ONE Under Ground Tanks of 75 KL capacity each
6Sewer System
Underground system using uPVC (SN-4) pipes.
7Drain
Underground system using uPVC (SN-4) sewer pipes.
8Parks
Parks having total area of 1129.21 sq. m. shall be provided
9Tree Planting
50Nos. trees are to be planted out of that 50% will be evergreen tree.
10Design For Electric Supply Including Street Lighting
Two Electricity Transformers of 500 KVA capacity each shall be used along with necessary switch-gear for distributing electricity at LT voltage
11Community Buildings
Built up area of community buildings shall be 240 .02sq. m.
12Treatment and Disposal System of Sewage and Sullage water
STP of capacity 100 KLD shall be provided. Treated water shall be used for flushing, irrigation, carwash, pathways cleaning and excess sewage shall be discharged in the municipal sewer.
13Solid Waste Management And Disposal System
Manual collection and organic waste converter shall be provided in the project
14Water Conservation System
Rain water harvesting facilities shall be provided and treated sewage water shall be recycled to the extent feasible
15Energy Management System Including Use of Renewable Energy
Solar panels shall be provided on terrace for renewable energy. Single point metering will be there for energy purchased from the grid/ power supply company.
16Fire Protection And Fire Safety System
Fire tender path shall be provided as per NBC. Fire fighting systems along with pumps and water storage tanks shall be provided as per NBC &NOC from fire depp.
17Social Infrastructure And Other Public Amenities Including Public Health Services
STP shall be provided
18Emergency Evacuation Services
Staircases shall be provided In Basement & all the Towers for fire/ emergency exit as per norms.
19Other Miscellaneous Work
retail shops shall be sold .
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

3 permits

An approval and the date it runs to - not proof the work matching it was done.

3 sanctioning permits are on record with UPRERA, the latest valid to 23 Sept 2020. 2 of them carry a revalidation, the latest valid to 23 Sept 2020.

Sanctioned by Moradabad Development Authority · 9,530 sqm of land · an approved plan of 4 blocks and 298 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endRevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossaryDocuments filed
BF/MH/UC/4L7/13-1425 Jan 201423 Sept 202023 Sept 202331 Mar 2020—
426/MDA/RVO25 Jan 201424 Jan 201923 Sept 202331 Mar 202025 Jan 2014
valid to 23 Sept 2020
426/MDA/RVO25 Jan 201424 Jan 201923 Sept 202331 Mar 202025 Jan 2014
valid to 23 Sept 2020
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 2 completion extensions for this project, the latest running to 30 Sept 2020.

#Granted fromExtended uptoNote
131 Mar 201931 Mar 2020—
231 Mar 202030 Sept 2020Six months extension in view of force majeure caused by covid-19 pandemic

Land & documents

27 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
MDA GROUP HOUSING PLOT NO - 1 SECTOR 13 NAYA MORAD9530 SQ/M—
MDA GROUP HOUSING PLOT NO - 1 SECTOR 13 NAYA MORAD9530Plot
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

1 registry or lease-deed filing is on this project’s record with UPRERA, dated 28 Mar 2012.

Registry no.DateTypeArea
2682/201228 Mar 2012self—
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · 2682
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
not reported—
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
not reported—
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Electricity supply plan
How the project proposed to supply power, as filed at registration.
not reported—
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New25 Jul 2018 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New25 Jul 2018 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New25 Jul 2018 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New25 Jul 2018 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New30 Jul 2018 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New30 Jul 2018 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New30 Jul 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old23 Feb 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old23 Feb 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old23 Feb 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old23 Feb 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old23 Feb 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old23 Feb 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old23 Feb 2018 ↗
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
Old23 Feb 2018 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
Old23 Feb 2018 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
Old23 Feb 2018 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
Old23 Feb 2018 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
Old23 Feb 2018 ↗

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameS.L Group and Associates
RolePromoter · current
RERA IDUPRERAPRM12999
PANABFFS4803F
CIN / TANLKNS12481A
Registered addressB-49 MASAROVAR COLONY DELHI ROAD MORADABAD
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Moradabad

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
ESCROWBankORIENTAL BANK OF COMMERCEBranchBUDH BAZAR MORADABADA/C no.IFSCORBC0100279
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

2 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No quarterly progress report is published for this project.Ask the promoter for the latest quarterly report filed and the construction percentage certified in it.
  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about GREEN ORCHID

Is GREEN ORCHID RERA registered?

Yes. GREEN ORCHID is registered with UPRERA under registration number UPRERAPRJ6472, registered on 31 Jul 2017. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for GREEN ORCHID?

The completion date filed with UPRERA is 30 Sept 2020. No completion certificate is on record yet.

Who is the builder of GREEN ORCHID?

S.L Group and Associates is the promoter entity that filed GREEN ORCHID with UPRERA (promoter RERA ID UPRERAPRM12999). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Why does GREEN ORCHID show "default on QPR"?

UPRERA flags this project as in default on quarterly progress reporting - the promoter has not filed one or more mandatory quarterly progress reports. The flag is the authority's, not Estanzo's.

Has UPRERA granted GREEN ORCHID more time to complete?

UPRERA's record carries 2 completion extensions for GREEN ORCHID, the latest running to 30 Sept 2020. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does GREEN ORCHID have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is GREEN ORCHID located?

GREEN ORCHID is registered in Moradabad, as filed with UPRERA.

What configurations are available in GREEN ORCHID?

The unit plan filed with UPRERA lists 2 BHK, 4 BHK, 3 BHK and SHOP. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in GREEN ORCHID?

The approved unit plan filed with UPRERA runs from 13 to 260 m² of carpet area (about 141 to 2,797 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in GREEN ORCHID?

The approved unit plan describes 4 blocks and 298 units of which 292 are homes and 6 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is GREEN ORCHID?

About 127 units per acre: 298 planned units across 2.35 acres (9,530 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗