Green Park is a RERA-registered residential project by Laxmi Associates in Uttar Pradesh (RERA ID UPRERAPRJ343018). Registered with a completion deadline of 31 Jul 2025.
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ343018 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Baghpat-baraut-khekra development Authority |
| Proposed start | 2 Aug 2021 |
| Project duration | 48 months |
| Address | Baraut |
| Tehsil | Baraut |
| Applicant type | Partnership Firm |
| Applicant address | Registered Address M-78,Jagatram Park, Laxmi Nagar,Delhi-110092 Corporate Office Address M-78,Jagatram Park, Laxmi Nagar,Delhi-110092 Site Address Khasra No. 112, Ami Nagar Sarai Road, Gurana, Baraut, Dist- Bhagpat , U.P.,PIN 250611 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
25/13/BBKDA/Adhi./Anu./2021-22
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
- to
Extension granted
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 8 Oct 2021 |
| Original completion | 1 Aug 2024 |
| Revised completion | 31 Jul 2025 |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹1,71,000 |
| Sanctioning authority | Baghpat-baraut-khekra development Authority |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots Plot shall be demarcated by stone Signage giving the plots No / Block. |
| 2 | Boundary Wall Gated Community with Brick Wall to be constructed as per the specification of the project. |
| 3 | Road Work Soil Filled and Compressed WBM Plus with RCC on it. |
| 4 | Footpaths Brick paving and interlock tile footpath. |
| 5 | Water Supply Including Drinking Water Facilities Water facilities with Over Head Tank and Municipal Water. |
| 6 | Sewer System STP Provided. |
| 7 | Drain Open Drain with brick and CC Work. |
| 8 | Parks There are Seven Parks with Grass and plants in the Project. |
| 9 | Tree Planting Along the Roads and in the Park. |
| 10 | Design For Electric Supply Including Street Lighting Provision of Street light and Transformer with No Power Backup. |
| 11 | Community Buildings The Community Building are not to be provided. |
| 12 | Treatment and Disposal System of Sewage and Sullage water As per Specification provided in the Sanctioned Layout Plans. |
| 13 | Solid Waste Management And Disposal System AS per Specification provided in the Sanctioned Layout Plans. |
| 14 | Water Conservation System Provision of Rain Water Harvesting System only. |
| 15 | Energy Management System Including Use of Renewable Energy No Provision has been made for any renewable Energy Equipment as the size of project |
| 16 | Fire Protection And Fire Safety System As per Specification provided in the Sanctioned Layout Plans. |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services No Provision. |
| 18 | Emergency Evacuation Services it is plotted Development hence the Emergency Evacuation system is not to be provided. |
| 19 | Other Miscellaneous Work No Provision. |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 1 Aug 2026.
Sanctioned by Baghpat-baraut-khekra development Authority · 33,120 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| 25/13/BBKDA/Adhi./Anu./2021-22 | 2 Aug 2021 | 1 Aug 2026 | 1 Aug 2028 | 1 Aug 2024 |
| Document | File |
|---|---|
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
UPRERA’s record carries 1 completion extension for this project, running to 31 Jul 2025.
| # | Granted from | Extended upto | Note |
|---|---|---|---|
| 1 | 1 Aug 2024 | 31 Jul 2025 | — |
Land & documents
23 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 112 | 33120 | Khasra |
| Khatauni extract · 1423-1428 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Allotment letter from the authority · Affidavit regarding Point No.-8 of Objection Letter dated - 09.09.2021 The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Allotment letter from the authority · Partnership Deed Point No. 2 of Objection Letter dated 09.09.2021 The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Allotment letter from the authority · Amended Partnership Deed Point No. 2 of Objection Letter dated 09.09.2021 The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Registry document · 135 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 135 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Allotment letter from the authority · Reply of Objection Letter dated 09.09.2021 The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Allotment letter from the authority · Reply of Objection Letter dated 09.09.2021 with Annexure Part I The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Allotment letter from the authority · Reply of Objection Letter dated 09.09.2021 with Annexure Part II The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | not reported | — |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | not reported | — |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | not reported | — |
| Water supply plan How the project proposed to supply water, as filed at registration. | not reported | — |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | not reported | — |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | not reported | — |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | not reported | — |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | not reported | — |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 26 Aug 2021 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 21 Sept 2021 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 26 Aug 2021 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 21 Sept 2021 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 21 Sept 2021 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 21 Sept 2021 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 21 Sept 2021 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 21 Sept 2021 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 21 Sept 2021 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 21 Sept 2021 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 21 Sept 2021 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 21 Sept 2021 ↗ |
Quarterly progress reports
17 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
17 quarterly progress reports are on file with UPRERA, covering 2021-Q2 to 2025-Q2.
| Quarter | Construction | Certificates |
|---|---|---|
| 2021-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q2 | 52% | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | Laxmi Associates |
| Role | Promoter · current |
| RERA ID | UPRERAPRM148207 |
| PAN | AAEFL2481N |
| CIN / TAN | DELL10317G |
| Registered address | Registered Address M-78,Jagatram Park, Laxmi Nagar,Delhi-110092 Corporate Office Address M-78,Jagatram Park, Laxmi Nagar,Delhi-110092 Site Address Khasra No. 112, Ami Nagar Sarai Road, Gurana, Baraut, Dist- Bhagpat , U.P.,PIN 250611 |
| RERA contact | |
| Registered since | 2021 |
Nearby projects
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | Laxmi Associates Collection Account for Green ParkBankYes Bank LimitedBranchBaghpat BranchBranch addressGround Floor, Premises bearing No. 116, Ward No. 16, Delhi Road, Baghpat, U.P., PIN- 250611Branch districtBagpatA/C no.IFSCYESB0000108 |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | Laxmi Associates Separate Bank Account for Green ParkBankYes Bank LimitedBranchBaghpat BranchBranch addressGround Floor, Premises bearing no 116, Ward No. 16, Delhi Road, Baghpat, U.P., PIN- 250611Branch districtBagpatA/C no.IFSCYESB0000108 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | Laxmi Associates Rera Transaction Account for Green ParkBankYes Bank LimitedBranchBaghpat BranchBranch addressGround Floor, Premises bearing No. 116, Ward No. 16, Delhi Road, Baghpat, U.P., PIN- 250611Branch districtBagpatA/C no.IFSCYESB0000108 |
What has changed on this record
nothing recorded yet
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.What to verify and what to ask
2 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about Green Park
Is Green Park RERA registered?
Yes. Green Park is registered with UPRERA under registration number UPRERAPRJ343018, registered on 8 Oct 2021. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for Green Park?
The completion date filed with UPRERA is 31 Jul 2025. No completion certificate is on record yet.
Who is the builder of Green Park?
Laxmi Associates is the promoter entity that filed Green Park with UPRERA (promoter RERA ID UPRERAPRM148207). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Has UPRERA granted Green Park more time to complete?
UPRERA's record carries 1 completion extension for Green Park, the latest running to 31 Jul 2025. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.
Does Green Park have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗