HIGH WAY CITY-8 is a RERA-registered residential project by ABV BUILDTECH LLP in Uttar Pradesh (RERA ID UPRERAPRJ298472). Registered with a completion deadline of 7 Jan 2025.
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ298472 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Baghpat-baraut-khekra development Authority |
| Proposed start | 8 Oct 2019 |
| Project duration | 63 months |
| Address | Baraut |
| Tehsil | Baraut |
| Applicant type | Partnership Firm |
| Applicant address | 20/168, ARJUN PURAM,BARAUT, BAGHPAT-250611 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
34/15
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
- to
Extension granted
“Six months extension in view of force majeure caused by covid-19 pandemic”
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 30 Nov 2019 |
| Original completion | 8 Jul 2024 |
| Revised completion | 7 Jan 2025 |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹1,40,500 |
| Sanctioning authority | Baghpat-baraut-khekra development Authority |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots DONE |
| 2 | Boundary Wall 1.8-3 M Height Boundary Wall Designed |
| 3 | Road Work Bituminous / pavers tiles as per designed by architects |
| 4 | Footpaths Suitable Pathway designed for roads in concrete /pavers/tiles /equivalent finished |
| 5 | Water Supply Including Drinking Water Facilities Borewell Water for Drinking and Domestic Use |
| 6 | Sewer System Centralized Sewer System Shall be provided |
| 7 | Drain Centralized Drain System Shall be provided |
| 8 | Parks Provision of Several green parks with tree |
| 9 | Tree Planting Provision of complete tree plantation designed by landscape architects |
| 10 | Design For Electric Supply Including Street Lighting Provision of centralized electrical supply system designed by architects |
| 11 | Community Buildings NA |
| 12 | Treatment and Disposal System of Sewage and Sullage water Proper garbage collection area designed to be disposed of as per town area system |
| 13 | Solid Waste Management And Disposal System NOT APPLICABLE |
| 14 | Water Conservation System A completer system of rainwater harvesting through long open water bodies or rain water |
| 15 | Energy Management System Including Use of Renewable Energy NA |
| 16 | Fire Protection And Fire Safety System A proper fire protection and safety system designed as per norms and requirement |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services NOT APPLICABLE |
| 18 | Emergency Evacuation Services NOT APPLICABLE |
| 19 | Other Miscellaneous Work NA |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 20 Jul 2024.
Sanctioned by Baghpat-baraut-khekra development Authority · 27,056 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| 34/15 | 20 Jul 2019 | 20 Jul 2024 | 20 Jul 2027 | 8 Jul 2024 |
| Document | File |
|---|---|
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
UPRERA’s record carries 1 completion extension for this project, running to 7 Jan 2025.
| # | Granted from | Extended upto | Note |
|---|---|---|---|
| 1 | 8 Jul 2024 | 7 Jan 2025 | Six months extension in view of force majeure caused by covid-19 pandemic |
Land & documents
25 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 854 | 7750 | Khasra |
| 852 | 8432 | Khasra |
| 865 | 10874 | Khasra |
| Khatauni extract · 1425-1430 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1425-1430 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1425-1430 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Registry document · 6644 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 8098 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 9551 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 1742 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 1742 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 15064 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 6322 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 5717 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 5717 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 13364 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 13411 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 4989 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 8098 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 8098 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 168 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 3326 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | not reported | — |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | not reported | — |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | not reported | — |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | not reported | — |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | not reported | — |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | not reported | — |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | not reported | — |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 7 Nov 2019 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 25 Oct 2019 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 25 Oct 2019 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 31 Oct 2019 ↗ |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | New | 17 Oct 2019 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 25 Oct 2019 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 25 Oct 2019 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 25 Oct 2019 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 27 Nov 2019 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 17 Oct 2019 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 17 Oct 2019 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 25 Oct 2019 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 12 Nov 2019 ↗ |
Quarterly progress reports
20 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
20 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2024-Q4.
| Quarter | Construction | Certificates |
|---|---|---|
| 2020-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | ABV BUILDTECH LLP |
| Role | Promoter · current |
| RERA ID | UPRERAPRM100300 |
| PAN | ABFFA2494L |
| CIN / TAN | MRTA12439A |
| Registered address | 20/168, ARJUN PURAM,BARAUT, BAGHPAT-250611 |
| RERA contact | |
| Registered since | 2019 |
Nearby projects
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| Bank account as filed | ABV BUILDTECH LLPBankUNION BANK OF INDIABranchBARAUTA/C no.IFSCUBIN0537969 |
What has changed on this record
nothing recorded yet
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.What to verify and what to ask
2 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about HIGH WAY CITY-8
Is HIGH WAY CITY-8 RERA registered?
Yes. HIGH WAY CITY-8 is registered with UPRERA under registration number UPRERAPRJ298472, registered on 30 Nov 2019. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for HIGH WAY CITY-8?
The completion date filed with UPRERA is 7 Jan 2025. No completion certificate is on record yet.
Who is the builder of HIGH WAY CITY-8?
ABV BUILDTECH LLP is the promoter entity that filed HIGH WAY CITY-8 with UPRERA (promoter RERA ID UPRERAPRM100300). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Has UPRERA granted HIGH WAY CITY-8 more time to complete?
UPRERA's record carries 1 completion extension for HIGH WAY CITY-8, the latest running to 7 Jan 2025. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.
Does HIGH WAY CITY-8 have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗