Greenarch Phase-1

UPRERARegistered

Greenarch Phase-1 is a RERA-registered residential project by NEW WAY HOMES PRIVATE LIMITED in Gautam Budh Nagar (RERA ID UPRERAPRJ7198). Registered with a completion deadline of 28 Feb 2018.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ7198
Project categoryResidential
Registration typeOngoing
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryGreater Noida Authority
Proposed start4 Apr 2014
Original start4 Apr 2014
Project duration47 months
AddressGautam Buddha Nagar, Gautam Budh Nagar
TehsilGautam Buddha Nagar
Applicant typeCompany
Applicant addressGF-11, 1ST.FLOOR, PRAKSHDEEP BUILDING, 7 TOLSTOY MARG, CONNAUGHT PLACE, NEW DELHI-110001
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  2. Registered with RERA

  3. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  4. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

  5. Completion certificate filed

  6. Completion certificate filed

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered31 Jul 2017
Original completion28 Feb 2018
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary1 Jun 2019
Registration fee₹1,35,000
Sanctioning authorityGreater Noida Authority

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Deepak Mehta & Associates
License COA/87/10840
Plot No-16,Abhishek Plaza,L.S.C,Mayur Vihar,Phase-2,Delhi-91
Engineer
V.D Sharma
B-24,Sector-67,Noida,gautam Budh Nagar
Contractor
HIM SHIKHAR CONSTRUCTIONS PVT
G-4, PLOT NO 26,BALAJI PLAZA,, KP BLOCK COMMUNITY CENTER,, PITAM PURA NEW DELHI,
Sr.Development work declared to RERA
1Demarcation of Plots
BY BOUNDARY WALL
2Boundary Wall
RCC WALL
3Road Work
TRIMIX CONC
4Footpaths
TRIMIX CONC
5Water Supply Including Drinking Water Facilities
CPVC PINE
6Sewer System
CPVC PIPE
7Drain
CPVC PIPE
8Parks
YES
9Tree Planting
YES
10Design For Electric Supply Including Street Lighting
YES
11Community Buildings
completed
12Treatment and Disposal System of Sewage and Sullage water
STP
13Solid Waste Management And Disposal System
Solid waste management machine installed and working start.
14Water Conservation System
Rain harvesting system installed and same is in working since beginning
15Energy Management System Including Use of Renewable Energy
YES
16Fire Protection And Fire Safety System
YES
17Social Infrastructure And Other Public Amenities Including Public Health Services
YES
18Emergency Evacuation Services
YES
19Other Miscellaneous Work
AS PER BUILDING PLAN
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

0 permits

An approval and the date it runs to - not proof the work matching it was done.

Sanctioned by Greater Noida Authority · 26,000 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.

Plans and approvals filed with RERA
DocumentFile
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗

Land & documents

5 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
11—
Document checklist
DocumentStatusUploaded
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New17 Oct 2020 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New17 Oct 2020 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New17 Oct 2020 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
Old31 Jul 2017 ↗

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking waterYes
Fire safety (as filed with RERA)Yes
Renewable energyYes
Other facilitiesAs per site

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Quarterly progress reports

1 filed report

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

1 quarterly progress report is on file with UPRERA, for 2020-Q2.

QuarterConstructionCertificates
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameNEW WAY HOMES PRIVATE LIMITED
RolePromoter · current
RERA IDUPRERAPRM10776
PANAADCN5663N
CIN / TANU70200DL2011PTC214428
Name of chairmanAJAY KUMAR
Registered addressGF-11, 1ST.FLOOR, PRAKSHDEEP BUILDING, 7 TOLSTOY MARG, CONNAUGHT PLACE, NEW DELHI-110001
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Gautam Budh Nagar

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
CURRENT ACCOUNT ESCROW & TRABankYES BANK LTD.BranchGURGOANA/C no.IFSCYESB12340172
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

3 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No registry, lease deed or land-title document is published for this project.Ask to see the registered deed for the plot and how the promoter holds the land - freehold, leased from the development authority, or under an agreement with a landowner.
  • No sanctioning permit is published for this project.Ask which authority sanctioned the plans, for the permit number, and for the date it is valid to.
  • No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.

Common questions about Greenarch Phase-1

Is Greenarch Phase-1 RERA registered?

Yes. Greenarch Phase-1 is registered with UPRERA under registration number UPRERAPRJ7198, registered on 31 Jul 2017. Estanzo reproduces that filing; it does not verify the work behind it.

Has Greenarch Phase-1 been completed?

UPRERA still lists Greenarch Phase-1 as Registered, so it is not shown as completed here. A completion certificate dated 1 Jun 2019 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.

Who is the builder of Greenarch Phase-1?

NEW WAY HOMES PRIVATE LIMITED is the promoter entity that filed Greenarch Phase-1 with UPRERA (promoter RERA ID UPRERAPRM10776). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does Greenarch Phase-1 have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Greenarch Phase-1 located?

Greenarch Phase-1 is registered in Gautam Budh Nagar, as filed with UPRERA.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗