Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ15574
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryGreater Noida Authority
Proposed start1 May 2018
Project duration90 months
AddressGautam Buddha Nagar, Gautam Budh Nagar
TehsilGautam Buddha Nagar
Applicant typeCompany
Applicant address711/92, Deepali, Nehru Place, Delhi-110019
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    PLG/(BP)3574/2023

  2. Registered with RERA

  3. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  4. Completion certificate filed

  5. Completion certificate filed

  6. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  7. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  8. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered29 Mar 2018
Original completion30 Apr 2025
Revised completion29 Oct 2025
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary2 May 2023
Registration fee₹1,79,000
Sanctioning authorityGreater Noida Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors1,280 · 4 · 29 (units from plan)
Homes · commercial units1,239 · 41 (shops and offices filed in the same plan)
  • 3 BHK823 64%
  • 2 BHK416 33%
  • SHOP41 3%
ConfigurationUnitsCarpet area
3 BHK82383-112
2 BHK41663-67
SHOP414-37
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
COMMERCIAL · OTHER, SHOP4414-37
TOWER-1,2,3,4,5,6 & 7 · OTHER, 3 BHK2935894
TOWER-11 & 12 · OTHER, 2 BHK2941663-67
TOWER-8,9 & 10 · 3 BHK, OTHER2946583-112
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
MANISH KUMAR GUPTA
License CA/2005/35549
ATS TOWER ,PLOT NO-16,SECTOR-135 NOIDA (U.P)
Engineer
KAMAL SABHARWAL
H-25,2ND FLOOR (LEVEL-3),KAILASH COLONY MARKET ,NEW DELHI-110048
Sr.Development work declared to RERA
1Demarcation of Plots
YES
2Boundary Wall
YES
3Road Work
YES
4Footpaths
YES
5Water Supply Including Drinking Water Facilities
YES
6Sewer System
YES
7Drain
YES
8Parks
YES
9Tree Planting
YES
10Design For Electric Supply Including Street Lighting
YES
11Community Buildings
YES
12Treatment and Disposal System of Sewage and Sullage water
YES
13Solid Waste Management And Disposal System
YES
14Water Conservation System
YES
15Energy Management System Including Use of Renewable Energy
YES
16Fire Protection And Fire Safety System
YES
17Social Infrastructure And Other Public Amenities Including Public Health Services
NA
18Emergency Evacuation Services
YES
19Other Miscellaneous Work
NA
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

39 agents

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1360 REALTORS LLPUPRERAAGT10868
2AADHAR PROPMART PRIVATE LIMITEDUPRERAAGT10142
3ACUBE SOLUTIONSUPRERAAGT10220
4Addressofchoice Realty Pvt LtdUPRERAAGT14990
5ajay goswamiUPRERAAGT14382
6ANAROCK Property Consultants Private LimitedUPRERAAGT10265
7BULLMEN REALTY INDIA PRIVATE LIMITEDUPRERAAGT10138
8BUNIYAD REALTY LIMITED (Formerly BUNIYAD RETAIL INDIA PRIVATE LIMITED)UPRERAAGT11569
9EMPOWER REALTECH PRIVATE LIMITEDUPRERAAGT10623
10ETHEREAL HOMES PRIVATE LIMITEDUPRERAAGT15555
11FINDMYPROPERTY PRIVATE LIMITEDUPRERAAGT11867
12GATEWAY PROPMART PVT LTDUPRERAAGT10384
13HABBY GUPTAUPRERAAGT13918
14HONEY MONEY ASSOCIATES LIMITEDUPRERAAGT11535
15INVESTORS CLINIC INFRATECH PRIVATE LIMITEDUPRERAAGT10052
16JAI AMBEY CONSULTANTSUPRERAAGT11064
17MADHYAM ESTATE LINKERS PVT LTDUPRERAAGT10509
18Neeraj SaxenaUPRERAAGT10536
19PC MANTRA INFOSYSTEM PVT. LTD.UPRERAAGT10580
20PROPCASA CONSULTANCY PVT. LTD.UPRERAAGT10038
21Proprex Realty Private LimitedUPRERAAGT13343
22PROPSHOPUPRERAAGT10129
23PROPTIGER MARKETING SERVICES PRIVATE LIMITED(Formerly ELARA MARKETING SERVICES PRIVATE LIMITED)UPRERAAGT10032
24PROPZONE INFRATECHUPRERAAGT10285
25Rahul Kumar SinghUPRERAAGT12319
26REDMAPLE BUILDIKO PRIVATE LIMITEDUPRERAAGT14395
27RISHU KUMARUPRERAAGT14718
28Rohit BediUPRERAAGT12109
29ROHIT JAIN( ROHIT ASSOCIATES)UPRERAAGT12177
30Sachan Estate Pvt LtdUPRERAAGT10143
31SANG INFRATECH PVT. LTD.UPRERAAGT10024
32SMC Real Estate Advisors Private LimitedUPRERAAGT10113
33SQUARE YARDS CONSULTING PRIVATE LIMITEDUPRERAAGT10119
34star estateUPRERAAGT10202
35Sushil vyasUPRERAAGT13744
36TRUHOMES REALTYUPRERAAGT10997
37TRUSTNEST PROPERTY CONSULTANTS LLPUPRERAAGT15462
38VARUN KUMAR SHUKLAUPRERAAGT14388
39Walmond Realty Dart Pvt LtdUPRERAAGT10777
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 22 Mar 2023.

Sanctioned by Greater Noida Authority · 34,769 sqm of land · an approved plan of 4 blocks and 1280 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
PLG/(BP)3574/202323 Mar 201822 Mar 202322 Mar 202830 Apr 2025
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
no file published
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 1 completion extension for this project, running to 29 Oct 2025.

#Granted fromExtended uptoNote
130 Apr 202529 Oct 2025Six months extension in view of force majeure caused by covid-19 pandemic

Land & documents

27 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
00—
PLOT NO-GH-02A SECTOR-10- GREATER NOIDA34769Plot
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

2 registry or lease-deed filings are on this project’s record with UPRERA, the earliest dated 23 Nov 2012.

Registry no.DateTypeArea
79527 Apr 2015self—
2273223 Nov 2012self—
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Lease deed · 7952
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Lease deed · 22732
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
not reported—
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
not reported—
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
not reported—
Water supply plan
How the project proposed to supply water, as filed at registration.
not reported—
Electricity supply plan
How the project proposed to supply power, as filed at registration.
not reported—
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
not reported—
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
not reported—
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New6 Jul 2018 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New6 Jul 2018 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New6 Jul 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old28 Mar 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old28 Mar 2018 ↗
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
Old28 Mar 2018 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
Old28 Mar 2018 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
Old28 Mar 2018 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
Old28 Mar 2018 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
Old28 Mar 2018 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
Old28 Mar 2018 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
Old28 Mar 2018 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
Old28 Mar 2018 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
Old28 Mar 2018 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
Old29 Mar 2018 ↗

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking waterYES PROPOSED
Fire safety (as filed with RERA)YES PROPOSED
Health serviceYES PROPOSED
Renewable energyYES PROPOSED

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Quarterly progress reports

23 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

23 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2025-Q3.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
2024-Q4—CA ↗ · Arch ↗ · Eng ↗
2025-Q1—CA ↗ · Arch ↗ · Eng ↗
2025-Q2100%CA ↗ · Arch ↗ · Eng ↗
2025-Q3100%CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2025-Q3. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameSHRIDHARA INFRATECH PRIVATE LIMITED
RolePromoter · current
RERA IDUPRERAPRM40553
PANAARCS4679P
CIN / TANU45400DL2011PTC225814
Name of chairmanMr Getamber Anand
Registered address711/92, Deepali, Nehru Place, Delhi-110019
RERA contact
Registered since2018
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Gautam Budh Nagar

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
Shridhara Infratech Pvt Ltd Rera A/CBankYES BANKBranchYES BANK Ground Floor, Plot No B-I/68, Sec-50, NoidaA/C no.IFSCYESB0000085
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

1 movement

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)12 (Under Registration - 0 ) → 13 (Under Registration - 1 )
changed in Estanzo’s record
7 Sept 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 7 Sept 2026
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

Common questions about HAPPY TRAILS

Is HAPPY TRAILS RERA registered?

Yes. HAPPY TRAILS is registered with UPRERA under registration number UPRERAPRJ15574, registered on 29 Mar 2018. Estanzo reproduces that filing; it does not verify the work behind it.

Has HAPPY TRAILS been completed?

UPRERA still lists HAPPY TRAILS as Registered, so it is not shown as completed here. A completion certificate dated 2 May 2023 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.

Who is the builder of HAPPY TRAILS?

SHRIDHARA INFRATECH PRIVATE LIMITED is the promoter entity that filed HAPPY TRAILS with UPRERA (promoter RERA ID UPRERAPRM40553). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted HAPPY TRAILS more time to complete?

UPRERA's record carries 1 completion extension for HAPPY TRAILS, the latest running to 29 Oct 2025. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does HAPPY TRAILS have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is HAPPY TRAILS located?

HAPPY TRAILS is registered in Gautam Budh Nagar, as filed with UPRERA.

What configurations are available in HAPPY TRAILS?

The unit plan filed with UPRERA lists 3 BHK, OTHER, 2 BHK and SHOP. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in HAPPY TRAILS?

The approved unit plan filed with UPRERA runs from 4 to 112 m² of carpet area (about 43 to 1,210 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in HAPPY TRAILS?

The approved unit plan describes 4 blocks and 1,280 units of which 1,239 are homes and 41 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is HAPPY TRAILS?

About 149 units per acre: 1,280 planned units across 8.59 acres (34,769 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗