Godrej Majesty GH-01/B,C,D,E.J and K Sec 12 -G Noida

UPRERARegistered

Godrej Majesty GH-01/B,C,D,E.J and K Sec 12 -G Noida is a RERA-registered mixed project by Godrej Properties Limited in Sector 12, Greater Noida, Gautam Budh Nagar (RERA ID UPRERAPRJ250823). Registered with a completion deadline of 16 Feb 2030.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Construction progress

As filed in quarterly progress reports · % complete · latest filed Apr–Jun 2026
Quarters shown are calendar quarters. UP-RERA files them by financial year.
4.76%Q3'25
0.85%Q4'25
2%Q1'26
0.79%Q2'26

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ250823
Project categoryMixed
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryGreater Noida Authority
Proposed start31 Jul 2025
Project duration55 months
AddressGH-01/ B, C, D, E, J & K, Sector 12, Greater Noida, Dadri, Gautam Budh Nagar
TehsilDadri
Applicant typeCompany
Applicant addressGodrej One, 5th Floor, Pirojshanagar, Eastern Express Highway, Vikhroli (East), Mumbai – 400079
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    SM-10-DEC-2024-23309

  2. Registered with RERA

  3. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2025-26
Q1Q2Q3Q4
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered30 Apr 2025
Original completion16 Feb 2030
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹2,50,500
Sanctioning authorityGreater Noida Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors793 · 8 · 35 (units from plan)
Homes · commercial units777 · 16 (shops and offices filed in the same plan)
  • 3 BHK322 41%
  • OTHER302 38%
  • 4 BHK135 17%
  • 2 BHK18 2%
  • SHOP16 2%
ConfigurationUnitsCarpet area
OTHER302110-153
3 BHK32291-129
2 BHK1877-84
4 BHK135135
SHOP164-74
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
Commercial · SHOP1164-74
Tower-1 · OTHER, 3 BHK, 2 BHK3513577-125
Tower-2 · OTHER, 4 BHK, 2 BHK, 3 BHK3513477-135
Tower-3 · OTHER, 4 BHK, 2 BHK, 3 BHK3513377-135
Tower-4 · OTHER, 3 BHK, 2 BHK249077-125
Tower-5 · OTHER, 3 BHK, 2 BHK259584-153
Tower-6 · OTHER, 3 BHK, 2 BHK259584-153
Tower-7 · OTHER2595110-132
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Ar. Avanish Shrivastav
License CA/2016/27184
FF-37, Kadamba Complex, Gamma -1, Greater Noida
Engineer
Ashish Suresh Bhangle
Dr. Kelkar Design Pvt. Ltd ; 610 Keshava Bandra Kurla Complex, Bandra (East), Mumbai- 400051
Contractor
Umesh Kumar Kamboj
SS- A238, Sector 49, Sainik Colony, Faridabad
Sr.Development work declared to RERA
1Demarcation of Plots
N.A
2Boundary Wall
Elegant design integrated with security rails and patterns as per Approved Building Plan.
3Road Work
Peripheral loop of road connect to each tower with a dedicated drop off plaza for cars to access the respective towers as per Approved Building Plan.
4Footpaths
Network of footpaths connects the various parts in the landscape, towers and gardens as per Approved Building Plan.
5Water Supply Including Drinking Water Facilities
Greater Noida Authority shall provide water supply to the entire society further water will be treated and supplied at customer premise through piping and pumping and gravity system.
6Sewer System
Centralized STP to treat the sewerage and every tower has its own down comers connected to main sewerage line.
7Drain
Centralized STP to treat the sewerage and every tower has its own down comers connected to main sewerage line.
8Parks
As per Approved Building Plan.
9Tree Planting
As per Approved Building Plan.
10Design For Electric Supply Including Street Lighting
Single feeder shall be taken from NPCL (Noida Power Company Limited) and connected to central substation and entire project shall have street lighting
11Community Buildings
Community building as per Approved Building Plan.
12Treatment and Disposal System of Sewage and Sullage water
Central STP for entire project and all towers shall be connected to STP.
13Solid Waste Management And Disposal System
Project shall have waste segregation area and OWC for treatment of organic waste.
14Water Conservation System
Adequate no. of recharge pits made.
15Energy Management System Including Use of Renewable Energy
LED lights and timer control panels shall be used for efficient energy management.
16Fire Protection And Fire Safety System
Fire alarm system provided.
17Social Infrastructure And Other Public Amenities Including Public Health Services
As per Approved Building Plan.
18Emergency Evacuation Services
As per Approved Building Plan.
19Other Miscellaneous Work
As per Approved Building Plan.
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

43 agents

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1ABHISHEK PANDEYUPRERAAGT16755
2AJAY BHADOURIYAUPRERAAGT15100
3Amit KapoorUPRERAAGT22482
4Bajaj Capital Investment Centre LimitedUPRERAAGT11036
5BHR ConsultingsUPRERAAGT21880
6BLUECRUMBS INFRA PRIVATE LIMITEDUPRERAAGT16897
7BULLMEN REALTY INDIA PRIVATE LIMITEDUPRERAAGT10138
8CAPITALBOON CONSULTINGUPRERAAGT18663
9Cushman & Wakefield India Private LimitedUPRERAAGT11043
10eXp Global India Private LimitedUPRERAAGT19867
11FINDMYPROPERTY PRIVATE LIMITEDUPRERAAGT11867
12FIRSTDOOR REALTY LLPUPRERAAGT23971
13GATEWAY PROPMART PVT LTDUPRERAAGT10384
14HELIORISE REALTECH PRIVATE LIMITEDUPRERAAGT23423
15HIMANSHU AGARWALUPRERAAGT16908
16Homesfy Realty LimitedUPRERAAGT25373
17IA Wealth Private Limited(Formaly Investadvise Wealth Management Private Limited)UPRERAAGT10048
18Inframantra India Pvt LtdUPRERAAGT23476
19INVEST BLOOM ADVISORS PRIVATE LIMITEDUPRERAAGT23323
20INVEST MANGOUPRERAAGT12212
21INVESTOXPERT ADVISORS PVT LTDUPRERAAGT21108
22Jitendra singhUPRERAAGT18834
23Kailash SagarUPRERAAGT23604
24KUSUM MISHRAUPRERAAGT22036
25MORES TECHNO PRIVATE LIMITEDUPRERAAGT25307
26PROPERTYFOLKS ADVISORY PRIVATE LIMITEDUPRERAAGT20615
27Propertypistol Realty Pvt LtdUPRERAAGT12730
28PROPSELLER INDIA PRIVATE LIMITEDUPRERAAGT22343
29PROPSHOPUPRERAAGT10129
30PROPSOLUTIONS4U PRIVATE LIMITEDUPRERAAGT23830
31Rajesh KumarUPRERAAGT22403
32RAJIV KUMARUPRERAAGT22067
33Shrikant BasareUPRERAAGT19484
34SOMIT SHARMAUPRERAAGT16099
35SQUARE YARDS CONSULTING PRIVATE LIMITEDUPRERAAGT10119
36star estateUPRERAAGT10202
37STEPYARD INFRATECH PRIVATE LIMITEDUPRERAAGT16057
38Sunil KumarUPRERAAGT22710
39Sunny SachdevaUPRERAAGT24202
40Trisol RED Infraventures Pvt LtdUPRERAAGT11579
41Vipul SinghUPRERAAGT22139
42Walmond Realty Dart Pvt LtdUPRERAAGT10777
43WEALTH CLINIC PRIVATE LIMITEDUPRERAAGT10521
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 15 Feb 2030.

Sanctioned by Greater Noida Authority · 32,350 sqm of land · an approved plan of 8 blocks and 793 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
SM-10-DEC-2024-2330916 Feb 202515 Feb 203014 Feb 203516 Feb 2030
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

23 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
GH-01/B,C,D,E,J and K32350Plot
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Lease deed · 59003
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Allotment letter from the authority · GNIDA/BRS-01/2023-24/1265
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Document checklist
DocumentStatusUploaded
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
not reported—
Water supply plan
How the project proposed to supply water, as filed at registration.
not reported—
Electricity supply plan
How the project proposed to supply power, as filed at registration.
not reported—
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
not reported—
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New20 Feb 2025 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New20 Feb 2025 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New20 Feb 2025 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New16 Apr 2025 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New17 Feb 2025 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New17 Feb 2025 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New17 Feb 2025 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New21 Feb 2025 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New20 Feb 2025 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New20 Mar 2025 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New20 Mar 2025 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New20 Mar 2025 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New17 Apr 2025 ↗
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
New20 Feb 2025 ↗

Quarterly progress reports

4 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

4 quarterly progress reports are on file with UPRERA, covering 2025-Q2 to 2026-Q1.

QuarterConstructionCertificates
2025-Q24.76%CA ↗ · Arch ↗ · Eng ↗
2025-Q30.85%CA ↗ · Arch ↗ · Eng ↗
2025-Q42%CA ↗ · Arch ↗ · Eng ↗
2026-Q10.79%CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameGodrej Properties Limited
RolePromoter · current
RERA IDUPRERAPRM237988
PANAAACG3995M
CIN / TANMUMG08095D
Name of chairmanPirojsha Adi Godrej
Registered addressGodrej One, 5th Floor, Pirojshanagar, Eastern Express Highway, Vikhroli (East), Mumbai – 400079
RERA contact
Registered since2023
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Gautam Budh Nagar

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
GPL COLL GODMAJESTY- GH- 01/BCDEJK SEC12BankHDFC BankBranchAnsals Acrade, Sector 18, NoidaBranch addressAnsals Fortune Acrade, k-Block, Sector 18, NoidaBranch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCHDFC0000088Branch emailripudaman.singh@hdfcbank.com
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
GPL SEP GODMAJESTY -GH- 01/BCDEJK SEC12BankHDFC BankBranchAnsals Acrade, Sector 18, NoidaBranch addressAnsals Fortune Acrade, K Block, Sector 18, NoidaBranch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCHDFC0000088
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
GPL TRN GODMAJESTY -GH-01/BCDEJK SEC12BankHDFC BankBranchAnsals Acrade, Sector 18, NoidaBranch addressAnsals Fortune Acrade, K- Block, Sector 18, NoidaBranch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCHDFC0000088
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about Godrej Majesty GH-01/B,C,D,E.J and K Sec 12 -G Noida

Is Godrej Majesty GH-01/B,C,D,E.J and K Sec 12 -G Noida RERA registered?

Yes. Godrej Majesty GH-01/B,C,D,E.J and K Sec 12 -G Noida is registered with UPRERA under registration number UPRERAPRJ250823, registered on 30 Apr 2025. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for Godrej Majesty GH-01/B,C,D,E.J and K Sec 12 -G Noida?

The completion date filed with UPRERA is 16 Feb 2030. No completion certificate is on record yet.

Who is the builder of Godrej Majesty GH-01/B,C,D,E.J and K Sec 12 -G Noida?

Godrej Properties Limited is the promoter entity that filed Godrej Majesty GH-01/B,C,D,E.J and K Sec 12 -G Noida with UPRERA (promoter RERA ID UPRERAPRM237988). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does Godrej Majesty GH-01/B,C,D,E.J and K Sec 12 -G Noida have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Godrej Majesty GH-01/B,C,D,E.J and K Sec 12 -G Noida located?

Godrej Majesty GH-01/B,C,D,E.J and K Sec 12 -G Noida is registered in Sector 12, Greater Noida, Gautam Budh Nagar, as filed with UPRERA.

What configurations are available in Godrej Majesty GH-01/B,C,D,E.J and K Sec 12 -G Noida?

The unit plan filed with UPRERA lists OTHER, 3 BHK, 2 BHK, 4 BHK and SHOP. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in Godrej Majesty GH-01/B,C,D,E.J and K Sec 12 -G Noida?

The approved unit plan filed with UPRERA runs from 4 to 153 m² of carpet area (about 43 to 1,645 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in Godrej Majesty GH-01/B,C,D,E.J and K Sec 12 -G Noida?

The approved unit plan describes 8 blocks and 793 units of which 777 are homes and 16 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is Godrej Majesty GH-01/B,C,D,E.J and K Sec 12 -G Noida?

About 99 units per acre: 793 planned units across 7.99 acres (32,350 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗