INTEGRITY (Phase - 2: Tower N & O)

UPRERANCLT

INTEGRITY (Phase - 2: Tower N & O) is a RERA-registered residential project by AJNARA INDIA LIMITED in Ghaziabad (RERA ID UPRERAPRJ5611). RERA status: NCLT (since 20 Sept 2022).

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: NCLT.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ5611
Project categoryResidential
Registration typeOngoing
RERA statusNCLTNCLTThe tribunal that hears company insolvency cases. UP-RERA lists projects whose promoter is before it.Read the full entry in the glossary
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryGhaziabad Development Authority
Proposed start22 Jul 2015
Original start20 Jul 2013
Project duration80 months
AddressGhaziabad, Ghaziabad
TehsilGhaziabad
Applicant typeCompany
Applicant address1. B-189, YOJNA VIHAR, DELHI-92 2. B-189, YOJNA VIHAR, DELHI-92 3. B-189, YOJNA VIHAR, DELHI-92 4
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  2. Building permit sanctioned

    141/GH/Zone-1/14-15

  3. Registered with RERA

  4. to

    Extension granted

  5. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  6. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  7. to

    Extension granted

  8. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

  9. NCLT order

Published without a date
UPRERA lists this project as NCLT. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered31 Jul 2017
Original completion31 Dec 2019
Revised completion19 Mar 2022
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹33,000
Sanctioning authorityGhaziabad Development Authority
NCLT order date20 Sept 2022

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors356 · 2 · 24 (units from plan)
  • 2 BHK262 74%
  • 3 BHK94 26%
ConfigurationUnitsCarpet area
2 BHK26252-61
3 BHK9470-70
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
TOWER N · 2 BHK, 3 BHK2416552-70
TOWER O · 2 BHK, 3 BHK2419154-70
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
AR. VISHAL MITTAL
License CA/98/23185
SPACE DESIGNERS INTERNATION, B-34, SECTOR-67, NOIDA
Engineer
SDAC ENGINEERS (INDIA)
Plot No. 62, Sector - 5, Vaishali, Ghaziabad
Contractor
Inhouse
Inhouse
Sr.Development work declared to RERA
1Demarcation of Plots
Not applicable
2Boundary Wall
2100 mm high, along entire periphery.(Column & beam RCC and Pannel Brick works)
3Road Work
RCC Trimix
4Footpaths
UNI COBLE STONE TILE
5Water Supply Including Drinking Water Facilities
OHT OF DOMESTIC TANK ARE AS FOLLOWINGS :Tower N - 30 KL Tower O - NA
6Sewer System
Underground system using RCC HUME Sewer pipes.
7Drain
Underground system using RCC HUME pipes.
8Parks
Parks having total area of 3358.68 sq. m. shall be provided.
9Tree Planting
112 Nos. trees are to be planted out of that 50% will be evergreen tree.
10Design For Electric Supply Including Street Lighting
Two Electricity Transformers of 2000 KVA capacity each shall be used along with necessary switch-gear for distributing electricity at LT voltage .
11Community Buildings
Built up area of community buildings shall be 771.40 sq. m.
12Treatment and Disposal System of Sewage and Sullage water
STP of capacity 500 KLD shall be provided. Treated water shall be used for flushing, irrigation, pathways cleaning and excess sewage shall be discharged in the municipal sewer.
13Solid Waste Management And Disposal System
Manual collection and organic waste converter shall be provided.
14Water Conservation System
4 No. sets of RECHARG & DESILITING CHAMBER shall be provided.
15Energy Management System Including Use of Renewable Energy
Solar panels shall be provided on terrace for renewable energy. 30.92 kw solar backup has been proposed. Single point metering will be there for energy purchased from the grid/ power supply company.
16Fire Protection And Fire Safety System
Fire tender path shall be provided as per NBC. Fire fighting systems along with pumps and UGT of Fire tank capacity 500KL (common) and OHT of Fire tank capacity 10KL (each block) shall be provided as per NBC & NOC from fire depp.
17Social Infrastructure And Other Public Amenities Including Public Health Services
STP, organic waste converter shall be provided.
18Emergency Evacuation Services
Staircases shall be provided In Basement & all the Towers for fire/ emergency exit as per NBC.
19Other Miscellaneous Work
Not Applicable
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

7 agents

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1INVESTORS CLINIC INFRATECH PRIVATE LIMITEDUPRERAAGT10052
2MuditUPRERAAGT12276
3PC MANTRA INFOSYSTEM PVT. LTD.UPRERAAGT10580
4PROP EMPEROSUPRERAAGT12572
5PROPSHOPUPRERAAGT10129
6VIKAS PROPERTIESUPRERAAGT14885
7WEALTH CLINIC PRIVATE LIMITEDUPRERAAGT10521
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 22 Jul 2020.

Sanctioned by Ghaziabad Development Authority · 5,559 sqm of land · an approved plan of 2 blocks and 356 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
141/GH/Zone-1/14-1522 Jul 201522 Jul 202022 Jul 202331 Dec 2019
Plans and approvals filed with RERA
DocumentFile
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 3 completion extensions for this project, the latest running to 19 Mar 2022.

#Granted fromExtended uptoNote
131 Dec 201921 Jul 2020—
221 Jul 202020 Jan 2021Six months extension in view of force majeure caused by covid-19 pandemic
320 Jan 202119 Mar 2022—

Land & documents

31 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
977, 978, 979, 981, 983, 1049, 105074966.18—
9771343Khasra
9782270Khasra
9792360Khasra
98150576Khasra
9835060Khasra
10494930Khasra
10509840Khasra
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

8 registry or lease-deed filings are on this project’s record with UPRERA, the earliest dated 3 Feb 2006.

Registry no.DateTypeArea
57888 May 2006self—
46520 Jan 2010self—
108015 Feb 2008self—
57788 May 2006self—
108515 Feb 2008self—
13113 Feb 2006self—
98513 Oct 2011self—
19510 Jan 2011self—
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · 465
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 5780
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 5788
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 57881311
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 1685
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 2834
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 195
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
not reported—
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
not reported—
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New17 Jul 2019 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New20 Jul 2018 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New20 Jul 2018 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New20 Jul 2018 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New20 Jul 2018 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New30 Jul 2018 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New30 Jul 2018 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New30 Jul 2018 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
Old30 Jul 2017 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
Old30 Jul 2017 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
Old30 Jul 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old30 Jul 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old30 Jul 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old30 Jul 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old30 Jul 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old30 Jul 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old30 Jul 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old30 Jul 2017 ↗

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking waterAS PER NBC/APPROVED PLAN
Fire safety (as filed with RERA)AS PER NBC/APPROVED PLAN
Renewable energyAS PER NBC/APPROVED PLAN

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Quarterly progress reports

8 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

8 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2021-Q4.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameAJNARA INDIA LIMITED
RolePromoter · current
RERA IDUPRERAPRM2641
PANAAACA4700C
CIN / TANU01111DL1991PLC046358
Name of chairman1. ASHOK KUMAR GUPTA2. VINOD KUMAR GUPTA3. PRA
Registered address1. B-189, YOJNA VIHAR, DELHI-92 2. B-189, YOJNA VIHAR, DELHI-92 3. B-189, YOJNA VIHAR, DELHI-92 4
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Ghaziabad

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
AJNARA INDIA LIMITEDBankICICI BankBranchNOIDA SEC-63A/C no.IFSCICIC0000816
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

Common questions about INTEGRITY (Phase - 2: Tower N & O)

Is INTEGRITY (Phase - 2: Tower N & O) RERA registered?

Yes. INTEGRITY (Phase - 2: Tower N & O) is registered with UPRERA under registration number UPRERAPRJ5611, registered on 31 Jul 2017. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for INTEGRITY (Phase - 2: Tower N & O)?

The completion date filed with UPRERA is 19 Mar 2022. No completion certificate is on record yet.

Who is the builder of INTEGRITY (Phase - 2: Tower N & O)?

AJNARA INDIA LIMITED is the promoter entity that filed INTEGRITY (Phase - 2: Tower N & O) with UPRERA (promoter RERA ID UPRERAPRM2641). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted INTEGRITY (Phase - 2: Tower N & O) more time to complete?

UPRERA's record carries 3 completion extensions for INTEGRITY (Phase - 2: Tower N & O), the latest running to 19 Mar 2022. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does INTEGRITY (Phase - 2: Tower N & O) have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is INTEGRITY (Phase - 2: Tower N & O) located?

INTEGRITY (Phase - 2: Tower N & O) is registered in Ghaziabad, as filed with UPRERA.

What configurations are available in INTEGRITY (Phase - 2: Tower N & O)?

The unit plan filed with UPRERA lists 2 BHK and 3 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in INTEGRITY (Phase - 2: Tower N & O)?

The approved unit plan filed with UPRERA runs from 52 to 70 m² of carpet area (about 558 to 759 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in INTEGRITY (Phase - 2: Tower N & O)?

The approved unit plan describes 2 blocks and 356 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is INTEGRITY (Phase - 2: Tower N & O)?

About 259 units per acre: 356 planned units across 1.37 acres (5,559 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗