OFFICER CITY-2 (PHASE-1)

UPRERARegistered

OFFICER CITY-2 (PHASE-1) is a RERA-registered residential project by MR Proview Realtech Private Limited in Ghaziabad (RERA ID UPRERAPRJ6085). Registered with a completion deadline of 25 Sept 2020.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ6085
Project categoryResidential
Registration typeOngoing
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryGhaziabad Development Authority
Proposed start21 Dec 2011
Original start21 Dec 2011
Project duration106 months
AddressModinagar, Ghaziabad
TehsilModinagar
Applicant typeCompany
Applicant addressTHE GREAT NORTHERN BAZAAR, NH-58, RAJ NAGAR EXTENSION, OPP AJNARA GRACE, GHAZIABAD, UTTAR PARDESH-201017
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  2. valid to

    Permit revalidated

    472/GMP/GH/12-13

  3. 2 building permits sanctioned

  4. Registered with RERA

  5. valid to

    Permit revalidated

    930/GMP/GH/18-19

  6. to

    Extension granted

  7. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  8. to

    Extension granted

  9. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  10. Completion certificate filed

  11. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

  12. 2 completion certificates filed

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered31 Jul 2017
Original completion28 Mar 2019
Revised completion25 Sept 2020
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary16 May 2020
Registration fee₹51,500
Sanctioning authorityGhaziabad Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors450 · 4 · 15 (units from plan)
  • 3 BHK240 53%
  • 2 BHK210 47%
ConfigurationUnitsCarpet area
3 BHK24065-75
2 BHK21046-59
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
A · 3 BHK1512075
B · 3 BHK1512065
C · 2 BHK1512059
D · 2 BHK159046
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
ANUJ AGARWAL
License CA/96/19503
A-244, KAUSHAMBI, GHAZIABAD
Engineer
SADANAND OJHA
503, Sachdeva Corporate Tower, Plot No-8, Sector-8, Rohini, Delhi
Contractor
N/A
N/A
Sr.Development work declared to RERA
1Demarcation of Plots
Private- Free Hold Land, Demarcation was already done before starting the project
2Boundary Wall
Boundary wall on RCC Tie, Beam on RCC Footing
3Road Work
Cements Concrete Internal Roads( CC Roads above to Layers of WBM
4Footpaths
Interlocking Tile on PCC on competed surface
5Water Supply Including Drinking Water Facilities
To be provided by Ghaziabad Development Authority and stores will be done underground water tanks
6Sewer System
Main Sewer line has been design as per norm and partially led in basement ceiling and will finally connect to sewer line/ STP
7Drain
Under ground Drain pipe with chamber
8Parks
Landscape and park has been designed as per authority guide lines
9Tree Planting
Tree panting has been design as per Authority Guide lines
10Design For Electric Supply Including Street Lighting
Design has been done as per Up electricity Board Guide lines
11Community Buildings
Club has been Design as per Authority Norms and facility like party hall gaming zone Entertainment area gym etc.
12Treatment and Disposal System of Sewage and Sullage water
Sewage will be treated for recycling ( if required ) other wise it will be connected two sewage line of Authority which is already connected to central functional STP of GDA For this locality.
13Solid Waste Management And Disposal System
Door to Door Collection and will be treated by waste disposal management.
14Water Conservation System
Recycling of Treated water and rain water harvesting system to be provided.
15Energy Management System Including Use of Renewable Energy
Solar panel will be provided as per norms as suitable Places
16Fire Protection And Fire Safety System
Fire System is being executed per the norm of department of fire.
17Social Infrastructure And Other Public Amenities Including Public Health Services
Nursary School in the premises
18Emergency Evacuation Services
Provision of exit sign and emergency light.
19Other Miscellaneous Work
N/A
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

2 permits

An approval and the date it runs to - not proof the work matching it was done.

2 sanctioning permits are on record with UPRERA, the latest valid to 29 Aug 2018. All 2 carry a revalidation, the latest valid to 29 Aug 2021.

Sanctioned by Ghaziabad Development Authority · 9,282 sqm of land · an approved plan of 4 blocks and 450 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endRevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossaryDocuments filed
472/GMP/GH/12-1330 Aug 201329 Mar 201828 Mar 201926 Mar 202022 Jun 2018
valid to 28 Mar 2019
as 930/GMP/GH/18-19
472/GMP/GH/12-1330 Aug 201329 Aug 201829 Aug 202126 Mar 202030 Aug 2013
valid to 29 Aug 2021
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
no file published
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 3 completion extensions for this project, the latest running to 25 Sept 2020.

#Granted fromExtended uptoNote
128 Mar 201927 Sept 2019—
227 Sept 201926 Mar 2020—
326 Mar 202025 Sept 2020Six months extension in view of force majeure caused by covid-19 pandemic

Land & documents

21 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
PART OF 1048 VILLAGE NOOR NAGAR, GHAZIABAD12542.00 SQ.MT.—
PART OF 1049 VILLAGE NOOR NAGAR, GHAZIABAD4930.00 SQ.MT.—
PART OF 1059 VILLAGE NOOR NAGAR, GHAZIABAD285.00 SQ.MT.—
PART OF 1060 VILLAGE NOOR NAGAR, GHAZIABAD1945.01 SQ.MT.—
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

4 registry or lease-deed filings are on this project’s record with UPRERA, the earliest dated 11 Jan 2011.

Registry no.DateTypeArea
248 (KH. NO.1048)11 Jan 2011self—
375 (KH.NO.1049)17 Jan 2011self—
8625 (KH. NO.1049)12 Jul 2012self—
8463 (KH. NO. 1060)9 Jul 2012self—
Document checklist
DocumentStatusUploaded
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New23 Apr 2019 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New31 Jul 2018 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New31 Jul 2018 ↗
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
New31 Jul 2018 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New3 Aug 2018 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New3 Aug 2018 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New3 Aug 2018 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New31 Jul 2018 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New31 Jul 2018 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New29 Jul 2018 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
Old30 Jul 2017 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
Old30 Jul 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old17 Oct 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old30 Jan 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old30 Jan 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old30 Jan 2018 ↗

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking waterGROUND WATER
Fire safety (as filed with RERA)AS PER FIRE NOC
Renewable energySOLAR POWER

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Quarterly progress reports

6 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

6 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2021-Q2.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—Eng ↗
2021-Q2—Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameMR Proview Realtech Private Limited
RolePromoter · current
RERA IDUPRERAPRM12058
PANAAGCM4612D
CIN / TANU70200DL2010PTC200718
Name of chairmanRajeev Kumar Arora
Registered addressTHE GREAT NORTHERN BAZAAR, NH-58, RAJ NAGAR EXTENSION, OPP AJNARA GRACE, GHAZIABAD, UTTAR PARDESH-201017
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Ghaziabad

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
MR PROVIEW REALTECH PVT. LTD.BankAXIS BANK LTD.BranchAXIS BANK LTD. GROUND FLOOR, OFFICE NO-1, TOWER A, PLOT NO-41 THE CORRENTHUM, SECTOR-62, NOIDAA/C no.IFSCUTIB0000723
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

1 movement

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)210 (Under Registration - 1 ) → 210 (Under Registration - 0 )
changed in Estanzo’s record
10 Aug 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 10 Aug 2026
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

Common questions about OFFICER CITY-2 (PHASE-1)

Is OFFICER CITY-2 (PHASE-1) RERA registered?

Yes. OFFICER CITY-2 (PHASE-1) is registered with UPRERA under registration number UPRERAPRJ6085, registered on 31 Jul 2017. Estanzo reproduces that filing; it does not verify the work behind it.

Has OFFICER CITY-2 (PHASE-1) been completed?

UPRERA still lists OFFICER CITY-2 (PHASE-1) as Registered, so it is not shown as completed here. A completion certificate dated 16 May 2020 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.

Who is the builder of OFFICER CITY-2 (PHASE-1)?

MR Proview Realtech Private Limited is the promoter entity that filed OFFICER CITY-2 (PHASE-1) with UPRERA (promoter RERA ID UPRERAPRM12058). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted OFFICER CITY-2 (PHASE-1) more time to complete?

UPRERA's record carries 3 completion extensions for OFFICER CITY-2 (PHASE-1), the latest running to 25 Sept 2020. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does OFFICER CITY-2 (PHASE-1) have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is OFFICER CITY-2 (PHASE-1) located?

OFFICER CITY-2 (PHASE-1) is registered in Ghaziabad, as filed with UPRERA.

What configurations are available in OFFICER CITY-2 (PHASE-1)?

The unit plan filed with UPRERA lists 3 BHK and 2 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in OFFICER CITY-2 (PHASE-1)?

The approved unit plan filed with UPRERA runs from 46 to 75 m² of carpet area (about 492 to 802 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in OFFICER CITY-2 (PHASE-1)?

The approved unit plan describes 4 blocks and 450 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is OFFICER CITY-2 (PHASE-1)?

About 196 units per acre: 450 planned units across 2.29 acres (9,282 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗