OFFICER CITY-2 (PHASE-1) is a RERA-registered residential project by MR Proview Realtech Private Limited in Ghaziabad (RERA ID UPRERAPRJ6085). Registered with a completion deadline of 25 Sept 2020.
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ6085 |
| Project category | Residential |
| Registration type | Ongoing |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Ghaziabad Development Authority |
| Proposed start | 21 Dec 2011 |
| Original start | 21 Dec 2011 |
| Project duration | 106 months |
| Address | Modinagar, Ghaziabad |
| Tehsil | Modinagar |
| Applicant type | Company |
| Applicant address | THE GREAT NORTHERN BAZAAR, NH-58, RAJ NAGAR EXTENSION, OPP AJNARA GRACE, GHAZIABAD, UTTAR PARDESH-201017 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
- valid to
Permit revalidated
472/GMP/GH/12-13
2 building permits sanctioned
Registered with RERA
- valid to
Permit revalidated
930/GMP/GH/18-19
- to
Extension granted
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
- to
Extension granted
- to
Extension granted
“Six months extension in view of force majeure caused by covid-19 pandemic”
Completion certificate filed
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
2 completion certificates filed
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 31 Jul 2017 |
| Original completion | 28 Mar 2019 |
| Revised completion | 25 Sept 2020 |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 16 May 2020 |
| Registration fee | ₹51,500 |
| Sanctioning authority | Ghaziabad Development Authority |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
- 3 BHK240 53%
- 2 BHK210 47%
| Configuration | Units | Carpet area |
|---|---|---|
| 3 BHK | 240 | 65-75 |
| 2 BHK | 210 | 46-59 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| A · 3 BHK | 15 | 120 | 75 |
| B · 3 BHK | 15 | 120 | 65 |
| C · 2 BHK | 15 | 120 | 59 |
| D · 2 BHK | 15 | 90 | 46 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots Private- Free Hold Land, Demarcation was already done before starting the project |
| 2 | Boundary Wall Boundary wall on RCC Tie, Beam on RCC Footing |
| 3 | Road Work Cements Concrete Internal Roads( CC Roads above to Layers of WBM |
| 4 | Footpaths Interlocking Tile on PCC on competed surface |
| 5 | Water Supply Including Drinking Water Facilities To be provided by Ghaziabad Development Authority and stores will be done underground water tanks |
| 6 | Sewer System Main Sewer line has been design as per norm and partially led in basement ceiling and will finally connect to sewer line/ STP |
| 7 | Drain Under ground Drain pipe with chamber |
| 8 | Parks Landscape and park has been designed as per authority guide lines |
| 9 | Tree Planting Tree panting has been design as per Authority Guide lines |
| 10 | Design For Electric Supply Including Street Lighting Design has been done as per Up electricity Board Guide lines |
| 11 | Community Buildings Club has been Design as per Authority Norms and facility like party hall gaming zone Entertainment area gym etc. |
| 12 | Treatment and Disposal System of Sewage and Sullage water Sewage will be treated for recycling ( if required ) other wise it will be connected two sewage line of Authority which is already connected to central functional STP of GDA For this locality. |
| 13 | Solid Waste Management And Disposal System Door to Door Collection and will be treated by waste disposal management. |
| 14 | Water Conservation System Recycling of Treated water and rain water harvesting system to be provided. |
| 15 | Energy Management System Including Use of Renewable Energy Solar panel will be provided as per norms as suitable Places |
| 16 | Fire Protection And Fire Safety System Fire System is being executed per the norm of department of fire. |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services Nursary School in the premises |
| 18 | Emergency Evacuation Services Provision of exit sign and emergency light. |
| 19 | Other Miscellaneous Work N/A |
Permits & extensions
2 permits
An approval and the date it runs to - not proof the work matching it was done.
2 sanctioning permits are on record with UPRERA, the latest valid to 29 Aug 2018. All 2 carry a revalidation, the latest valid to 29 Aug 2021.
Sanctioned by Ghaziabad Development Authority · 9,282 sqm of land · an approved plan of 4 blocks and 450 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | RevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossary | Documents filed |
|---|---|---|---|---|---|---|
| 472/GMP/GH/12-13 | 30 Aug 2013 | 29 Mar 2018 | 28 Mar 2019 | 26 Mar 2020 | 22 Jun 2018 valid to 28 Mar 2019 as 930/GMP/GH/18-19 | |
| 472/GMP/GH/12-13 | 30 Aug 2013 | 29 Aug 2018 | 29 Aug 2021 | 26 Mar 2020 | 30 Aug 2013 valid to 29 Aug 2021 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | no file published |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Sanctioned layout plan The approved layout of the whole site: where the towers, roads and open areas sit on the plot. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Sanctioned layout plan The approved layout of the whole site: where the towers, roads and open areas sit on the plot. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Project approval The approval the promoter filed as the basis for registering the project. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
UPRERA’s record carries 3 completion extensions for this project, the latest running to 25 Sept 2020.
| # | Granted from | Extended upto | Note |
|---|---|---|---|
| 1 | 28 Mar 2019 | 27 Sept 2019 | — |
| 2 | 27 Sept 2019 | 26 Mar 2020 | — |
| 3 | 26 Mar 2020 | 25 Sept 2020 | Six months extension in view of force majeure caused by covid-19 pandemic |
Land & documents
21 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| PART OF 1048 VILLAGE NOOR NAGAR, GHAZIABAD | 12542.00 SQ.MT. | — |
| PART OF 1049 VILLAGE NOOR NAGAR, GHAZIABAD | 4930.00 SQ.MT. | — |
| PART OF 1059 VILLAGE NOOR NAGAR, GHAZIABAD | 285.00 SQ.MT. | — |
| PART OF 1060 VILLAGE NOOR NAGAR, GHAZIABAD | 1945.01 SQ.MT. | — |
4 registry or lease-deed filings are on this project’s record with UPRERA, the earliest dated 11 Jan 2011.
| Registry no. | Date | Type | Area |
|---|---|---|---|
| 248 (KH. NO.1048) | 11 Jan 2011 | self | — |
| 375 (KH.NO.1049) | 17 Jan 2011 | self | — |
| 8625 (KH. NO.1049) | 12 Jul 2012 | self | — |
| 8463 (KH. NO. 1060) | 9 Jul 2012 | self | — |
| Document | Status | Uploaded |
|---|---|---|
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 23 Apr 2019 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 31 Jul 2018 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 31 Jul 2018 ↗ |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | New | 31 Jul 2018 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 3 Aug 2018 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 3 Aug 2018 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 3 Aug 2018 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 31 Jul 2018 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 31 Jul 2018 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 29 Jul 2018 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | Old | 30 Jul 2017 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | Old | 30 Jul 2017 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 17 Oct 2017 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 30 Jan 2018 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 30 Jan 2018 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 30 Jan 2018 ↗ |
Facilities
as declared to RERA
Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.
| Drinking water | GROUND WATER |
| Fire safety (as filed with RERA) | AS PER FIRE NOC |
| Renewable energy | SOLAR POWER |
The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.
Quarterly progress reports
6 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
6 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2021-Q2.
| Quarter | Construction | Certificates |
|---|---|---|
| 2020-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q1 | — | Eng ↗ |
| 2021-Q2 | — | Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | MR Proview Realtech Private Limited |
| Role | Promoter · current |
| RERA ID | UPRERAPRM12058 |
| PAN | AAGCM4612D |
| CIN / TAN | U70200DL2010PTC200718 |
| Name of chairman | Rajeev Kumar Arora |
| Registered address | THE GREAT NORTHERN BAZAAR, NH-58, RAJ NAGAR EXTENSION, OPP AJNARA GRACE, GHAZIABAD, UTTAR PARDESH-201017 |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Ghaziabad
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| Bank account as filed | MR PROVIEW REALTECH PVT. LTD.BankAXIS BANK LTD.BranchAXIS BANK LTD. GROUND FLOOR, OFFICE NO-1, TOWER A, PLOT NO-41 THE CORRENTHUM, SECTOR-62, NOIDAA/C no.IFSCUTIB0000723 |
What has changed on this record
1 movement
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Promoter’s complaints tally (all their projects) | 210 (Under Registration - 1 ) → 210 (Under Registration - 0 ) changed in Estanzo’s record | 10 Aug 2026 |
| Promoter’s complaints tally (all their projects) | changed in Estanzo’s record · 10 Aug 2026 |
Common questions about OFFICER CITY-2 (PHASE-1)
Is OFFICER CITY-2 (PHASE-1) RERA registered?
Yes. OFFICER CITY-2 (PHASE-1) is registered with UPRERA under registration number UPRERAPRJ6085, registered on 31 Jul 2017. Estanzo reproduces that filing; it does not verify the work behind it.
Has OFFICER CITY-2 (PHASE-1) been completed?
UPRERA still lists OFFICER CITY-2 (PHASE-1) as Registered, so it is not shown as completed here. A completion certificate dated 16 May 2020 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.
Who is the builder of OFFICER CITY-2 (PHASE-1)?
MR Proview Realtech Private Limited is the promoter entity that filed OFFICER CITY-2 (PHASE-1) with UPRERA (promoter RERA ID UPRERAPRM12058). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Has UPRERA granted OFFICER CITY-2 (PHASE-1) more time to complete?
UPRERA's record carries 3 completion extensions for OFFICER CITY-2 (PHASE-1), the latest running to 25 Sept 2020. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.
Does OFFICER CITY-2 (PHASE-1) have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is OFFICER CITY-2 (PHASE-1) located?
OFFICER CITY-2 (PHASE-1) is registered in Ghaziabad, as filed with UPRERA.
What configurations are available in OFFICER CITY-2 (PHASE-1)?
The unit plan filed with UPRERA lists 3 BHK and 2 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in OFFICER CITY-2 (PHASE-1)?
The approved unit plan filed with UPRERA runs from 46 to 75 m² of carpet area (about 492 to 802 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
How many towers and units are planned in OFFICER CITY-2 (PHASE-1)?
The approved unit plan describes 4 blocks and 450 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is OFFICER CITY-2 (PHASE-1)?
About 196 units per acre: 450 planned units across 2.29 acres (9,282 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗