JANHWI ENCLAVE, EWS FLATS, LUCKNOW

UPRERARegistered

JANHWI ENCLAVE, EWS FLATS, LUCKNOW is a RERA-registered residential project by U.P. Awas Evam Vikas Parishad in Lucknow (RERA ID UPRERAPRJ8635). Registered with a completion deadline of 30 Jun 2018.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ8635
Project categoryResidential
Registration typeOngoing
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryU.P. Awas Evam Vikas Parishad
Proposed start23 Jan 2015
Original start16 Sept 2014
Project duration42 months
AddressLucknow, Lucknow
TehsilLucknow
Applicant typeCompetent authority
Applicant address104 Mahatma Gandhi Marg, Lucknow
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    3311/SE(HQ)/A-143

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

  6. Completion certificate filed

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered9 Aug 2017
Original completion30 Jun 2018
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary30 Mar 2019
Registration fee₹30,500
Sanctioning authorityU.P. Awas Evam Vikas Parishad

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors32 · 1 · 4 (units from plan)
ConfigurationUnitsCarpet area
1 BHK3229
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
1,2,3,4,5,6,7,8,9,10 · 1 BHK43229
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
ARCHITECTURE AND PLANNING UNIT 3
License PARISHAD ARCHITECT (DEPARTMENTAL)
NEELGIRI COMPLEX, INDIRA NAGAR, LUCKNOW
Engineer
Dr. VEERENDRA KUMAR
BHU IIT VARANASI
Contractor
MULTIPLE CONTRATORS
AS PER RECORDS
Sr.Development work declared to RERA
1Demarcation of Plots
As per design/Specification/Norms
2Boundary Wall
As per design/Specification/Norms
3Road Work
As per design/Specification/Norms
4Footpaths
As per design/Specification/Norms
5Water Supply Including Drinking Water Facilities
As per design/Specification/Norms
6Sewer System
As per design/Specification/Norms
7Drain
As per design/Specification/Norms
8Parks
As per design/Specification/Norms
9Tree Planting
As per design/Specification/Norms
10Design For Electric Supply Including Street Lighting
As per design/Specification/Norms
11Community Buildings
As per design/Specification/Norms
12Treatment and Disposal System of Sewage and Sullage water
As per design/Specification/Norms
13Solid Waste Management And Disposal System
As per design/Specification/Norms
14Water Conservation System
As per design/Specification/Norms
15Energy Management System Including Use of Renewable Energy
As per design/Specification/Norms
16Fire Protection And Fire Safety System
As per design/Specification/Norms
17Social Infrastructure And Other Public Amenities Including Public Health Services
As per design/Specification/Norms
18Emergency Evacuation Services
As per design/Specification/Norms
19Other Miscellaneous Work
As per design/Specification/Norms
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 30 Jun 2018.

Sanctioned by U.P. Awas Evam Vikas Parishad · 5,041 sqm of land · an approved plan of 1 block and 32 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
3311/SE(HQ)/A-14316 Sept 201430 Jun 201831 Jul 201830 Jun 2018
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗

Land & documents

18 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
EWS PLOT SECTOR-5 AWADH VIHAR YOJNA,LUCKNOW5041—
EWS PLOT SECTOR-55041Plot
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

1 registry or lease-deed filing is on this project’s record with UPRERA, dated 5 Dec 2007.

Registry no.DateTypeArea
2686/20055 Dec 2007self—
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · 2686/2005
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
not reported—
Water supply plan
How the project proposed to supply water, as filed at registration.
not reported—
Electricity supply plan
How the project proposed to supply power, as filed at registration.
not reported—
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
not reported—
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
not reported—
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
not reported—
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
not reported—
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New29 Jul 2018 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New29 Jul 2018 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New29 Jul 2018 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
Old8 Aug 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old22 Jan 2018 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
Old22 Jan 2018 ↗

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking waterAS PER NORMS
Fire safety (as filed with RERA)AS PER NORMS
Health serviceAS PER NORMS
Renewable energyNOT PROVIDED
Other facilitiesPARK, PARKING

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameU.P. Awas Evam Vikas Parishad
RolePromoter · current
RERA IDUPRERAPRM4243
PANAAAJU0103A
CIN / TANLKNU05017F
Registered address104 Mahatma Gandhi Marg, Lucknow
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Lucknow

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
EXECUTIVE ENGINEER, CD-14, AWAS VIKASBankPNBBranchINDIRA NAGARA/C no.IFSCPUNB0185300
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

14 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)761 (Under Registration - 10 ) → 762 (Under Registration - 11 )
changed in Estanzo’s record
19 Oct 2026
Promoter’s complaints tally (all their projects)760 (Under Registration - 9 ) → 761 (Under Registration - 10 )
changed in Estanzo’s record
18 Oct 2026
Promoter’s complaints tally (all their projects)759 (Under Registration - 8 ) → 760 (Under Registration - 9 )
changed in Estanzo’s record
15 Oct 2026
Promoter’s complaints tally (all their projects)758 (Under Registration - 7 ) → 759 (Under Registration - 8 )
changed in Estanzo’s record
13 Oct 2026
Promoter’s complaints tally (all their projects)757 (Under Registration - 6 ) → 758 (Under Registration - 7 )
changed in Estanzo’s record
9 Oct 2026
Promoter’s complaints tally (all their projects)755 (Under Registration - 4 ) → 757 (Under Registration - 6 )
changed in Estanzo’s record
7 Oct 2026
Promoter’s complaints tally (all their projects)753 (Under Registration - 2 ) → 755 (Under Registration - 4 )
changed in Estanzo’s record
5 Oct 2026
Promoter’s complaints tally (all their projects)753 (Under Registration - 6 ) → 753 (Under Registration - 2 )
changed in Estanzo’s record
1 Oct 2026
Promoter’s complaints tally (all their projects)752 (Under Registration - 5 ) → 753 (Under Registration - 6 )
changed in Estanzo’s record
29 Sept 2026
Promoter’s complaints tally (all their projects)751 (Under Registration - 4 ) → 752 (Under Registration - 5 )
changed in Estanzo’s record
25 Sept 2026
Promoter’s complaints tally (all their projects)750 (Under Registration - 3 ) → 751 (Under Registration - 4 )
changed in Estanzo’s record
17 Sept 2026
Promoter’s complaints tally (all their projects)748 (Under Registration - 1 ) → 750 (Under Registration - 3 )
changed in Estanzo’s record
3 Sept 2026
Promoter’s complaints tally (all their projects)747 (Under Registration - 0 ) → 748 (Under Registration - 1 )
changed in Estanzo’s record
1 Sept 2026
Promoter’s complaints tally (all their projects)746 (Under Registration - 2 ) → 747 (Under Registration - 0 )
changed in Estanzo’s record
23 Aug 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 19 Oct 2026 · 14 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No quarterly progress report is published for this project.Ask the promoter for the latest quarterly report filed and the construction percentage certified in it.

Common questions about JANHWI ENCLAVE, EWS FLATS, LUCKNOW

Is JANHWI ENCLAVE, EWS FLATS, LUCKNOW RERA registered?

Yes. JANHWI ENCLAVE, EWS FLATS, LUCKNOW is registered with UPRERA under registration number UPRERAPRJ8635, registered on 9 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.

Has JANHWI ENCLAVE, EWS FLATS, LUCKNOW been completed?

UPRERA still lists JANHWI ENCLAVE, EWS FLATS, LUCKNOW as Registered, so it is not shown as completed here. A completion certificate dated 30 Mar 2019 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.

Who is the builder of JANHWI ENCLAVE, EWS FLATS, LUCKNOW?

U.P. Awas Evam Vikas Parishad is the promoter entity that filed JANHWI ENCLAVE, EWS FLATS, LUCKNOW with UPRERA (promoter RERA ID UPRERAPRM4243). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does JANHWI ENCLAVE, EWS FLATS, LUCKNOW have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is JANHWI ENCLAVE, EWS FLATS, LUCKNOW located?

JANHWI ENCLAVE, EWS FLATS, LUCKNOW is registered in Lucknow, as filed with UPRERA.

What configurations are available in JANHWI ENCLAVE, EWS FLATS, LUCKNOW?

The unit plan filed with UPRERA lists 1 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

How many towers and units are planned in JANHWI ENCLAVE, EWS FLATS, LUCKNOW?

The approved unit plan describes 1 block and 32 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is JANHWI ENCLAVE, EWS FLATS, LUCKNOW?

About 26 units per acre: 32 planned units across 1.25 acres (5,041 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗