Jaypee Greens Garden Isles, Noida is a RERA-registered residential project by Jaypee Infratech Limited in Gautam Budh Nagar (RERA ID UPRERAPRJ3784). Registered with a completion deadline of 31 Dec 2025.
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ3784 |
| Project category | Residential |
| Registration type | Ongoing |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Noida Authority |
| Proposed start | 12 Nov 2011 |
| Original start | 12 Nov 2011 |
| Project duration | 170 months |
| Address | Gautam Buddha Nagar, Gautam Budh Nagar |
| Tehsil | Gautam Buddha Nagar |
| Applicant type | Company |
| Applicant address | Sector - 128, Noida - 201304, Uttar Pradesh (India) |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Building permit sanctioned
Noida/CAP/ 2014/ III - 287/714
Registered with RERA
- valid to
Permit revalidated
Noida/CAP/ 2014/ III - 287/714
Building permit sanctioned
Noida/CAP/ 2014/ III - 287/714
- to
Extension granted
“Six months extension in view of force majeure caused by covid-19 pandemic”
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
- to
Extension granted
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 28 Jul 2017 |
| Original completion | 30 Jun 2021 |
| Revised completion | 31 Dec 2025 |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹6,15,500 |
| Sanctioning authority | Noida Authority |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
- 3 BHK1,538 47%
- 2 BHK1,514 46%
- 4 BHK232 7%
| Configuration | Units | Carpet area |
|---|---|---|
| 3 BHK | 1,538 | 104-137 |
| 2 BHK | 1,514 | 74-74 |
| 4 BHK | 232 | 164-167 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| GDI003 · OTHER, 3 BHK, 2 BHK | 34 | 131 | 74-104 |
| GDI004 · OTHER, 3 BHK, 2 BHK | 34 | 131 | 74-104 |
| GDI005 · OTHER, 3 BHK, 2 BHK | 34 | 131 | 74-117 |
| GDI006 · OTHER, 3 BHK, 2 BHK | 34 | 131 | 74-117 |
| GDI007 · OTHER, 3 BHK, 2 BHK | 34 | 131 | 74-104 |
| GDI008 · OTHER, 3 BHK, 2 BHK | 34 | 131 | 74-104 |
| GDI009 · OTHER, 3 BHK, 2 BHK | 34 | 131 | 74-104 |
| GDI010 · OTHER, 4 BHK, 3 BHK | 40 | 117 | 137-167 |
| GDI011 · OTHER, 4 BHK, 3 BHK | 40 | 117 | 137-167 |
| GDI012 · OTHER, 3 BHK, 2 BHK | 40 | 155 | 74-117 |
| GDI014 · OTHER, 3 BHK, 2 BHK | 37 | 143 | 74-104 |
| GDI015 · OTHER, 3 BHK, 2 BHK | 37 | 143 | 74-104 |
| GDI016 · OTHER, 3 BHK, 2 BHK | 40 | 155 | 74-104 |
| GDI017 · OTHER, 3 BHK, 2 BHK | 37 | 143 | 74-104 |
| GDI018 · 3 BHK, OTHER, 2 BHK | 37 | 143 | 74-104 |
| GDI019 · OTHER, 3 BHK, 2 BHK | 40 | 155 | 74-104 |
| GDI020 · 3 BHK, 2 BHK, OTHER | 37 | 143 | 74-104 |
| GDI021 · OTHER, 3 BHK, 2 BHK | 37 | 143 | 74-104 |
| GDI022 · OTHER, 3 BHK, 2 BHK | 40 | 155 | 74-117 |
| GDI023 · OTHER, 3 BHK, 2 BHK | 34 | 131 | 74-104 |
| GDI024 · OTHER, 3 BHK, 2 BHK | 34 | 131 | 74-104 |
| GDI025 · OTHER, 3 BHK, 2 BHK | 34 | 131 | 74-104 |
| GDI026 · 2 BHK, OTHER, 3 BHK | 34 | 131 | 74-104 |
| GDI027 · OTHER, 3 BHK, 2 BHK | 34 | 131 | 74-104 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots As per Location Plan |
| 2 | Boundary Wall Boundary wall/Fencing, partly constructed at overall township Level |
| 3 | Road Work As per Location Plan |
| 4 | Footpaths As per Location Plan |
| 5 | Water Supply Including Drinking Water Facilities As per Development Plan |
| 6 | Sewer System As per Development Plan |
| 7 | Drain As per Development Plan |
| 8 | Parks As per Development Plan |
| 9 | Tree Planting As per YEIDA Authority Norms |
| 10 | Design For Electric Supply Including Street Lighting As per YEIDA Authority Norms |
| 11 | Community Buildings As per Sanctioned Layout Plan |
| 12 | Treatment and Disposal System of Sewage and Sullage water As per Sanctioned Layout Plan |
| 13 | Solid Waste Management And Disposal System To be provided at township level after occupation of Buildings, as per YEIDA Authority Norms |
| 14 | Water Conservation System Rain Water Harvesting, STP effluent to be used for irrigation and flushing |
| 15 | Energy Management System Including Use of Renewable Energy As per Environment Impact Assessment Authority Advice |
| 16 | Fire Protection And Fire Safety System As per Fire Department Norms |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services As per Sanctioned Layout Plan |
| 18 | Emergency Evacuation Services As per Fire Department Norms |
| 19 | Other Miscellaneous Work As per Sanctioned Layout Plan |
Permits & extensions
2 permits
An approval and the date it runs to - not proof the work matching it was done.
2 sanctioning permits are on record with UPRERA, the latest valid to 13 Aug 2024. 1 of them carries a revalidation, valid to 31 Dec 2025.
Sanctioned by Noida Authority · 1,22,045 sqm of land · an approved plan of 24 blocks and 3284 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | RevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossary | Documents filed |
|---|---|---|---|---|---|---|
| Noida/CAP/ 2014/ III - 287/714 | 8 Jan 2014 | 1 Jul 2019 | 31 Dec 2025 | 29 Dec 2021 | — | |
| Noida/CAP/ 2014/ III - 287/714 | 7 Jan 2019 | 13 Aug 2024 | 31 Dec 2025 | 29 Dec 2021 | 7 Jan 2019 valid to 31 Dec 2025 |
| Document | File |
|---|---|
| Project approval The approval the promoter filed as the basis for registering the project. | PDF ↗ |
| Sanctioned layout plan The approved layout of the whole site: where the towers, roads and open areas sit on the plot. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
UPRERA’s record carries 2 completion extensions for this project, the latest running to 31 Dec 2025.
| # | Granted from | Extended upto | Note |
|---|---|---|---|
| 1 | 30 Jun 2021 | 29 Dec 2021 | Six months extension in view of force majeure caused by covid-19 pandemic |
| 2 | 29 Dec 2021 | 31 Dec 2025 | — |
Land & documents
19 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| B-46,47,48,49 | 122045 | Plot |
7 registry or lease-deed filings are on this project’s record with UPRERA, the earliest dated 16 Feb 2008.
| Registry no. | Date | Type | Area |
|---|---|---|---|
| 1966 | 16 Feb 2008 | self | — |
| 1965 | 16 Feb 2008 | self | — |
| 5851 | 15 May 2008 | self | — |
| 521 | 9 Jan 2009 | self | — |
| 8199 | 30 Jun 2009 | self | — |
| 8197 | 30 Jun 2009 | self | — |
| 17114 | 1 Jul 2010 | self | — |
| Lease deed · 1966 The deed by which a development authority leased the land to the promoter, with the term and the conditions on it. | PDF ↗ |
| Lease deed · 1965 The deed by which a development authority leased the land to the promoter, with the term and the conditions on it. | PDF ↗ |
| Lease deed · 5851 The deed by which a development authority leased the land to the promoter, with the term and the conditions on it. | PDF ↗ |
| Lease deed · 521 The deed by which a development authority leased the land to the promoter, with the term and the conditions on it. | PDF ↗ |
| Lease deed · 8199 The deed by which a development authority leased the land to the promoter, with the term and the conditions on it. | PDF ↗ |
| Lease deed · 8197 The deed by which a development authority leased the land to the promoter, with the term and the conditions on it. | PDF ↗ |
| Lease deed · 17114 The deed by which a development authority leased the land to the promoter, with the term and the conditions on it. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 9 Jun 2018 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 9 Jun 2018 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 2 Jun 2018 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 2 Jun 2018 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 2 Jun 2018 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 16 Apr 2018 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 16 Apr 2018 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 16 Apr 2018 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 16 Apr 2018 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 16 Apr 2018 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 16 Apr 2018 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 16 Apr 2018 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | Old | 16 Apr 2018 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | Old | 16 Apr 2018 ↗ |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | Old | 16 Apr 2018 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | Old | 17 Apr 2018 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | Old | 17 Apr 2018 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | Old | 17 Apr 2018 ↗ |
Facilities
as declared to RERA
Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.
| Drinking water | Available |
| Fire safety (as filed with RERA) | BH-12/CFO/GBN-12(1)\395 FEB.14,2012 |
| Other facilities | as per approved Layout Plan of Wishtown Noida |
The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.
Quarterly progress reports
7 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
7 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2021-Q3.
| Quarter | Construction | Certificates |
|---|---|---|
| 2020-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | Jaypee Infratech Limited |
| Role | Promoter · current |
| RERA ID | UPRERAPRM6253 |
| PAN | AABCJ9042R |
| CIN / TAN | L45203UP2007PLC033119 |
| Name of chairman | Sh. Manoj Gaur |
| Registered address | Sector - 128, Noida - 201304, Uttar Pradesh (India) |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Gautam Budh Nagar
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | JAYPEE INFRATECH LIMITED COLLECTION ACCOUNT FOR JAYPEE GREENS GARDEN ISLES, NOIDABankIDBI Bank Ltd.BranchSector 18, Noida BranchBranch addressGround Floor, Ocean Complex P-6 Sector 18, Noida, Uttar Pradesh - 201301Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCIBKL0000109Branch emailibkl0000109-at-the-rate-idbi.co.in |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | JAYPEE GREENS GARDEN ISLES, NOIDABankIDBI Bank Ltd.BranchSector 18, Noida BranchBranch addressGround Floor, Ocean Complex P-6 Sector 18, Noida, Uttar Pradesh - 201301Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCIBKL0000109Branch emailibkl0000109idbi.co.in |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | JAYPEE INFRATECH LIMITED TRANSACTION ACCOUNT FOR JAYPEE GREENS GARDEN ISLES, NOIDABankIDBI Bank Ltd.BranchSector 18, Noida BranchBranch addressGround Floor, Ocean Complex P-6 Sector 18, Noida, Uttar Pradesh - 201301Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCIBKL0000109Branch emailibkl0000109-at-the-rate-idbi.co.in |
What has changed on this record
20 movements
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Promoter’s complaints tally (all their projects) | 297 (Under Registration - 9 ) → 298 (Under Registration - 10 ) changed in Estanzo’s record | 19 Oct 2026 |
| Filed document viewprojects · 23 | Proforma of Conveyance Deed newly filed with RERA | 15 Oct 2026 |
| Filed document viewprojects · 22 | Proforma of Allotment Letter newly filed with RERA | 15 Oct 2026 |
| Filed document viewprojects · 21 | Proforma of Application Form newly filed with RERA | 15 Oct 2026 |
| Filed document viewprojects · 20 | Details of Encumbrances newly filed with RERA | 15 Oct 2026 |
| Filed document viewprojects · 19 | Affidavit (Form-B) newly filed with RERA | 15 Oct 2026 |
| Filed document viewprojects · 18 | Development Work Plan newly filed with RERA | 15 Oct 2026 |
| Filed document viewprojects · 17 | Other Plan(If Any) newly filed with RERA | 15 Oct 2026 |
| Filed document viewprojects · 16 | Floor plans of all types newly filed with RERA | 15 Oct 2026 |
| Filed document viewprojects · 15 | Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks) newly filed with RERA | 15 Oct 2026 |
| Filed document viewprojects · 14 | Sanctioned Layout Plan (Of Entire Project) newly filed with RERA | 15 Oct 2026 |
| Filed document viewprojects · 13 | Authentic copy of Approval of Project newly filed with RERA | 15 Oct 2026 |
| Filed document viewprojects · 12 | Registry Document In Case of Own Land newly filed with RERA | 15 Oct 2026 |
| Filed document viewprojects · 11 | Registry Document In Case of Own Land newly filed with RERA | 15 Oct 2026 |
| Filed document viewprojects · 10 | Registry Document In Case of Own Land newly filed with RERA | 15 Oct 2026 |
| Filed document viewprojects · 9 | Registry Document In Case of Own Land newly filed with RERA | 15 Oct 2026 |
| Filed document viewprojects · 8 | Registry Document In Case of Own Land newly filed with RERA | 15 Oct 2026 |
| Filed document viewprojects · 7 | Registry Document In Case of Own Land newly filed with RERA | 15 Oct 2026 |
| Filed document viewprojects · 6 | Registry Document In Case of Own Land newly filed with RERA | 15 Oct 2026 |
| Filed document viewprojects · 5 | Electricity Supply Plan newly filed with RERA | 15 Oct 2026 |
| Promoter’s complaints tally (all their projects) | changed in Estanzo’s record · 19 Oct 2026 · 7 movements on record |
Common questions about Jaypee Greens Garden Isles, Noida
Is Jaypee Greens Garden Isles, Noida RERA registered?
Yes. Jaypee Greens Garden Isles, Noida is registered with UPRERA under registration number UPRERAPRJ3784, registered on 28 Jul 2017. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for Jaypee Greens Garden Isles, Noida?
The completion date filed with UPRERA is 31 Dec 2025. No completion certificate is on record yet.
Who is the builder of Jaypee Greens Garden Isles, Noida?
Jaypee Infratech Limited is the promoter entity that filed Jaypee Greens Garden Isles, Noida with UPRERA (promoter RERA ID UPRERAPRM6253). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Has UPRERA granted Jaypee Greens Garden Isles, Noida more time to complete?
UPRERA's record carries 2 completion extensions for Jaypee Greens Garden Isles, Noida, the latest running to 31 Dec 2025. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.
Does Jaypee Greens Garden Isles, Noida have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is Jaypee Greens Garden Isles, Noida located?
Jaypee Greens Garden Isles, Noida is registered in Gautam Budh Nagar, as filed with UPRERA.
What configurations are available in Jaypee Greens Garden Isles, Noida?
The unit plan filed with UPRERA lists OTHER, 3 BHK, 2 BHK and 4 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in Jaypee Greens Garden Isles, Noida?
The approved unit plan filed with UPRERA runs from 74 to 167 m² of carpet area (about 793 to 1,792 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
How many towers and units are planned in Jaypee Greens Garden Isles, Noida?
The approved unit plan describes 24 blocks and 3,284 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is Jaypee Greens Garden Isles, Noida?
About 109 units per acre: 3,284 planned units across 30.16 acres (1,22,045 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗