Paras One33

UPRERARegistered

Paras One33 is a RERA-registered commercial project by Admired Height Projects Private Limited in Gautam Budh Nagar (RERA ID UPRERAPRJ5576). Registered with a completion deadline of 30 May 2022.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ5576
Project categoryCommercial
Registration typeOngoing
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryNoida Authority
Proposed start1 Jun 2018
Original start7 Dec 2016
Project duration48 months
AddressGautam Budh Nagar
Applicant typeCompany
Applicant addressRoom no. 205, Welcome plaza, S-551, School Block- II, Shakarpur, New Delhi- 110092
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. 2 building permits sanctioned

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  5. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  6. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

  7. Completion certificate filed

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered4 Aug 2017
Original completion1 Dec 2021
Revised completion30 May 2022
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary4 Jan 2023
Registration fee₹93,000
Sanctioning authorityNoida Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors— · 1 · 7 (from plan)
ConfigurationUnitsCarpet area
SHOP—1,553-2,195
OTHER—777-1,880
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
PARAS ONE33 · SHOP, OTHER7—777-2,195
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.No unit total is shown: the plan's flat-count column contradicts this project's other filings.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Rajiv Goel
License CA/76/2361
E-2, Sector 55, Noida
Engineer
Constructure Design Pvt Ltd
3rd Floor, Abhhishek Plaza, Mayur Vihar - II, New Delhi - 110091
Contractor
Self
self
Sr.Development work declared to RERA
1Demarcation of Plots
As per approved drawings by Noida authority (2.04 Acre)
2Boundary Wall
As per approved drawings
3Road Work
As per approved drawings
4Footpaths
As per approved drawings
5Water Supply Including Drinking Water Facilities
Main water supply line will be taken from Govt. authority , it will be further treated and distributed for entire building
6Sewer System
Entire Sewer will be treated in our installed STP plant
7Drain
Sewer will be in our own STP through various sizes of pipes
8Parks
As per horticulture Plan
9Tree Planting
As per horticulture Plan
10Design For Electric Supply Including Street Lighting
Main Electric supply line will be taken from Govt. authority Power back up by our DG , it will be further distributed for entire building through various HT & MV panels
11Community Buildings
commercial
12Treatment and Disposal System of Sewage and Sullage water
STP will be installed for its treatment
13Solid Waste Management And Disposal System
STP will be installed for its treatment
14Water Conservation System
Rain water harvesting will be done as per approved Plan
15Energy Management System Including Use of Renewable Energy
It will be adopted as per Govt. authority guideline.
16Fire Protection And Fire Safety System
Entire building will be equipped as per latest NBC fire Norms i.e. sprinkler and detector will be installed
17Social Infrastructure And Other Public Amenities Including Public Health Services
As per approved by Noida authority
18Emergency Evacuation Services
Emergency lighting with 30 Min power back up will be provided in main fire escape route.
19Other Miscellaneous Work
NIL
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

4 agents

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1GATEWAY PROPMART PVT LTDUPRERAAGT10384
2INVESTORS CLINIC INFRATECH PRIVATE LIMITEDUPRERAAGT10052
3UMANG ESTATES C/O VIRENDER SINGHUPRERAAGT11784
4WEALTH CLINIC PRIVATE LIMITEDUPRERAAGT10521
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

2 permits

An approval and the date it runs to - not proof the work matching it was done.

2 sanctioning permits are on record with UPRERA, the latest valid to 6 Dec 2021.

Sanctioned by Noida Authority · 8,273 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
9437 Dec 20166 Dec 20216 Dec 20211 Dec 2021
9437 Dec 20166 Dec 20216 Dec 20211 Dec 2021
Plans and approvals filed with RERA
DocumentFile
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 1 completion extension for this project, running to 30 May 2022.

#Granted fromExtended uptoNote
11 Dec 202130 May 2022Six months extension in view of force majeure caused by covid-19 pandemic

Land & documents

5 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
C1 D18273Plot
C1 D18273Plot
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Lease deed · 5984
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Document checklist
DocumentStatusUploaded
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old30 Jul 2017 ↗
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
Old30 Jul 2017 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
Old30 Jul 2017 ↗

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking waterYes
Fire safety (as filed with RERA)Yes
Renewable energyNo
Other facilitiesas per plan

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameAdmired Height Projects Private Limited
RolePromoter · current
RERA IDUPRERAPRM6434
PANAAKCA9206D
CIN / TANU70101DL2012PTC242042
Name of chairmanHarender Nagar Kartik Mahto
Registered addressRoom no. 205, Welcome plaza, S-551, School Block- II, Shakarpur, New Delhi- 110092
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Gautam Budh Nagar

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
Admired Heights Projects Pvt LtdBankHDFC BANK LTDBranchVatika AtriumA/C no.IFSCHDFC0000572
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

3 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)24 (Under Registration - 2 ) → 24 (Under Registration - 0 )
changed in Estanzo’s record
21 Sept 2026
Promoter’s complaints tally (all their projects)23 (Under Registration - 1 ) → 24 (Under Registration - 2 )
changed in Estanzo’s record
9 Sept 2026
Promoter’s complaints tally (all their projects)22 (Under Registration - 1 ) → 23 (Under Registration - 1 )
changed in Estanzo’s record
23 Aug 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 21 Sept 2026 · 3 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No quarterly progress report is published for this project.Ask the promoter for the latest quarterly report filed and the construction percentage certified in it.

Common questions about Paras One33

Is Paras One33 RERA registered?

Yes. Paras One33 is registered with UPRERA under registration number UPRERAPRJ5576, registered on 4 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.

Has Paras One33 been completed?

UPRERA still lists Paras One33 as Registered, so it is not shown as completed here. A completion certificate dated 4 Jan 2023 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.

Who is the builder of Paras One33?

Admired Height Projects Private Limited is the promoter entity that filed Paras One33 with UPRERA (promoter RERA ID UPRERAPRM6434). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted Paras One33 more time to complete?

UPRERA's record carries 1 completion extension for Paras One33, the latest running to 30 May 2022. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does Paras One33 have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Paras One33 located?

Paras One33 is registered in Gautam Budh Nagar, as filed with UPRERA.

What configurations are available in Paras One33?

The unit plan filed with UPRERA lists SHOP and OTHER. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in Paras One33?

The approved unit plan filed with UPRERA runs from 777 to 2,195 m² of carpet area (about 8,364 to 23,627 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗