JHANSI HOMES

UPRERARegistered

JHANSI HOMES is a RERA-registered residential project by SIVANTA INFRATECH in Jhansi (RERA ID UPRERAPRJ13308). Registered with a completion deadline of 30 Sept 2021.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ13308
Project categoryResidential
Registration typeNew
RERA statusRegistered
Proposed start4 Apr 2017
Project duration54 months
AddressJhansi, Jhansi
TehsilJhansi
Applicant typePartnership Firm
Applicant addressBEHIND HAZI PETROLPUMP, SHIVPURI ROAD, JHANSI.
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  2. Registered with RERA

  3. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

  6. Completion certificate filed

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered3 Oct 2017
Original completion31 Mar 2021
Revised completion30 Sept 2021
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary10 Aug 2023
Registration fee₹31,500

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
ATUL PATHAK
License CA/2008/42515
PATHAK ARCHITECTURAL ASSO. PVT. LTD. 41-B ,GANDHI ENCLAVE,GANDHI ROAD , GWALIOR
Engineer
S K SAVARWAL
HS-25 2ND FLOOR, KAILASH COLONY,NOIDA
Contractor
NA
NA

Registered agents

2 agents

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1360 REALTORS LLPUPRERAAGT10868
2AADHAR PROPMART PRIVATE LIMITEDUPRERAAGT10142
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

0 permits

An approval and the date it runs to - not proof the work matching it was done.

5,300 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.

Plans and approvals filed with RERA
DocumentFile
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 1 completion extension for this project, running to 30 Sept 2021.

#Granted fromExtended uptoNote
131 Mar 202130 Sept 2021Six months extension in view of force majeure caused by covid-19 pandemic

Land & documents

1 filing

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
7915320—
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

1 registry or lease-deed filing is on this project’s record with UPRERA, dated 5 Mar 2014.

Registry no.DateTypeArea
17595 Mar 2014self—

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking waterTHREE BORE WELL WITH HUGE WATER STORAGE TANK
Fire safety (as filed with RERA)EVERY FLOOR AND THE CAMPUS WILL BE COVERED WITH FIRE EXTINGUISHER
Health serviceGOVERNMENT AND PRIVATE HOSPITAL ARE WITH IN THE RADIUS OF 1 KM
Renewable energyWATER HARVESTING WILL BE PROVIDED
Other facilitiesCCTV CAMERA FOR CAMPUS

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameSIVANTA INFRATECH
RolePromoter · current
RERA IDUPRERAPRM26060
PANACNFS2928L
CIN / TANAGRS17071F
Registered addressBEHIND HAZI PETROLPUMP, SHIVPURI ROAD, JHANSI.
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Jhansi

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
SIVANTA INFRATECHBankPUNJAB NATIONAL BANKBranchCIVIL LINE JHANSIA/C no.IFSCPUNB0367200
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

3 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No sanctioning permit is published for this project.Ask which authority sanctioned the plans, for the permit number, and for the date it is valid to.
  • No quarterly progress report is published for this project.Ask the promoter for the latest quarterly report filed and the construction percentage certified in it.
  • No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.

Common questions about JHANSI HOMES

Is JHANSI HOMES RERA registered?

Yes. JHANSI HOMES is registered with UPRERA under registration number UPRERAPRJ13308, registered on 3 Oct 2017. Estanzo reproduces that filing; it does not verify the work behind it.

Has JHANSI HOMES been completed?

UPRERA still lists JHANSI HOMES as Registered, so it is not shown as completed here. A completion certificate dated 10 Aug 2023 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.

Who is the builder of JHANSI HOMES?

SIVANTA INFRATECH is the promoter entity that filed JHANSI HOMES with UPRERA (promoter RERA ID UPRERAPRM26060). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted JHANSI HOMES more time to complete?

UPRERA's record carries 1 completion extension for JHANSI HOMES, the latest running to 30 Sept 2021. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does JHANSI HOMES have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is JHANSI HOMES located?

JHANSI HOMES is registered in Jhansi, as filed with UPRERA.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗