Shiv Vardan Vihar is a RERA-registered residential project by SHIV VARDAN DEVELOPERS in Jhansi (RERA ID UPRERAPRJ955952). Registered with a completion deadline of 31 Jan 2022.
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ955952 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Jhansi Development Authority |
| Proposed start | 1 Jan 2019 |
| Project duration | 37 months |
| Address | Jhansi, Jhansi |
| Tehsil | Jhansi |
| Applicant type | Partnership Firm |
| Applicant address | SHIV VARDAN VIHAR, SHIVPURI ROAD, PALI PAHADI, JHANSI, UTTAR PRADESH |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
1798
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
Completion certificate filed
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 18 Mar 2021 |
| Original completion | 31 Jan 2022 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 21 Jul 2022 |
| Registration fee | ₹19,000 |
| Sanctioning authority | Jhansi Development Authority |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots 21 Plots are demarcated by small Bricks made boundary wall. |
| 2 | Boundary Wall Plots have been separated through the small bricks made boundary wall covered by height of 2.5 Mtr. |
| 3 | Road Work All the road as specified in the map are apex and CC road width of 12.19M at East, 9.14M at West, 9.14M at North, 9.14M at South . |
| 4 | Footpaths Footpath alongside the road proposed width of 1 mtr. |
| 5 | Water Supply Including Drinking Water Facilities Water supply provide threw ground water supply and water storage tank |
| 6 | Sewer System Septic tanks and soak pit work is proposed for the entire project. |
| 7 | Drain Drainage for storm water management and Nala for wastage and sullage water is proposed for drainage . |
| 8 | Parks Park is proposed as per jhansi Development Authority term and conditions. |
| 9 | Tree Planting Both side of road are decorated by palm and other trees and bushes. Bushes and tree are the parts of the green area. |
| 10 | Design For Electric Supply Including Street Lighting The service of Electricity supply provide threw transformer using electric pole. |
| 11 | Community Buildings N/A |
| 12 | Treatment and Disposal System of Sewage and Sullage water For treatment and disposal of wewage and sullage water Septic Tanks and Soak PIT is proposed. |
| 13 | Solid Waste Management And Disposal System For solid waste management dustbin is proposed. After getting completion certificate it will be handed over to the local municipal corporation. |
| 14 | Water Conservation System Area is market at sanction plan for Rain water harvesting system. |
| 15 | Energy Management System Including Use of Renewable Energy Use of solar energy for street light work in progress. |
| 16 | Fire Protection And Fire Safety System We are developing land for plotting so there is no fire alarm or fire safety is proposed |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services N.A. |
| 18 | Emergency Evacuation Services We are developing land for plotting so there is no need of emergency evacuation. |
| 19 | Other Miscellaneous Work Not Applicable |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 28 Nov 2023.
Sanctioned by Jhansi Development Authority · 2,730 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| 1798 | 29 Nov 2018 | 28 Nov 2023 | 28 Nov 2026 | 31 Jan 2022 |
| Document | File |
|---|---|
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
Land & documents
14 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 1st and 2nd | 2729.85 | Plot |
| Registry document · 4109 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Khatauni extract · 1426-1431 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | not reported | — |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 28 Nov 2020 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 28 Nov 2020 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 22 Feb 2021 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 22 Feb 2021 ↗ |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | New | 28 Nov 2020 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 28 Nov 2020 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 28 Nov 2020 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 28 Nov 2020 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 28 Nov 2020 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 13 Mar 2021 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 4 Feb 2021 ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | SHIV VARDAN DEVELOPERS |
| Role | Promoter · current |
| RERA ID | UPRERAPRM102120 |
| PAN | ADQFS4361M |
| CIN / TAN | AGRS18159B |
| Registered address | SHIV VARDAN VIHAR, SHIVPURI ROAD, PALI PAHADI, JHANSI, UTTAR PRADESH |
| RERA contact | |
| Registered since | 2019 |
Nearby projects
Jhansi
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| Bank account as filed | SHIV VARDAN DEVELOPERSBankAXIS BANK LTD.BranchSIPRI BAZARA/C no.IFSCUTIB0003446 |
What has changed on this record
nothing recorded yet
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.What to verify and what to ask
3 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No quarterly progress report is published for this project.Ask the promoter for the latest quarterly report filed and the construction percentage certified in it.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about Shiv Vardan Vihar
Is Shiv Vardan Vihar RERA registered?
Yes. Shiv Vardan Vihar is registered with UPRERA under registration number UPRERAPRJ955952, registered on 18 Mar 2021. Estanzo reproduces that filing; it does not verify the work behind it.
Has Shiv Vardan Vihar been completed?
UPRERA still lists Shiv Vardan Vihar as Registered, so it is not shown as completed here. A completion certificate dated 21 Jul 2022 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.
Who is the builder of Shiv Vardan Vihar?
SHIV VARDAN DEVELOPERS is the promoter entity that filed Shiv Vardan Vihar with UPRERA (promoter RERA ID UPRERAPRM102120). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does Shiv Vardan Vihar have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is Shiv Vardan Vihar located?
Shiv Vardan Vihar is registered in Jhansi, as filed with UPRERA.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗