Kaveri City Centre-2

UPRERARegistered

Kaveri City Centre-2 is a RERA-registered commercial project by KAVERI ELITE INFRA DEVELOPERS PRIVATE LIMITED in Sector Delta-1, Greater Noida, Gautam Budh Nagar (RERA ID UPRERAPRJ360269). Registered with a completion deadline of 7 Jan 2031.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ360269
Project categoryCommercial
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryGreater Noida Authority
Proposed start15 Jan 2026
Project duration60 months
AddressCommercial Plot No. C-5, Sector Delta -1, Greater Noida, Gautam Buddha Nagar, Uttar Pradesh, PIN-201310, Sector Delta-1, Greater Noida, Gautam Buddha Nagar, Gautam Budh Nagar
TehsilGautam Buddha Nagar
Applicant typeCompany
Applicant addressRegd. Office - E-40, 1st Floor, UPSIDC, Site-IV, Kasna indu Area, I.A. Surajpur, Noida, Gautam Buddha Nagar, Uttar Pradesh, PIN-201306
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    PLG/BP SM-30-SEPT-2025.26254

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2025-26
Q1Q2Q3Q4
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered20 Mar 2026
Original completion7 Jan 2031
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹58,000
Sanctioning authorityGreater Noida Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors693 · 1 · 23 (units from plan)
Homes · commercial units430 · 263 (shops and offices filed in the same plan)
  • STUDIO425 61%
  • SHOP263 38%
  • OTHER5 1%
ConfigurationUnitsCarpet area
SHOP2635-157
OTHER526-245
STUDIO42517-26
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
Commercial Tower · SHOP, OTHER, STUDIO236935-245
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Ravi Raj Jain
License CA/2024/170151
Unit No. 821, 8th Floor, Galaxy Blue Sapphire, Sector -4, Greater Noida (West), Gautam Buddha Nagar, Uttar Pradesh, PIN-201318
Engineer
Abha Gupta
C-55, East of Kailash, New Delhi-65
Contractor
Kaveri Elite Infra Developers Private Limited
E-40, 1st Floor, UPSIDC, Site-IV, Kasna indu Area, I.A. Surajpur, Noida, Gautam Buddha Nagar, Uttar Pradesh, PIN-201306
Sr.Development work declared to RERA
1Demarcation of Plots
The project land comprises an irregular quadrilateral plot bounded by four sides measuring 79.97 meters, 60.14 meters, 80.00 meters, and 59.86 meters respectively. Based on the average of the opposite sides, the approximate plot dimensions are 79.99 meters x 60.00 meters, and the total land area is approximately 4,800 square meters.
2Boundary Wall
The boundary wall consists of a 230 mm thick brick masonry wall constructed over a suitable foundation. The masonry portion attains a height of 900 mm above the finished ground level. Atop the brick wall, a 1100 mm high metal railing is securely fixed, providing a combined overall height of 2000 mm for the wall and railing assembly. A protective coping layer is provided at the top of the brick wall to ensure durability, prevent water ingress, and offer a stable base for railing installation.
3Road Work
The internal roads comprise a 7.0 m wide carriageway along the front side of the plot and 6.0 m wide carriageways along the remaining three sides. The main carriageway is designed with a 2.5 percent cross-fall for surface drainage, and footpaths on both sides with a 3 percent slope. The pavement structure consists of asphalt layers over, base, and sub-base courses. Reinforced concrete service ducts are provided beneath the footpaths and along the road edges to carry electrical, water supply, sewerage, and telecommunications services. Street lighting poles are provided along both sides of the roads.
4Footpaths
Footpaths are provided on both sides of the internal roads with a 3 percent slope for drainage, constructed using interlocking concrete paver blocks over a compacted sand bed and granular sub-base, with concrete kerb stones along the road edge.
5Water Supply Including Drinking Water Facilities
Municipal or borewell water supply will be used to fill the underground water tank (UGT- 4 Nos., each of size 6.8 x 3.63 x 2.05m, with a total storage capacity of 200 KL). The water will then be treated in the WTP and STP and pumped to the overhead tank, from where it will be supplied through a gravity system.
6Sewer System
Soil and wastewater from toilets and kitchens will be collected through vertical pipes in the plumbing shaft and conveyed through 200 mm diameter pipes to the external sewerage system, with manholes of size 800 x 900 x 1400 mm provided at appropriate intervals, from where it will be conveyed to the Sewage Treatment Plan (STP).
7Drain
Rainwater from the terrace and open areas will be collected through vertical rainwater pipes and conveyed through 300 mm diameter stormwater pipes (total length 174 m) to the external stormwater drainage system, with 12 Nos. of manholes of size 800 x 900 x 1300 mm provided at suitable intervals. The external stormwater system will carry all rainwater from the premises and direct it to the rainwater harvesting system for groundwater recharge.
8Parks
The open area of the plot, calculated by subtracting the ground coverage (1915.21 sq. m) from the total plot area- (4800.00 square metres), is 2884.79 sq. m. As per the requirement of 25 percent of the open area, the minimum green area required is 721.19 sq. m. The proposed site plan provides 729.38 sq. m. of green area, exceeding the requirement and complying with applicable planning standards.
9Tree Planting
The project provides 32 evergreen trees on the open area of 2884.79 sq. m, exceeding the required 29 trees. The includes 12 Cassia Fistula (5 m spacing) and 20 Delonix Regia, ensuring compliance with regulatory standards and enhancing site aesthetics.
10Design For Electric Supply Including Street Lighting
The electrical supply system is designed to ensure reliable and efficient power distribution throughout the premises. Power from the utility source is received through an HT metering system, which shall be in the scope of the State Electricity Board, and stepped down through 2 Nos. transformers of 1600 kVA capacity each. The LT supply shall be distributed through LT cables from the LT panel to the meter boards, from the meter boards to each floor, and further from the meter boards to individuals tenants, through appropriately rated cables, panels, and protection devices. Provision is made for backup power through DG sets of capacity 1 No. 2250 kVA and 1 No. 1010 kVA, ensuring uninterrupted power supply to essential and critical loads. Street lighting is integrated into the electrical network, using energy-efficient LED fixtures with timer - or sensor-based controls to ensure proper illumination of roads and pathways while optimizing energy consumption.
11Community Buildings
NA
12Treatment and Disposal System of Sewage and Sullage water
In Sewage Treatment Plants (STP) of 240 KLD capacity , the wastewater undergoes primary, secondary, and tertiary treatment processes to remove solids, organic matter and impurities. The treated water is then reused for non-potable applications such as flushing, gardening, and landscaping, while excess treated water is safely discharged as per regulatory norms. Sludge generated from the treatment process is dewatered and disposed of in an environmentally safe manner. The System ensures hygienic handling, effective treatment, and sustainable reuse of wastewater.
13Solid Waste Management And Disposal System
Solid waste generated from residential and commercial areas is segregated at the source into biodegradable and non-biodegradable waste. Biodegradable waste is collected and sent for composting or processing through an organic waste converter, with the facility provided over an area of 30 sq.m, producing manure for landscaping use. Recyclable waste is handed over to authorized recyclers, while non-recyclable inert waste is transported to a municipal disposal facility as per local regulations. The system ensures proper collection, segregation, storage, and environmentally safe disposal of all types of solid waste, promoting hygiene, sustainability, and compliance with waste management guidelines.
14Water Conservation System
The water conservation system incorporates measures to reduce water consumption and promote sustainable use of resources. Low- flow fixtures, dual-flush toilets, and efficient plumbing fittings are used to minimize water wastage. Rainwater harvesting (RWH) systems of 40 cum capacity collect and store runoff from roofs and open areas for groundwater recharge or non- potable use. Treated wastewater from the STP is reused for flushing, gardening, and landscaping, reducing dependence on freshwater sources. These measures collectively ensure efficient water management and long-term conservation of water resources.
15Energy Management System Including Use of Renewable Energy
The energy management system is designed to ensure efficient use, monitoring and control of electrical energy within the premises. Energy-efficient equipment, LED lighting, and smart controls are implemented to reduce overall power consumption. Renewable energy sources, particularly rooftop solar photovoltaic (PV) systems, are integrated to supplement the grid supply and lower dependence on conventional power. As part of the sustainability measures, 20 percent of the total external pole lighting is proposed to be powered through solar lighting systems, and solar PV module panels equivalent to 1 percent of the total demand load are provided. The system includes energy meters and monitoring tools to track usage, identify inefficiencies, and optimize performance. Overall, the design promotes sustainability, reduces operating costs, and supports clean energy utilization.
16Fire Protection And Fire Safety System
The fire protection and safety system is designed to ensure early detection, quick response, and effective control of fire emergencies. A fully automatic addressable fire alarm will be provided, comprising smoke detectors, heat detectors, and manual call points connected to a central fire alarm panel. Firefighting systems consist of fire hydrants (79Nos.), hose reels, sprinkler systems, and portable fire extinguishers placed at strategic locations. supported by a fire water tank of 350 KL capacity to ensure adequate water supply during emergencies. Emergency exits, illuminated signages, and fire-rated doors facilitate safe evacuation. The system complies with relevant fire safety norms and ensures adequate protection of life and property through prevention, detection, suppression, and safe evacuation measures.
17Social Infrastructure And Other Public Amenities Including Public Health Services
The project includes open areas/plaza, internal roads, footpaths, street lighting, utility services, and provisions for public health services in accordance with applicable norms.
18Emergency Evacuation Services
Emergency evacuation services are designed to ensure the safe and timely exit of occupants during emergencies such as fire, earthquake, or other hazards. All staircases shall be used as fire staircases in case of fire. The system includes well-marked and illuminated emergency exits, evacuation routes, staircases, and assembly points. Public address systems and alarm signals provide guidance and instructions during an emergency. One fire hydrant shall be provided in each Fire Hose cabinet (FHC). Sprinkler systems are provided for fire protection, with upper floors designed at a coverage of 12 sq. mt. per sprinkler and basements at a coverage of 9 sq. mt. per sprinkler. Regular drills and training programs are conducted to familiarize occupants with evacuation procedures. The service ensures organized, efficient, and safe evacuation, minimizing risk to life and facilitating emergency response operations.
19Other Miscellaneous Work
The project includes a guard room, signage, and other necessary works for proper functioning. A centralized addressable fire alarm system will be provided, signage will be illuminated as per NBC, and centralized CCTV monitoring form the CCTV room will ensure security and surveillance of the premises.
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 7 Jan 2031.

Sanctioned by Greater Noida Authority · 4,800 sqm of land · an approved plan of 1 block and 693 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
PLG/BP SM-30-SEPT-2025.262548 Jan 20267 Jan 20317 Jan 20367 Jan 2031
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

24 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
Plot No. C-5, Sector Delta-1, Greater Noida, Gautam Buddha Nagar, Uttar Pradesh, PIN-2013104800Plot
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Lease deed · Lease Deed No. 23477
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Allotment letter from the authority · Allotment Letter No.5585
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Allotment letter from the authority · Possession Letter No. Comm/2025/931
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Allotment letter from the authority · Affidavit for Land Dues No Escrow in Separate Bank Account
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Allotment letter from the authority · Letter with Affidavit Land Dues GNIDA
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Allotment letter from the authority · Affidavit for Land Dues Installment Kaveri City Centre-2
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Document checklist
DocumentStatusUploaded
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
not reported—
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
not reported—
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
not reported—
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
not reported—
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
not reported—
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
not reported—
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New19 Jan 2026 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New17 Feb 2026 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New13 Feb 2026 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New19 Jan 2026 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New19 Jan 2026 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New19 Jan 2026 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New19 Jan 2026 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New19 Jan 2026 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New19 Jan 2026 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New17 Feb 2026 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New19 Jan 2026 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New19 Jan 2026 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New17 Feb 2026 ↗
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
New7 Mar 2026 ↗

Quarterly progress reports

3 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

3 quarterly progress reports are on file with UPRERA, covering 2025-Q4 to 2026-Q2.

QuarterConstructionCertificates
2025-Q40%CA ↗ · Arch ↗ · Eng ↗
2026-Q14%CA ↗ · Arch ↗ · Eng ↗
2026-Q2—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameKAVERI ELITE INFRA DEVELOPERS PRIVATE LIMITED
RolePromoter · current
RERA IDUPRERAPRM438673
PANAALCK7964M
CIN / TANMRTK08727F
Name of chairmanGirish Kumar Goel
Registered addressRegd. Office - E-40, 1st Floor, UPSIDC, Site-IV, Kasna indu Area, I.A. Surajpur, Noida, Gautam Buddha Nagar, Uttar Pradesh, PIN-201306
RERA contact
Registered since2026
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Gautam Budh Nagar

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
Kaveri Elite Infra Developers Pvt. Ltd. Collection A/c for Kaveri City Centre-2BankICICI Bank Ltd.BranchGreater Noida Delta OneBranch addressShop No. 1,2,3,4, Kaveri City Centre, Plot No. C-6, Delta 1, Greater Noida, Gautam Buddha Nagar, Uttar Pradesh, PIN-201308Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCICIC0007056Branch emailvirendra.singh1@icicibank.com
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
Kaveri Elite Infra Developers Pvt. Ltd. Separate Bank A/c for Kaveri City Centre-2BankICICI Bank Ltd.BranchGreater Noida Delta OneBranch addressShop No. 1,2,3,4, Kaveri City Centre , Plot No. C-6, Delta 1, Greater Noida, Gautam Buddha Nagar, Uttar Pradesh, PIN-201308Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCICIC0007056
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
Kaveri Elite Infra Developers Pvt. Ltd. RERA Transaction A/c for Kaveri City Centre-2BankICICI Bank Ltd.BranchGreater Noida Delta OneBranch addressShop No. 1,2,3,4, Kaveri City Centre , Plot No. C-6, Delta 1, Greater Noida, Gautam Buddha Nagar, Uttar Pradesh, PIN-201308Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCICIC0007056
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

1 movement

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Quarterly progress report
2026-Q2
QPR 2026-Q2
newly filed with RERA
18 Oct 2026
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about Kaveri City Centre-2

Is Kaveri City Centre-2 RERA registered?

Yes. Kaveri City Centre-2 is registered with UPRERA under registration number UPRERAPRJ360269, registered on 20 Mar 2026. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for Kaveri City Centre-2?

The completion date filed with UPRERA is 7 Jan 2031. No completion certificate is on record yet.

Who is the builder of Kaveri City Centre-2?

KAVERI ELITE INFRA DEVELOPERS PRIVATE LIMITED is the promoter entity that filed Kaveri City Centre-2 with UPRERA (promoter RERA ID UPRERAPRM438673). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does Kaveri City Centre-2 have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Kaveri City Centre-2 located?

Kaveri City Centre-2 is registered in Sector Delta-1, Greater Noida, Gautam Budh Nagar, as filed with UPRERA.

What configurations are available in Kaveri City Centre-2?

The unit plan filed with UPRERA lists SHOP, OTHER and STUDIO. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in Kaveri City Centre-2?

The approved unit plan filed with UPRERA runs from 5 to 245 m² of carpet area (about 58 to 2,634 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in Kaveri City Centre-2?

The approved unit plan describes 1 block and 693 units of which 430 are homes and 263 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is Kaveri City Centre-2?

About 584 units per acre: 693 planned units across 1.19 acres (4,800 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗