KDMG CENTRAL PLAZA

UPRERARegistered

KDMG CENTRAL PLAZA is a RERA-registered commercial project by ANALOX TOWN PLANNERS PRIVATE LIMITED in SITE-C RESIDENTIAL POCKET, NEAR TILPATA CHOWK, GREATER NOIDA WEST,, Gautam Budh Nagar (RERA ID UPRERAPRJ205557). Registered with a completion deadline of 31 Aug 2028.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ205557
Project categoryCommercial
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryAny Other Competent Authority
Proposed start1 Nov 2025
Project duration34 months
AddressPLOT NO. X, KHASRA NO. 48, TRILOKPURAM GREENS,, SITE-C RESIDENTIAL POCKET, NEAR TILPATA CHOWK, GREATER NOIDA WEST,, Gautam Buddha Nagar, Gautam Budh Nagar
TehsilGautam Buddha Nagar
Applicant typeCompany
Applicant addressOffice no. 30, Balaji Complex, D-248A/10, Laxmi Nagar, East Delhi, East Delhi, East Delhi, Delhi, India, 110092.
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  2. Building permit sanctioned

    599/ZI.PAN.GAU./2025-26 / REV NO. 609/26

  3. Registered with RERA

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered6 Apr 2026
Original completion31 Aug 2028
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹24,000
Sanctioning authorityAny Other Competent Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors94 · 1 · 5 (units from plan)
Homes · commercial units36 · 58 (shops and offices filed in the same plan)
  • SHOP58 62%
  • STUDIO36 38%
ConfigurationUnitsCarpet area
SHOP5819
STUDIO3626
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
KDMG CENTRAL PLAZA · SHOP, STUDIO59419-26
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
D P ASSOCIATES
License CA/2014/63100
D-201, BLUEMOON HOMES, 2ND FLOOR, RAJ NAGAR EXTENSION, GHAZIABAD
Engineer
KEEN ASSOCIATES PRIVATE LIMITED
H-53, 1ST FLOOR, SECTOR-63, NOIDA
Contractor
ANALOX TOWN PLANNERS PRIVATE LIMITED
KHASRA NO. 55, TRILOKPURAM GREENS, NEAR TILPATA CHOWK, GREATER NOIDA WEST, G B NAGAR
Sr.Development work declared to RERA
1Demarcation of Plots
Demarcated the Complex having Plot area of 1379.59 Sq. Mtr. at Plot No. X, Trilokpuram Greens in Greater Noida, Gautam Budh Nagar, Uttar Pradesh.
2Boundary Wall
Well-defined plot boumndaries proposed to ensure the security and privacy of the project. Development of the boundary wall (230 mm thickness of Brick Wall with minimum height of as per building Bye-Laws or design)
3Road Work
RCC Roads (Reinforced concrete having a minimum 200 mm thickness as designed) or Paver-roads.
4Footpaths
Development of pathways for smooth pedestrian movement. Use of 60 mm to 80 mm thick pavers or heavy duty tiles as per the design.
5Water Supply Including Drinking Water Facilities
Installation of water supply systems to ensure a steady and safe domestic water supply, including provisions for landscape water requirements. Use of HDPE pipe / UPVC and CPVC /GI pipe 15 mm to 80 mm as per the design requirements. Numbers of water connection 2 Nos. Tank capacity 10 KLD.
6Sewer System
Development of a Sewerage System to collect wastewater generated within the project premises including treatment and disposal of wastewater / sewage. Use of pipe having dia. of 150-200 mm with adwquate numbers of inspection chambers and Man-Holes based upon the design and site requirements. Length of sewer lines 120 mt. Concrete materials used in construction of pipes, netqork design as per drawing. (Annexure with Sewerage layout plan, step 11.16).
7Drain
Development of drainage system within the site to manage surface water and storm water flow. In the drainage system of the project, use of pipe having dia. of 200 mm and above and open drains with adequate numbers of inspection chambers and man-holes based upon the design and site requirements. Also using SN pipes of various grades as per the design. (Annexure with drainage layout plan).
8Parks
Development of landscape areas including green / open spaces / recreational area / Tot-lots. Plantation of shrubs besides planting natural grass and various water bodies, landscape features etc. as per the design. Use of Electrical poles haivng height of 4M in landscape areas.
9Tree Planting
Planting 379 Trees of various types based uopn the prevailing building regulations; predominantly alosng the boundary wall of the project as hown in the site plan. (Annexure with area chart).
10Design For Electric Supply Including Street Lighting
Installation of Transformer capacity of 500KVA, including street lighting, basement lighting etc. to ensure adequate illumination and safety at all the project common areas. Use of 4 M to 6 M height electrical poles, as per design and site requirements with LED lights, Number of Electricals Poles 10-15 Nos.
11Community Buildings
NA
12Treatment and Disposal System of Sewage and Sullage water
Provisions has been made for the installation of 30 KLD STP to treat the sewage generated from the project and dispose of the surplus wastewater into the Municipal sewer line.
13Solid Waste Management And Disposal System
NA
14Water Conservation System
Rainwater harvesting for optimum use of rain water.
15Energy Management System Including Use of Renewable Energy
Use of high efficiency low energy consuming LED lights.
16Fire Protection And Fire Safety System
As per the fire drawings approved the Fire Department installation of fire protection systems and safety measures to prevent and mitigate fire hazards as specified in the NBC-2016. Horizontal Riser of 100 mm or as per the design calculation, Vertical Riser of 100 mm or as per the design calculaiton. All above with fire alarm and other safety measure as per requirement as per building Bye-Laws or design.
17Social Infrastructure And Other Public Amenities Including Public Health Services
An emergency Evacuation Plan has been detailed out in the Environment Management Plan (EMP) in the EIA od the project which would be implemented with signage before completion of the project.
18Emergency Evacuation Services
An emergency Evacuation Plan has been detailed out in the Environment Mangement Plan (EMP) of the project which would be implemented with signage before completion of the project.
19Other Miscellaneous Work
As per the prevailing design / requirements including provisions for earthquake design structures, Handicapped Friendly and CCTV units as required in Building Design as per building Bye-Laws.
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 18 Sept 2028.

Sanctioned by Any Other Competent Authority · 1,380 sqm of land · an approved plan of 1 block and 94 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
599/ZI.PAN.GAU./2025-26 / REV NO. 609/2621 Jan 202618 Sept 202818 Sept 203031 Aug 2028
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
no file published
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

22 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
481380Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · 33368
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Khatauni extract · 1427-1432 (01-07-2019 to 30-06-2025)
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Allotment letter from the authority · RTI Answer UPSIDA - Ref No. 1025/UPSIDA/V. PRA. (CIV) /S. D. -II
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
not reported—
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
not reported—
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
not reported—
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New17 Dec 2025 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New25 Oct 2025 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New17 Dec 2025 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New17 Dec 2025 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New24 Oct 2025 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New24 Oct 2025 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New24 Oct 2025 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New24 Oct 2025 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New30 Dec 2025 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New18 Nov 2025 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New17 Dec 2025 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New14 Nov 2025 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New25 Dec 2025 ↗
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
New25 Dec 2025 ↗

Quarterly progress reports

1 filed report

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

1 quarterly progress report is on file with UPRERA, for 2026-Q1.

QuarterConstructionCertificates
2026-Q18.12%CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameANALOX TOWN PLANNERS PRIVATE LIMITED
RolePromoter · current
RERA IDUPRERAPRM356888
PANAAMCA6220F
CIN / TANU70100DL2014PTC265610
Name of chairmanPARVEEN KUMAR SINGHAL
Registered addressOffice no. 30, Balaji Complex, D-248A/10, Laxmi Nagar, East Delhi, East Delhi, East Delhi, Delhi, India, 110092.
RERA contact
Registered since2025
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Gautam Budh Nagar

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
ATPPL COLL AC FOR KDMG CENTRAL PLAZABankYES BANK LTDBranchKASNA, GREATER NOIDABranch addressGNS PLAZA, SITE-4, KASNA, GREATER NOIDABranch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCYESB0000133Branch emailJAY.PANDIT@YESBANK.IN
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
ATPPL SEPARATE BANK ACCOUNT FOR KDMG CENTRAL PLAZABankYES BANK LTDBranchKASNA, GREATER NOIDABranch addressGNS PLAZA, SITE-4, KASNA, GREATER NOIDABranch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCYESB0000133
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
ATPPL RERA TRANSACTION ACCOUNT FOR KDMG CENTRAL PLAZABankYES BANK LTDBranchKASNA, GREATER NOIDABranch addressGNS PLAZA, SITE-4, KASNA, GREATER NOIDABranch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCYESB0000133
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about KDMG CENTRAL PLAZA

Is KDMG CENTRAL PLAZA RERA registered?

Yes. KDMG CENTRAL PLAZA is registered with UPRERA under registration number UPRERAPRJ205557, registered on 6 Apr 2026. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for KDMG CENTRAL PLAZA?

The completion date filed with UPRERA is 31 Aug 2028. No completion certificate is on record yet.

Who is the builder of KDMG CENTRAL PLAZA?

ANALOX TOWN PLANNERS PRIVATE LIMITED is the promoter entity that filed KDMG CENTRAL PLAZA with UPRERA (promoter RERA ID UPRERAPRM356888). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does KDMG CENTRAL PLAZA have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is KDMG CENTRAL PLAZA located?

KDMG CENTRAL PLAZA is registered in SITE-C RESIDENTIAL POCKET, NEAR TILPATA CHOWK, GREATER NOIDA WEST,, Gautam Budh Nagar, as filed with UPRERA.

What configurations are available in KDMG CENTRAL PLAZA?

The unit plan filed with UPRERA lists SHOP and STUDIO. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in KDMG CENTRAL PLAZA?

The approved unit plan filed with UPRERA runs from 19 to 26 m² of carpet area (about 205 to 282 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in KDMG CENTRAL PLAZA?

The approved unit plan describes 1 block and 94 units of which 36 are homes and 58 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is KDMG CENTRAL PLAZA?

About 276 units per acre: 94 planned units across 0.34 acres (1,380 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗