MIGSUN GREEN MANSION is a RERA-registered residential project by MAHALUXMI BUILDTECH LIMITED in Gautam Budh Nagar (RERA ID UPRERAPRJ9784). Registered with a completion deadline of 31 Dec 2017.
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ9784 |
| Project category | Residential |
| Registration type | Ongoing |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Greater Noida Authority |
| Proposed start | 23 Jul 2014 |
| Original start | 13 Aug 2013 |
| Project duration | 42 months |
| Address | Gautam Buddha Nagar, Gautam Budh Nagar |
| Tehsil | Gautam Buddha Nagar |
| Applicant type | Company |
| Applicant address | C1/C2, MAHALUXMI METRO TOWER, SECTOR 4, VAISHALI, GHAZIABAD. |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Building permit sanctioned
149-151/SIDC/ATP
Registered with RERA
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
Completion certificate filed
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 12 Aug 2017 |
| Original completion | 31 Dec 2017 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 1 Sept 2025 |
| Registration fee | ₹63,000 |
| Sanctioning authority | Greater Noida Authority |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
| Configuration | Units | Carpet area |
|---|---|---|
| 2 BHK | — | 41-72 |
| 3 BHK | — | 68-72 |
| 1 BHK | — | 48 |
| SHOP | — | 15-36 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| A · SHOP, 2 BHK, OTHER | 23 | — | 15-57 |
| B · 2 BHK, 3 BHK, 1 BHK, OTHER | 20 | — | 48-72 |
| C · 2 BHK, 3 BHK, OTHER | 19 | — | 46-68 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 22 Jul 2019.
Sanctioned by Greater Noida Authority · 11,586 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| 149-151/SIDC/ATP | 23 Jul 2014 | 22 Jul 2019 | 22 Jul 2019 | 31 Dec 2017 |
| Document | File |
|---|---|
| Project approval The approval the promoter filed as the basis for registering the project. | PDF ↗ |
| Project approval The approval the promoter filed as the basis for registering the project. | PDF ↗ |
| Project approval The approval the promoter filed as the basis for registering the project. | PDF ↗ |
| Project approval The approval the promoter filed as the basis for registering the project. | PDF ↗ |
| Project approval The approval the promoter filed as the basis for registering the project. | PDF ↗ |
| Sanctioned layout plan The approved layout of the whole site: where the towers, roads and open areas sit on the plot. | PDF ↗ |
Land & documents
2 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| HRA-14 | 11586 | — |
1 registry or lease-deed filing is on this project’s record with UPRERA, dated 24 Jan 2012.
| Registry no. | Date | Type | Area |
|---|---|---|---|
| Bahi No. 1, Jild No. 10215, Page No 277-758, Seria | 24 Jan 2012 | self | — |
| Lease deed · 10215 The deed by which a development authority leased the land to the promoter, with the term and the conditions on it. | PDF ↗ |
| Lease deed · 10215 The deed by which a development authority leased the land to the promoter, with the term and the conditions on it. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | New | 19 Mar 2019 ↗ |
Facilities
as declared to RERA
Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.
| Drinking water | YES |
| Fire safety (as filed with RERA) | YES |
| Health service | FIRST AID KIT |
| Renewable energy | NO |
| Other facilities | YES |
The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | MAHALUXMI BUILDTECH LIMITED |
| Role | Promoter · current |
| RERA ID | UPRERAPRM18214 |
| PAN | AADCM7320H |
| CIN / TAN | U15494DL1989PLC034507 |
| Name of chairman | Mr. Sunil Miglani |
| Registered address | C1/C2, MAHALUXMI METRO TOWER, SECTOR 4, VAISHALI, GHAZIABAD. |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Gautam Budh Nagar
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| Bank account as filed | Mahalaxmi Buildtech LimitedBankAXIS BANKBranchVAISHALI BRANCHA/C no.IFSCUTIB0000715 |
What has changed on this record
4 movements
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Promoter’s complaints tally (all their projects) | 82 (Under Registration - 1 ) → 82 (Under Registration - 0 ) changed in Estanzo’s record | 3 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 82 (Under Registration - 2 ) → 82 (Under Registration - 1 ) changed in Estanzo’s record | 29 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 81 (Under Registration - 1 ) → 82 (Under Registration - 2 ) changed in Estanzo’s record | 31 Aug 2026 |
| Promoter’s complaints tally (all their projects) | 81 (Under Registration - 2 ) → 81 (Under Registration - 1 ) changed in Estanzo’s record | 16 Aug 2026 |
| Promoter’s complaints tally (all their projects) | changed in Estanzo’s record · 3 Oct 2026 · 4 movements on record |
What to verify and what to ask
1 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No quarterly progress report is published for this project.Ask the promoter for the latest quarterly report filed and the construction percentage certified in it.
Common questions about MIGSUN GREEN MANSION
Is MIGSUN GREEN MANSION RERA registered?
Yes. MIGSUN GREEN MANSION is registered with UPRERA under registration number UPRERAPRJ9784, registered on 12 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.
Has MIGSUN GREEN MANSION been completed?
UPRERA still lists MIGSUN GREEN MANSION as Registered, so it is not shown as completed here. A completion certificate dated 1 Sept 2025 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.
Who is the builder of MIGSUN GREEN MANSION?
MAHALUXMI BUILDTECH LIMITED is the promoter entity that filed MIGSUN GREEN MANSION with UPRERA (promoter RERA ID UPRERAPRM18214). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does MIGSUN GREEN MANSION have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is MIGSUN GREEN MANSION located?
MIGSUN GREEN MANSION is registered in Gautam Budh Nagar, as filed with UPRERA.
What configurations are available in MIGSUN GREEN MANSION?
The unit plan filed with UPRERA lists 2 BHK, 3 BHK, 1 BHK, SHOP and OTHER. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in MIGSUN GREEN MANSION?
The approved unit plan filed with UPRERA runs from 15 to 72 m² of carpet area (about 164 to 770 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗