Kings Avenue is a RERA-registered residential project by ADHAR INFRA HOMES in Bareilly (RERA ID UPRERAPRJ848830). Registered with a completion deadline of 30 Jun 2026.
RERA status as reported: Registered.Construction progress
Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ848830 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Bareily Development Authority |
| Proposed start | 1 Apr 2023 |
| Project duration | 39 months |
| Address | Bareilly, Bareilly |
| Tehsil | Bareilly |
| Applicant type | Partnership Firm |
| Applicant address | H.No.97/98A Residency Gardens Stadium Road Bareilly(UP) 243001 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
PRD/PH/00953/BDA/LD/21-22/0370/04032022
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 10 May 2023 |
| Original completion | 30 Jun 2026 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹63,500 |
| Sanctioning authority | Bareily Development Authority |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots it defines property boundaries, parcel shapes. no. of residential plots under 100 sq mt area is 20, no. of residential plots between 100-150 sqmt. area is 27, no of residential plots between 200-250 sqmt is 3.and no. of commercial plots is 11 |
| 2 | Boundary Wall 0.23 m thick boundary wall upto 3.00m high with 16 ratio and both side plaster with 15 ratio will be constructed. |
| 3 | Road Work stone ballast with compaction soiling coat 40 mm to 63 mm, 6mm to 100 mm thick coat of stone grit and sand including compaction and laying concrete slab 10 cm thick with 124 ratio. |
| 4 | Footpaths footpath will be provided in park A. Concrete paver block will be used for pavement bollard lights will be provided along the footpath in Park A |
| 5 | Water Supply Including Drinking Water Facilities Under ground water tank of capacity 30 KLD will be provided. Pump House will be provided for efficient supply of water to overhead water tank situated on terrace top of each residence. |
| 6 | Sewer System under ground sewerage system will be provided to connect each residence towards the STP located in Park B STP of 30 KLD will bee provided and an outflow line will be connected to external sewer line on the front road. |
| 7 | Drain Covered drain along the road will be provided. Concrete cover blocks will be used to cover the drain. |
| 8 | Parks concrete blocks will be used for external boundary, park level will be 0.30 meter high from internal road level and various amenities will be provided such as open air theatre. children play area, fountain open gym, Gazebo and badminton court. |
| 9 | Tree Planting Palm trees will be provided along the road , Box hedges will be provided along the footpath in Park A. Hibiscus trees and trabulars pals will be planted at various locations in Park A and Park B. Carpet grass of Type 3 will be planted along with marigold and petunia flower bed. |
| 10 | Design For Electric Supply Including Street Lighting we will provide underground electric supply for houses. street lights will be provided along the road with 1 street light placed between 2 corresponding units. transformers of 800 KVA will be provided. |
| 11 | Community Buildings nil |
| 12 | Treatment and Disposal System of Sewage and Sullage water STP of capacity 30KLD will be provided near park B. Drain outlet from the STP will be connected to the external sewer line on the front road. treated water will also be used for landscaping |
| 13 | Solid Waste Management And Disposal System we will provide garbage collection area separately in park B |
| 14 | Water Conservation System rain water harvesting pit will be provided in PARK A and PArk B. Underground recharge pits will be provided to conserve collected water |
| 15 | Energy Management System Including Use of Renewable Energy NIL |
| 16 | Fire Protection And Fire Safety System NIL |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services NIL |
| 18 | Emergency Evacuation Services NIL |
| 19 | Other Miscellaneous Work NIL |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 19 Jul 2027.
Sanctioned by Bareily Development Authority · 11,441.28 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| PRD/PH/00953/BDA/LD/21-22/0370/04032022 | 20 Jul 2022 | 19 Jul 2027 | 18 Jul 2030 | 30 Jun 2026 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | no file published |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
Land & documents
18 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 506P | 464 | Khasra |
| 506P | 2116 | Khasra |
| 506P | 1290 | Khasra |
| 507 | 7740 | Khasra |
| Sale deed · 34 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 35 The registered deed by which the promoter bought the land. | PDF ↗ |
| Khatauni extract · 1427-1432 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1427-1432 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Registry document · 217 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Khatauni extract · ... An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 4 May 2023 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 20 Apr 2023 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 20 Apr 2023 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 20 Apr 2023 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 20 Apr 2023 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 20 Apr 2023 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 20 Apr 2023 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 20 Apr 2023 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 4 May 2023 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 4 May 2023 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 20 Apr 2023 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 20 Apr 2023 ↗ |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | New | 20 Apr 2023 ↗ |
Quarterly progress reports
13 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
13 quarterly progress reports are on file with UPRERA, covering 2023-Q1 to 2026-Q2.
| Quarter | Construction | Certificates |
|---|---|---|
| 2023-Q1 | — | Arch ↗ |
| 2023-Q3 | — | Arch ↗ |
| 2023-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | — | Arch ↗ · Eng ↗ |
| 2024-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q2 | 67% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q3 | 67% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q4 | 100% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q1 | 100% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | ADHAR INFRA HOMES |
| Role | Promoter · current |
| RERA ID | UPRERAPRM210228 |
| PAN | ABWFA8873A |
| CIN / TAN | LKNA17852C |
| Registered address | H.No.97/98A Residency Gardens Stadium Road Bareilly(UP) 243001 |
| RERA contact | |
| Registered since | 2022 |
| Legal name | HARI SHANKAR AGARWAL |
| Role | Co-promoter |
| Applicant type | Individual |
| Address | 129 Awas vikas civil lines bareilly 243001 UP |
| RERA contact |
| Legal name | RAJESH KUMAR AGARWAL HUF |
| Role | Co-promoter |
| Applicant type | Individual |
| Address | 129 avas vikas Civil Lines Bareilly 243001 UP |
| RERA contact |
| Legal name | VINAYAK AGARWAL |
| Role | Co-promoter |
| Applicant type | Individual |
| Address | 129 awas vikas civil lines , bareilly 243001 UP |
| RERA contact |
| Legal name | RAGINI AGARWAL |
| Role | Co-promoter |
| Applicant type | Individual |
| Address | 129 AWAS VIKAS CIVIL LINES BAREILLY 243001 UP |
| RERA contact |
| Legal name | MANJU RANI |
| Role | Co-promoter |
| Applicant type | Individual |
| Address | 129 AWAS VIKAS CIVIL LINES BAREILLY UP 243001 |
| RERA contact |
| Legal name | GENDAN LAL |
| Role | Co-promoter |
| Applicant type | Individual |
| Address | 179 VILLAGE MOHANPUR URF RAMNAGAR, BAREILLY UP 243006 |
| RERA contact |
| Legal name | AADHAR INFRACRAFT PRIVATE LIMITED |
| Role | Co-promoter |
| Applicant type | Company |
| Address | 672, janakpuri, Rajendra Nagar Bareilly, UP 243122 |
| RERA contact |
| Legal name | PREM SHANKAR |
| Role | Co-promoter |
| Applicant type | Individual |
| Address | village mohanpur urf ramnagar bareill up 243006 |
| RERA contact |
| Legal name | HITENDRA KUMAR |
| Role | Co-promoter |
| Applicant type | Individual |
| Address | village mohanpur urf ramnagar, bareilly UP 243006 |
| RERA contact |
| Legal name | VIJENDRA PAL |
| Role | Co-promoter |
| Applicant type | Individual |
| Address | VILLAGE MOHANPUR URF RAMNAGAR, BAREILLY 243006 UP |
| RERA contact |
| Legal name | NAND RAM |
| Role | Co-promoter |
| Applicant type | Individual |
| Address | village mohanpur urf ramnagar, bareilly 243006 UP |
| RERA contact |
| Legal name | MANOHAR LAL |
| Role | Co-promoter |
| Applicant type | Individual |
| Address | village mohanpur urf ramnagar , bareilly 243006 UP |
| RERA contact |
| Legal name | SOMVATI |
| Role | Co-promoter |
| Applicant type | Individual |
| Address | 114 , VILLAGE MOHANPUR URF RAMNAGAR, R K UNIVERSITY BAREILLY 243006 UP |
| RERA contact |
| Legal name | DESH RAJ |
| Role | Co-promoter |
| Applicant type | Individual |
| Address | 176 village mohanpur urfRamnagar, bareily UP 243006 |
| RERA contact |
Nearby projects
Bareilly
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | Adhar Infra Homes Collection A/c for Kings AvenueBankBank Of IndiaBranchNew Bareilly BranchBranch addressPilibhit Bypass Road Adjacent to Leaf Petrol Pump, Mahanagar Bareilly 243001UPBranch districtBareilly, Uttar PradeshA/C no.IFSCBKID0007841 |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | Adhar Infra Homes Separate Bank A/c For Kings AvenueBankBank Of IndiaBranchNew Bareilly BranchBranch addressPilibhit Bypass road, Adjacent to Leaf petrol Pump Mahanagar Bareilly 243001 UPBranch districtBareilly, Uttar PradeshA/C no.IFSCBKID0007841 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | Adhar Infra Homes RERA Transaction account for Kings AvenueBankBank Of IndiaBranchNew Bareilly BranchBranch addressPilibhit Bypass road, adjacent to Leaf petrol pump Mahanagar Bareilly 243001 UPBranch districtBareilly, Uttar PradeshA/C no.IFSCBKID0007841 |
What has changed on this record
1 movement
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Quarterly progress report 2026-Q2 | QPR 2026-Q2 newly filed with RERA | 19 Oct 2026 |
What to verify and what to ask
2 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about Kings Avenue
Is Kings Avenue RERA registered?
Yes. Kings Avenue is registered with UPRERA under registration number UPRERAPRJ848830, registered on 10 May 2023. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for Kings Avenue?
The completion date filed with UPRERA is 30 Jun 2026. No completion certificate is on record yet.
Who is the builder of Kings Avenue?
ADHAR INFRA HOMES is the promoter entity that filed Kings Avenue with UPRERA (promoter RERA ID UPRERAPRM210228). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does Kings Avenue have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is Kings Avenue located?
Kings Avenue is registered in Bareilly, as filed with UPRERA.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗