KRISHNA VAAS 2 is a RERA-registered residential project by MATRABHOOMI INFRABUILD PRIVATE LIMITED in Agra (RERA ID UPRERAPRJ356865). Registered with a completion deadline of 30 Jun 2026.
RERA status as reported: Registered.Construction progress
Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ356865 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Agra Development Authority |
| Proposed start | 1 Apr 2022 |
| Project duration | 51 months |
| Address | Agra, Agra |
| Tehsil | Agra |
| Applicant type | Company |
| Applicant address | 3rd Floor, F-360, Kamla Nagar, Agra. 282005 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
00422/ADA/LD/20-21/0417/17112020
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion certificate filed
Completion certificate filed
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 3 Jun 2022 |
| Original completion | 30 Jun 2026 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 15 Jan 2024 |
| Registration fee | ₹24,500 |
| Sanctioning authority | Agra Development Authority |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots DEMARKATION OF PLOT WILL BE DONE AS PER APPROVED MAP |
| 2 | Boundary Wall SIX TO EIGHT FEET WALL WILL BE CONSTRUCTED OF 9 INCHES THICK BRICK WORK OF 5 FEET HEIGHT |
| 3 | Road Work CONSTRUCTION OF ROAD WIRH 15 CM THICK LAYER OF G.S.B. AND ALSO INCLUDING FIRST COAT PAINTING AFTER W.B.M. SURFACE, 2 CM THICK PREMIXING CARPET WITH SEAL COAL AS PER SPECIFICATIONS. |
| 4 | Footpaths FOOTPATH WILL BE LAID AT ALL DESIRED LOCATIONS |
| 5 | Water Supply Including Drinking Water Facilities SUPPLY AND LAYING OF 80MM DIA G.I PIPE ISI MARK INCLUDING OF FITTING LABOUR MATERIAL T AND P ETC. REQUIRED OF PROPER COMPLETION OF WORK AS DIRECTED BY ENGINEER INCHARGE.
FIXING OF SUBMERSIBLE PUMP AND BORING OF TUBE WELL 10MM . SIZE ETC. ALL COMPLETE AS DIRECTED BY ENGINEER INCHARGE.
CONSTRUCTION OF UNDER GROUND WATER TANK INCLUDING ALL COMPLETE AS PER DESIGN. |
| 6 | Sewer System SUPPLY , LAYING AND JOINTING 600MM DIA TO 100MM DIA NP-3 HUME PIPE IN PROPER SLOP AND ALIGNMENT AS PER SPECIFICATION AND DIRECTION OF E/I REQUIRED FOR PROPER COMPLETION OF WORK.
CONSTRUCTION OF INSPECTION CHAMBER OF SIZE 1.00M x 1.20M x 1.50M DEEP IN
1;4 CEMENT AND SAND MORTAR INCLUDING RCC SLAB MS, MAINHOLE COVER, FOOTREST ETC. |
| 7 | Drain CONSTRUCTION OF U TYPE K.C. A AND B TYPE DRAIN WITH BASE CONCRETE, BRICK WORK , 4C SAND , PLASTER AND C.C ALL COMPLETE. AS PER DETAILS DESIGN AND SPECIFICATION APPROVED BY E/I ETC. |
| 8 | Parks CONSTRUCTION OF PARK INCLUDING OF EARTH WORK IN EXCAVATION FOUNDATION STONE BALLAST IN 1;4;8 IN FOUNDATION BRICK WORK IN 1;4 CEMENT C/SAND MORTAR IN SUPERSTRUCTURE , PLASTER , C.C FIXING OF GRILLS ETC. ALL COMPLETE AS PER DIRECTION E/I.
SUPPLY AND FIXING OF GATE WITH RCC. |
| 9 | Tree Planting TREE PLANTATION INCLUDING TREE GUARD MAINTENANCE ETC. |
| 10 | Design For Electric Supply Including Street Lighting SUPPLY AND FIXING OF ELECTRIC POLES WITH CONDUCTORS AS PER SPECIFICATION OF UPSEB ETC. ALL COMPLETE REQUIRED FOR PROPER COMPLETION OF THE WORK AS PER DIRECTION OF E/I OR AS PER NORMS OF D.V.V.N.L / TORRENT POWER LTD |
| 11 | Community Buildings NOT APPLICABLE |
| 12 | Treatment and Disposal System of Sewage and Sullage water SUPPLY , LAYING AND JOINTING 600MM DIA TO 100MM DIA NP-3 HUME PIPE IN PROPER SLOP AND ALIGNMENT AS PER SPECIFICATION AND DIRECTION OF E/I REQUIRED FOR PROPER COMPLETION OF WORK. |
| 13 | Solid Waste Management And Disposal System CONSTRUCTION OF DALAV GHAR AS PER DETAIL DESIGN AND SPECIFICATION APPROVED BY ADA ETC. ALL COMPLETE INCLUDING SUPPLY ALL MATERIAL LABOUR AND T AND P. |
| 14 | Water Conservation System RAIN WATER HARVESTING SYSTEM |
| 15 | Energy Management System Including Use of Renewable Energy NOT APPLICABLE |
| 16 | Fire Protection And Fire Safety System NOT APPLICABLE |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services NOT APPLICABLE |
| 18 | Emergency Evacuation Services NOT APPLICABLE |
| 19 | Other Miscellaneous Work AS PER REQUIREMENTS |
Registered agents
1 agent
Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.
| Sr. | Agent | RERA registration |
|---|---|---|
| 1 | MANISH GULATI | UPRERAAGT18918 |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 16 Jul 2026.
Sanctioned by Agra Development Authority · 3,880 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| 00422/ADA/LD/20-21/0417/17112020 | 17 Jul 2021 | 16 Jul 2026 | 16 Jul 2029 | 30 Jun 2026 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
Land & documents
21 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 1509 | 1158 | Khasra |
| 1509 | 1158 | Khasra |
| 1509 | 1158 | Khasra |
| 1641 | 406.61 | Khasra |
| Registry document · 1699 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 1444 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 1445 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 62 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | not reported | — |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | not reported | — |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 10 May 2022 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 12 Apr 2022 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 12 Apr 2022 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 12 Apr 2022 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 12 Apr 2022 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 12 Apr 2022 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 20 May 2022 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 12 Apr 2022 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 10 May 2022 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 12 Apr 2022 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 12 Apr 2022 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 12 Apr 2022 ↗ |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | New | 10 May 2022 ↗ |
Quarterly progress reports
15 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
15 quarterly progress reports are on file with UPRERA, covering 2022-Q1 to 2025-Q3.
| Quarter | Construction | Certificates |
|---|---|---|
| 2022-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | 100% | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q4 | 100% | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | 100% | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | 100% | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | 100% | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q4 | 100% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q1 | 100% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q2 | 100% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q3 | 100% | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | MATRABHOOMI INFRABUILD PRIVATE LIMITED |
| Role | Promoter · current |
| RERA ID | UPRERAPRM150610 |
| PAN | AAICM3437E |
| CIN / TAN | U45400UP2012PTC054273 |
| Name of chairman | SHIVANG AGARWAL |
| Registered address | 3rd Floor, F-360, Kamla Nagar, Agra. 282005 |
| RERA contact | |
| Registered since | 2021 |
Nearby projects
Agra
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | MATRABHOOMI INFRABUILD PRIVATE LIMITED COLLOCETION ACCOUNT FOR KRISHNA VAAS 2BankIDBI BANK LTDBranchSANJAY PLACE AGRABranch addressPADAMDEEP TOWER SANJAY PLACE AGRABranch districtAgra, Uttar PradeshA/C no.IFSCIBKL0000080 |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | MATRABHOOMI INFRABUILD PRIVATE LIMITED SEPARATE ACCOUNT FOR KRISHNA VAAS 2BankIDBI BANK LTD.BranchSANJAY PLACE AGRABranch addressPADAMDEEP TOWER SANJAY PLACE AGRABranch districtAgra, Uttar PradeshA/C no.IFSCIBKL0000080 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | MATRABHOOMI INFRABUILD PRIVATE LIMITED TRANSACTION ACCOUNT FOR KRISHNA VAAS 2BankIDBI BANK LTD.BranchSANJAY PLACE AGRABranch addressPADAMDEEP TOWER SANJAY PLACE AGRABranch districtAgra, Uttar PradeshA/C no.IFSCIBKL0000080 |
What has changed on this record
nothing recorded yet
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.What to verify and what to ask
2 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about KRISHNA VAAS 2
Is KRISHNA VAAS 2 RERA registered?
Yes. KRISHNA VAAS 2 is registered with UPRERA under registration number UPRERAPRJ356865, registered on 3 Jun 2022. Estanzo reproduces that filing; it does not verify the work behind it.
Has KRISHNA VAAS 2 been completed?
UPRERA still lists KRISHNA VAAS 2 as Registered, so it is not shown as completed here. A completion certificate dated 15 Jan 2024 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.
Who is the builder of KRISHNA VAAS 2?
MATRABHOOMI INFRABUILD PRIVATE LIMITED is the promoter entity that filed KRISHNA VAAS 2 with UPRERA (promoter RERA ID UPRERAPRM150610). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does KRISHNA VAAS 2 have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is KRISHNA VAAS 2 located?
KRISHNA VAAS 2 is registered in Agra, as filed with UPRERA.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗