KRISHNA WORLD is a RERA-registered residential project by PRASANDI BUILDERS PRIVATE LIMITED in Meerut (RERA ID UPRERAPRJ7211). Registered with a completion deadline of 30 Jun 2022. UP-RERA flags this project "Default on QPR": it has not filed its mandatory quarterly progress report(s).
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ7211 |
| Project category | Residential |
| Registration type | Ongoing |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Meerut Development Authority |
| Proposed start | 2 May 2016 |
| Original start | 20 Apr 2016 |
| Project duration | 74 months |
| Address | Meerut, Meerut |
| Tehsil | Meerut |
| Applicant type | Company |
| Applicant address | OPPOSITE APPEX COLLEGE, VED VYAS PURI NH-58, DELHI-DEHRADUN BYE PASS ROAD, Meerut, MEERUT, Uttar Pradesh, India, 250103 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
7/15
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
- valid to
Permit revalidated
7/15
- to
Extension granted
“Six months extension in view of force majeure caused by covid-19 pandemic”
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 4 Aug 2017 |
| Original completion | 31 Dec 2021 |
| Revised completion | 30 Jun 2022 |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹2,14,000 |
| Sanctioning authority | Meerut Development Authority |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots ALREADY SHOWN ON APPROVED BY MDA |
| 2 | Boundary Wall PARTLY DONE AS PER PLAN |
| 3 | Road Work 65% COMPLETED |
| 4 | Footpaths NOT APPLICABLE |
| 5 | Water Supply Including Drinking Water Facilities IN CAMPUS OVER HEAD WATER TANK |
| 6 | Sewer System FULLY COMPLETED |
| 7 | Drain 20% COMPLETED |
| 8 | Parks FULLY DEVELOPED |
| 9 | Tree Planting 90% DEVELOPED |
| 10 | Design For Electric Supply Including Street Lighting AS PER APPROVED PLAN |
| 11 | Community Buildings NOT APPLICABLE |
| 12 | Treatment and Disposal System of Sewage and Sullage water PROPOSED AS PER APPROVED PLAN |
| 13 | Solid Waste Management And Disposal System PROPOSED AS PER APPROVED PLAN |
| 14 | Water Conservation System PROPOSED WATER HARVESTING AS PER APPROVED PLAN |
| 15 | Energy Management System Including Use of Renewable Energy NOT APPLICABLE |
| 16 | Fire Protection And Fire Safety System NOT APPLICABLE |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services NOT APPLICABLE |
| 18 | Emergency Evacuation Services NOT APPLICABLE |
| 19 | Other Miscellaneous Work SHALL BE DONE AS PER APPROVED PLAN |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 17 Apr 2021. It carries a revalidation, valid to 17 Apr 2023.
Sanctioned by Meerut Development Authority · 41,775 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | RevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossary | Documents filed |
|---|---|---|---|---|---|---|
| 7/15 | 18 Apr 2016 | 17 Apr 2021 | 17 Apr 2023 | 31 Dec 2021 | 18 Apr 2018 valid to 17 Apr 2023 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | no file published |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
UPRERA’s record carries 1 completion extension for this project, running to 30 Jun 2022.
| # | Granted from | Extended upto | Note |
|---|---|---|---|
| 1 | 31 Dec 2021 | 30 Jun 2022 | Six months extension in view of force majeure caused by covid-19 pandemic |
Land & documents
16 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 159 | 391.13 | — |
| 161 | 8193.85 | — |
| 293/2 & 293/3 | 33190 | — |
8 registry or lease-deed filings are on this project’s record with UPRERA, the earliest dated 15 Dec 2006.
| Registry no. | Date | Type | Area |
|---|---|---|---|
| 1837 | 19 Feb 2007 | self | — |
| 1925 | 21 Feb 2007 | self | — |
| 13319 | 15 Dec 2006 | self | — |
| 13317 | 15 Dec 2006 | self | — |
| 13313 | 15 Dec 2006 | self | — |
| 1837 | 19 Feb 2007 | self | — |
| 13520 | 20 Dec 2006 | self | — |
| 6228 | 20 Dec 2006 | self | — |
| Registry document · 1837 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 1925 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 13319 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 13317 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 13313 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 13520 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 6228 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | not reported | — |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | not reported | — |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | not reported | — |
| Water supply plan How the project proposed to supply water, as filed at registration. | not reported | — |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | not reported | — |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | not reported | — |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | not reported | — |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 31 Jul 2018 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 31 Jul 2018 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 31 Jul 2018 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 31 Jul 2018 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 31 Jul 2018 ↗ |
Facilities
as declared to RERA
Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.
| Drinking water | IN CAMPUS OVER HEAD WATER TANK SUPPLY |
| Fire safety (as filed with RERA) | AS PAR APPROVED PLAN |
The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | PRASANDI BUILDERS PRIVATE LIMITED |
| Role | Promoter · current |
| RERA ID | UPRERAPRM14405 |
| PAN | AAACP8262G |
| CIN / TAN | U85110UP1995PTC018706 |
| Name of chairman | SURAJ YADAV |
| Registered address | OPPOSITE APPEX COLLEGE, VED VYAS PURI NH-58, DELHI-DEHRADUN BYE PASS ROAD, Meerut, MEERUT, Uttar Pradesh, India, 250103 |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Meerut
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| Bank account as filed | PRASANDI BUILDERS PRIVATE LIMITEDBankPunjab National BankBranchABU LANE MEERUTA/C no.IFSCPUNB0031800 |
What has changed on this record
nothing recorded yet
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.What to verify and what to ask
2 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No quarterly progress report is published for this project.Ask the promoter for the latest quarterly report filed and the construction percentage certified in it.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
Common questions about KRISHNA WORLD
Is KRISHNA WORLD RERA registered?
Yes. KRISHNA WORLD is registered with UPRERA under registration number UPRERAPRJ7211, registered on 4 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for KRISHNA WORLD?
The completion date filed with UPRERA is 30 Jun 2022. No completion certificate is on record yet.
Who is the builder of KRISHNA WORLD?
PRASANDI BUILDERS PRIVATE LIMITED is the promoter entity that filed KRISHNA WORLD with UPRERA (promoter RERA ID UPRERAPRM14405). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Why does KRISHNA WORLD show "default on QPR"?
UPRERA flags this project as in default on quarterly progress reporting - the promoter has not filed one or more mandatory quarterly progress reports. The flag is the authority's, not Estanzo's.
Has UPRERA granted KRISHNA WORLD more time to complete?
UPRERA's record carries 1 completion extension for KRISHNA WORLD, the latest running to 30 Jun 2022. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.
Does KRISHNA WORLD have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is KRISHNA WORLD located?
KRISHNA WORLD is registered in Meerut, as filed with UPRERA.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗