La Residentia

UPRERARegistered

La Residentia is a RERA-registered residential project by LA RESIDENTIA DEVELOPERS PRIVATE LIMITED in Gautam Budh Nagar (RERA ID UPRERAPRJ9357). Registered with a completion deadline of 30 Jun 2023. UP-RERA flags this project "Default on QPR": it has not filed its mandatory quarterly progress report(s).

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ9357
Project categoryResidential
Registration typeOngoing
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryGreater Noida Authority
Proposed start15 Mar 2013
Original start15 Apr 2011
Project duration124 months
AddressGautam Buddha Nagar, Gautam Budh Nagar
TehsilGautam Buddha Nagar
Applicant typeCompany
Applicant address1. PANKAJ JAIN House No. - 195, Second Floor, Ram Vihar, Delhi - 110092 2. SANJEEV KUMAR A-44, 4t
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    2541/OPA No 2336

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. valid to

    Permit revalidated

    PLG/(BP)-2541/44/FTS-8718

  4. Registered with RERA

  5. to

    Extension granted

  6. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  7. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly reports are in default on this project’s record.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered11 Aug 2017
Original completion15 Jun 2019
Revised completion30 Jun 2023
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹4,05,500
Sanctioning authorityGreater Noida Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors2,388 · 27 · 25 (units from plan)
  • 2 BHK1,056 44%
  • 3 BHK1,056 44%
  • 4 BHK276 12%
ConfigurationUnitsCarpet area
4 BHK276119-119
2 BHK1,05649-56
3 BHK1,05663-94
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
TOWER 1 · OTHER, 4 BHK2592119
TOWER 11 · OTHER, 2 BHK259249-54
TOWER 15 · OTHER, 2 BHK217649-54
TOWER 19 · OTHER, 3 BHK217663
TOWER 20 · OTHER, 2 BHK259249-54
TOWER 21 · OTHER, 3 BHK259285-94
TOWER 22 · OTHER, 2 BHK259249-54
TOWER 23 · OTHER, 3 BHK259285-94
TOWER 24 · OTHER, 2 BHK259249-54
TOWER 25 · OTHER, 3 BHK259276
TOWER 26 · OTHER, 3 BHK259263
TOWER 27 · OTHER, 2 BHK259249-54
TOWER 28 · OTHER, 2 BHK259256
TOWER 29 · OTHER, 3 BHK259263
TOWER 30 · OTHER, 3 BHK259263
TOWER 31 · OTHER, 2 BHK259256
TOWER 32 · OTHER, 2 BHK259249-54
TOWER 33 · OTHER, 2 BHK217654
TOWER 34 · OTHER, 3 BHK238485-94
TOWER 35 · OTHER, 2 BHK217649-54
TOWER 36 · OTHER, 3 BHK259285-94
TOWER 37 · OTHER, 3 BHK217676
TOWER 38 · OTHER, 3 BHK238476
TOWER 39 · OTHER, 4 BHK2592119
TOWER 4 · OTHER, 2 BHK259256
TOWER 7 · OTHER, 4 BHK2592119
TOWER 9 · OTHER, 3 BHK249285-94
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.The plan also files 4,119.38 m² for a 4 BHK, 6,308 m² for a 3 BHK, far outside the rest of that type, so the ranges above leave them out.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
NATIONAL ARCHITECTS & ENGINEERS
License CA/92/15179
14, OLD NAVYUG MARKET, GHAZIABAD - 201001
Engineer
MANISH CONSULTANT
C8/1 ARDEE CITY, GURGAON - 12002
Sr.Development work declared to RERA
1Demarcation of Plots
Properly Demarcated
2Boundary Wall
A combination of RCC,Brick wall and railing
3Road Work
It will be provided
4Footpaths
Footpaths are provided
5Water Supply Including Drinking Water Facilities
Water treatment plant is there for portable water
6Sewer System
Sewer line are provided with requisite slope and manholes
7Drain
Catch basins and manholes
8Parks
It will be provided
9Tree Planting
Green area Provided
10Design For Electric Supply Including Street Lighting
It will be provided
11Community Buildings
Yes, there will be community building
12Treatment and Disposal System of Sewage and Sullage water
As per authority norms
13Solid Waste Management And Disposal System
As per authority norms
14Water Conservation System
Rain water harvesting pits
15Energy Management System Including Use of Renewable Energy
It will be provided
16Fire Protection And Fire Safety System
Fire sprinklers, smoke detectors, FHC with pumps provided
17Social Infrastructure And Other Public Amenities Including Public Health Services
It will be provided
18Emergency Evacuation Services
Fire staircase in each tower
19Other Miscellaneous Work
Kids play area, swimming pool etc
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 2 Feb 2013. It carries a revalidation, valid to 17 Nov 2019.

Sanctioned by Greater Noida Authority · 80,027 sqm of land · an approved plan of 27 blocks and 2388 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endRevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossaryDocuments filed
2541/OPA No 233614 Mar 20112 Feb 201317 Nov 201915 Jun 201918 Nov 2014
valid to 17 Nov 2019
as PLG/(BP)-2541/44/FTS-8718
Plans and approvals filed with RERA
DocumentFile
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 1 completion extension for this project, running to 30 Jun 2023.

#Granted fromExtended uptoNote
115 Jun 201930 Jun 2023—

Land & documents

34 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
GH-06A,TECHZONE IV, Greater Noida80027Plot
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Lease deed · 1775,Book number 01
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Document checklist
DocumentStatusUploaded
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
not reported—
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
not reported—
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
not reported—
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
not reported—
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
not reported—
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New6 Jul 2018 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New6 Jul 2018 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New6 Jul 2018 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New6 Jul 2018 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New6 Jul 2018 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New6 Jul 2018 ↗
Agreement for other land
The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title.
Old11 Aug 2017 ↗
Agreement for other land
The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title.
Old11 Aug 2017 ↗
Agreement for other land
The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title.
Old11 Aug 2017 ↗
Agreement for other land
The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title.
Old11 Aug 2017 ↗
Agreement for other land
The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title.
Old11 Aug 2017 ↗
Agreement for other land
The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title.
Old11 Aug 2017 ↗
Agreement for other land
The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title.
Old11 Aug 2017 ↗
Agreement for other land
The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title.
Old11 Aug 2017 ↗
Agreement for other land
The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title.
Old11 Aug 2017 ↗
Agreement for other land
The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title.
Old11 Aug 2017 ↗
Agreement for other land
The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title.
Old11 Aug 2017 ↗
Agreement for other land
The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title.
Old11 Aug 2017 ↗
Agreement for other land
The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title.
Old11 Aug 2017 ↗
Agreement for other land
The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title.
Old11 Aug 2017 ↗
Agreement for other land
The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title.
Old11 Aug 2017 ↗
Agreement for other land
The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title.
Old11 Aug 2017 ↗
Agreement for other land
The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title.
Old11 Aug 2017 ↗
Agreement for other land
The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title.
Old11 Aug 2017 ↗
Agreement for other land
The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title.
Old11 Aug 2017 ↗
Agreement for other land
The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title.
Old11 Aug 2017 ↗
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
Old11 Aug 2017 ↗

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameLA RESIDENTIA DEVELOPERS PRIVATE LIMITED
RolePromoter · current
RERA IDUPRERAPRM2706
PANAABCL8841Q
CIN / TANU70200DL2010PTC208933
Name of chairman1. PANKAJ JAIN 2. SANJEEV KUMAR 3. MUKESH KUMAR
Registered address1. PANKAJ JAIN House No. - 195, Second Floor, Ram Vihar, Delhi - 110092 2. SANJEEV KUMAR A-44, 4t
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Gautam Budh Nagar

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
ESCROWBankTHE KARUR VYSYA BANK LIMITEDBranchSECTOR-18, NOIDAA/C no.IFSCKVBL0004401
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

3 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)218 (Under Registration - 0 ) → 219 (Under Registration - 1 )
changed in Estanzo’s record
29 Sept 2026
Promoter’s complaints tally (all their projects)218 (Under Registration - 1 ) → 218 (Under Registration - 0 )
changed in Estanzo’s record
23 Sept 2026
Promoter’s complaints tally (all their projects)217 (Under Registration - 0 ) → 218 (Under Registration - 1 )
changed in Estanzo’s record
3 Sept 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 29 Sept 2026 · 3 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

2 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No quarterly progress report is published for this project.Ask the promoter for the latest quarterly report filed and the construction percentage certified in it.
  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about La Residentia

Is La Residentia RERA registered?

Yes. La Residentia is registered with UPRERA under registration number UPRERAPRJ9357, registered on 11 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for La Residentia?

The completion date filed with UPRERA is 30 Jun 2023. No completion certificate is on record yet.

Who is the builder of La Residentia?

LA RESIDENTIA DEVELOPERS PRIVATE LIMITED is the promoter entity that filed La Residentia with UPRERA (promoter RERA ID UPRERAPRM2706). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Why does La Residentia show "default on QPR"?

UPRERA flags this project as in default on quarterly progress reporting - the promoter has not filed one or more mandatory quarterly progress reports. The flag is the authority's, not Estanzo's.

Has UPRERA granted La Residentia more time to complete?

UPRERA's record carries 1 completion extension for La Residentia, the latest running to 30 Jun 2023. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does La Residentia have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is La Residentia located?

La Residentia is registered in Gautam Budh Nagar, as filed with UPRERA.

What configurations are available in La Residentia?

The unit plan filed with UPRERA lists OTHER, 4 BHK, 2 BHK and 3 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in La Residentia?

The approved unit plan filed with UPRERA runs from 49 to 119 m² of carpet area (about 525 to 1,285 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in La Residentia?

The approved unit plan describes 27 blocks and 2,388 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is La Residentia?

About 121 units per acre: 2,388 planned units across 19.78 acres (80,027 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗