Lakeview Apartment is a RERA-registered residential project by Lucknow Development Authority in Gomti Nagar, Lucknow (RERA ID UPRERAPRJ963704). Registered with a completion deadline of 1 Jan 2031.
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ963704 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Lucknow Development Authority |
| Proposed start | 20 Feb 2026 |
| Project duration | 59 months |
| Address | Khasra No. 536,537,544,545,546,547,548,549,550 551A, 551B, 554A, 557,557A,555,556,542,543, 554V (GH-1 ,2) Viraj Khand Gomti Nagar, Gomti Nagar, Lucknow, Lucknow |
| Tehsil | Lucknow |
| Applicant type | Competent authority |
| Applicant address | Lucknow Development Authority, Vipin Khand, Gomti Nagar, Lucknow |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
Government Building/Group Housing/17960/LDA/BP/25-26/3370/02012026
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 21 Apr 2026 |
| Original completion | 1 Jan 2031 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹1,91,000 |
| Sanctioning authority | Lucknow Development Authority |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
- 3 BHK646 95%
- SHOP33 5%
| Configuration | Units | Carpet area |
|---|---|---|
| SHOP | 33 | 46-161 |
| 3 BHK | 646 | 134 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| Tower - A · SHOP, 3 BHK, OTHER | 21 | 284 | 46-134 |
| Tower - B · OTHER, SHOP, 3 BHK | 21 | 279 | 87-134 |
| Tower - C · SHOP, 3 BHK | 20 | 116 | 134-161 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots Plot is already demarcated. all the development and construction work will be done under the demarcated plot. |
| 2 | Boundary Wall Brick work boundary wall at the height of 2100 mm and 600 mm high MS grill. Length Of Boundary Wall is 875.42 metre |
| 3 | Road Work 6.00 M Wide Reinforcement Cement concrete pavement with vacuum dewatered concrete is proposed around the building as per sanctioned plan. |
| 4 | Footpaths A footpath with a PCC base, GSB 80 mm thick M-35 paver blocks, and kerb stone edging shall be provided as per the drawings. |
| 5 | Water Supply Including Drinking Water Facilities The water supply system for the building shall be designed to ensure reliable, hygienic, and adequate water availability for fire protection as well as domestic use.
Source & Storage:
• The primary source of water shall be a bore well (The development is provided with a comprehensive water supply system comprising 3 no. borewells (2 working + 1 standby ,500 LPM and 75mtr. Head ).
• Water from the bore well shall be conveyed through suitable pipelines to the Underground Storage Tank (An underground water storage tank (UGT) of 825 KL).
• The UGT shall be compartmentalized into Fire Water Tank and Domestic Water Tank as per applicable norms.
Fire Water Priority:
• Water from the bore well shall first be filled into the Fire Water Tank (200kl) in the UGT to ensure uninterrupted fire-fighting water availability.
• Domestic water supply is maintained through hydro-pneumatic pumping systems with a flow rate of 875 LPM (2 working + 1 standby) at 90 m head, and flushing water is supplied through a separate hydro-pneumatic system with a flow rate of 450 LPM (2 working + 1 standby) at 90 m head.
• Additionally, an irrigation pump of capacity 780 LPM (approx.) is provided for horticulture requirements. The system ensures adequate supply of potable (drinking) water and efficient distribution as per NBC/CPWD norms.
• Water from the domestic section of the UGT shall be pumped using electrically operated pumps to the Overhead Tank (OHT).
• Overhead tanks (OHT) of 208 KL for domestic water and 104 KL for flushing water are provided for gravity-based distribution.
• The pumping system shall include necessary control valves, non-return valves, pressure gauges, and isolation valves.
• Adequate pump capacity shall be provided to maintain required pressure and flow.
Gravity Distribution:
• From the OHT, water shall be supplied through a gravity-based distribution system.
• Vertical risers and horizontal distribution pipelines shall be provided to supply water to all toilets, kitchens, and other domestic points across all floors.
System Design:
• The entire distribution network shall be designed to optimize flow rate, pressure, and water quality.
• All pipelines shall be of approved material and size, suitable for potable water.
• The system shall comply with relevant CPWD / NBC / Local Authority norms. |
| 6 | Sewer System A separate storm water drainage system with ground water recharge provision (A separate storm water drainage system with provision of 15 nos. rainwater harvesting pits shall be provided for groundwater recharge and efficient surface runoff management.) shall be provided for the site.
• Rainwater from terraces, roofs, paved areas, and open spaces shall be collected through a dedicated storm water drainage network.
• The collected storm water shall be conveyed through properly sized pipelines and drains to rainwater harvesting / ground water recharge structures.
• Adequate filter media and silt traps shall be provided before recharge to prevent choking and contamination.
• Excess storm water, after groundwater recharge, shall be safely discharged into the Municipal storm water drain line as per the approved layout and specified plan.
• The entire system shall be designed to prevent waterlogging and ensure efficient surface runoff management.
• The storm water drainage system shall comply with applicable NBC / CPWD / Local Authority guidelines
. |
| 7 | Drain A separate storm water drainage system with ground water recharge provision (rainwater harvesting) shall be provided for the site.
• Rainwater from terraces, roofs, paved areas, and open spaces shall be collected through a dedicated storm water drainage network.
• The collected storm water shall be conveyed through properly sized pipelines and drains to rainwater harvesting / ground water recharge structures.
• Adequate filter media and silt traps shall be provided before recharge to prevent choking and contamination.
• Excess storm water, after groundwater recharge, shall be safely discharged into the Municipal storm water drain line as per the approved layout and specified plan.
• The entire system shall be designed to prevent waterlogging and ensure efficient surface runoff management.
• The storm water drainage system shall comply with applicable NBC / CPWD / Local Authority guidelines. |
| 8 | Parks A green area of approx.= 7500 sqm (23%) area for the
purpose of recreational activities like jogging track,
children’s play area , gazebo sitting space, sports such as –
badminton court, basketball court etc |
| 9 | Tree Planting Many types of bushes and tree will be planted. Planted trees and bushes is the part of green area as per sanctioned
plan. |
| 10 | Design For Electric Supply Including Street Lighting Distribution Transformer 5.0 MVAX2 Nos., Compact Sub-Station 400KVA 11/0.433X13 Nos., 33/11KV HT Panel & 11/0.433KV HT Panel, 11KV RMU, Main Essential LT Panel, Main Block Panel, Essential Block Panel, Outdoor Feeder Pillar, and DG (750KVAX2 Nos.) backup for common services like external lighting and other essential area is proposed as per sanctioned plan, HSD Tank, HT/LT Cable line, Street Light & High Mast Light Poles Feeder pillar, Street lights, will be provided. As per site requirement manhole will be provided for the L.T., L.V., and H.T. lines. |
| 11 | Community Buildings There is a Club building proposed in our project with all required amenities. |
| 12 | Treatment and Disposal System of Sewage and Sullage water A comprehensive system shall be provided for the collection, treatment, and disposal of sewage and sullage water generated from the building.
• All sewage and sullage water from toilets, kitchens, wash areas, and other sanitary fixtures shall be collected through a separate sewerage network.
• The collected wastewater shall be conveyed through R.C.C. sewer lines laid at appropriate gradients to the proposed Sewage Treatment Plant (STP).
• The STP shall be designed to treat sewage to the prescribed standards as per CPCB / SPCB / Local Authority norms.
• Treated effluent from the STP shall be reused for flushing, landscaping, horticulture, and other non-potable purposes, as feasible.
• Excess treated water, if any, shall be safely discharged into the Municipal sewer / drain after meeting the prescribed discharge standards.
• Sludge generated from the STP shall be properly treated, dried, and disposed of through approved agencies.
• The entire treatment and disposal system shall be designed to prevent contamination, odor nuisance, and environmental pollution |
| 13 | Solid Waste Management And Disposal System A comprehensive system shall be provided for the collection, treatment, and disposal of sewage and sullage water generated from the building.
• All sewage and sullage water from toilets, kitchens, wash areas, and other sanitary fixtures shall be collected through a separate sewerage network.
• The collected wastewater shall be conveyed through R.C.C. sewer lines laid at appropriate gradients to the proposed Sewage Treatment Plant (STP) of 500KLD.
• The STP shall be designed to treat sewage to the prescribed standards as per CPCB / SPCB / Local Authority norms.
• Treated effluent from the STP shall be reused for flushing, landscaping, horticulture, and other non-potable purposes, as feasible.
• Excess treated water, if any, shall be safely discharged into the Municipal sewer / drain after meeting the prescribed discharge standards.
• Sludge generated from the STP shall be properly treated, dried, and disposed of through approved agencies.
• The entire treatment and disposal system shall be designed to prevent contamination, odor nuisance, and environmental pollution |
| 14 | Water Conservation System A comprehensive Water Conservation System shall be implemented to promote efficient use of water and minimize wastage within the premises.
• Low-flow and water-efficient plumbing fixtures such as dual flush WCs, aerated faucets, and sensor-based fixtures shall be provided to reduce water consumption.
• Rainwater harvesting and groundwater recharge systems shall be incorporated to utilize rainwater effectively.
• Treated wastewater from the STP shall be reused for flushing, landscaping, and other non-potable applications.
• Separate plumbing lines shall be provided for potable and recycled water to avoid cross-contamination.
• Water meters shall be installed at suitable locations to monitor and control water usage.
• The overall system shall be designed in compliance with NBC / CPWD / Local Authority guidelines and applicable water conservation norms. |
| 15 | Energy Management System Including Use of Renewable Energy We will use LED lights for energy management system and considering Roof Top Solar Power Plant in selective areas as per GRIHA requirement, will use EV Charger’s for 2 & 4 Wheelers. |
| 16 | Fire Protection And Fire Safety System A comprehensive Fire Protection and Fire Safety System shall be provided in the building to ensure early detection, effective fire control, and safe evacuation of occupants/residents.
• The fire protection system shall be designed and installed in accordance with NBC 2016, Part 4, DBR, and applicable Fire Department guidelines.
• An adequate and dedicated fire water storage shall be provided in the Underground Tank.
• A complete firefighting system comprising fire pumps (main pump, jockey pump, and standby pump), risers, down-comers, yard hydrants, landing valves, hose reels, and fire hose cabinets shall be provided as per fire norms.
• Automatic sprinkler system shall be provided in areas as required by fire regulations.
• Fire detection and alarm system including smoke detectors, heat detectors, manual call points, hooters, and fire alarm control panel shall be installed at appropriate locations.
• Portable fire extinguishers of suitable type and capacity shall be provided at all required locations.
• Fire pumps shall be provided with automatic operation and connected to emergency power backup.
• Proper means of escape, emergency lighting, exit signage, and fireman lift (where applicable) shall be provided to ensure safe evacuation.
• The entire system shall be tested, commissioned, and maintained as per Fire Authority requirements |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services Provision of community center, essential shops with
visitor’s parking (with handicap parking) etc |
| 18 | Emergency Evacuation Services The staircase will be provided with emergency exit doors in each floor as per fire department specifications. |
| 19 | Other Miscellaneous Work Swimming Pool & changing Rooms, Sub-Station, Gate With Guard Room, Retaining Wall, UG Tank (825 KLD), Hume Pipes. |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 1 Jan 2031.
Sanctioned by Lucknow Development Authority · 37,179 sqm of land · an approved plan of 3 blocks and 679 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| Government Building/Group Housing/17960/LDA/BP/25-26/3370/02012026 | 2 Jan 2026 | 1 Jan 2031 | 1 Jan 2034 | 1 Jan 2031 |
| Document | File |
|---|---|
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
Land & documents
41 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 536 | 2400 | Khasra |
| 537 | 1740 | Khasra |
| 544 | 1390 | Khasra |
| 545 | 2020 | Khasra |
| 546 | 1010 | Khasra |
| 547 | 1900 | Khasra |
| 548 | 1770 | Khasra |
| 549 | 2020 | Khasra |
| 550 | 190 | Khasra |
| 551A | 260 | Khasra |
| 551B | 1890 | Khasra |
| 554A | 710 | Khasra |
| 557A | 5560 | Khasra |
| 555 | 250 | Khasra |
| 556 | 2380 | Khasra |
| 542 | 3790 | Khasra |
| 543 | 760 | Khasra |
| 554V | 5010 | Khasra |
| 557 | 8090 | Khasra |
| Khatauni extract · GO An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1428-1432 (All Certified Khatauni) An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · Land Acquisition Order An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1428-1433 (Khasra no. 551A) An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · Letter for mutation For Khasra No. 556 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1428-1433 (Khasra no.550) An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · Nagar Nigam Letter An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1428-1433 (Khasra no. 551B) An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1428-1433 (Khasra 557A) An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | not reported | — |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Water supply plan How the project proposed to supply water, as filed at registration. | not reported | — |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | not reported | — |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | not reported | — |
| General body resolution The resolution authorising an apartment owners’ association to act as the registering entity. | not reported | — |
| Affidavit on balance development work The promoter’s sworn statement about the development work still to be finished. | not reported | — |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 17 Apr 2026 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 11 Mar 2026 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 11 Mar 2026 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 18 Mar 2026 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 18 Mar 2026 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 18 Mar 2026 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 30 Mar 2026 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 30 Mar 2026 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 16 Mar 2026 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 17 Apr 2026 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 18 Apr 2026 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 18 Apr 2026 ↗ |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | New | 18 Mar 2026 ↗ |
| Agreement for sale (proforma) The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind. | New | 18 Apr 2026 ↗ |
Quarterly progress reports
2 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
2 quarterly progress reports are on file with UPRERA, covering 2026-Q1 to 2026-Q2.
| Quarter | Construction | Certificates |
|---|---|---|
| 2026-Q1 | 0% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | Lucknow Development Authority |
| Role | Promoter · current |
| RERA ID | UPRERAPRM10102 |
| PAN | AAALL0016F |
| CIN / TAN | LKNL00280A |
| Registered address | Lucknow Development Authority, Vipin Khand, Gomti Nagar, Lucknow |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Lucknow
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | SECRETARY LDA COLLECTION ACCOUNT LAKEVIEW APARTMENTBankICICI Bank Ltd.BranchLucknow - Ashok MargBranch address28/10, Ashok Marg, Hazratganj LUCKNOW UTTAR PRADESH 226001Branch districtLucknow, Uttar PradeshA/C no.IFSCICIC0006281Branch emailvinesh.sondhiya@icicibank.com |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | SECRETARY LDA SEPARATE ACCOUNT LAKEVIEW APARTMENTBankICICI Bank Ltd.BranchLucknow - Ashok MargBranch address28/10, Ashok Marg, Hazratganj LUCKNOW UTTAR PRADESH 226001Branch districtLucknow, Uttar PradeshA/C no.IFSCICIC0006281 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | Secretary LDA RERA Transaction Account Lakeview ApartmentBankICICI Bank Ltd.BranchLucknow - Ashok MargBranch address28/10, Ashok Marg, Hazratganj LUCKNOW UTTAR PRADESH 226001Branch districtLucknow, Uttar PradeshA/C no.IFSCICIC0006281 |
What has changed on this record
9 movements
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Quarterly progress report 2026-Q2 | QPR 2026-Q2 newly filed with RERA | 15 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 584 (Under Registration - 5 ) → 584 (Under Registration - 4 ) changed in Estanzo’s record | 13 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 583 (Under Registration - 4 ) → 584 (Under Registration - 5 ) changed in Estanzo’s record | 21 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 583 (Under Registration - 5 ) → 583 (Under Registration - 4 ) changed in Estanzo’s record | 19 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 583 (Under Registration - 7 ) → 583 (Under Registration - 5 ) changed in Estanzo’s record | 9 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 582 (Under Registration - 7 ) → 583 (Under Registration - 7 ) changed in Estanzo’s record | 7 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 580 (Under Registration - 5 ) → 582 (Under Registration - 7 ) changed in Estanzo’s record | 31 Aug 2026 |
| Promoter’s complaints tally (all their projects) | 579 (Under Registration - 5 ) → 580 (Under Registration - 5 ) changed in Estanzo’s record | 23 Aug 2026 |
| Promoter’s complaints tally (all their projects) | 578 (Under Registration - 4 ) → 579 (Under Registration - 5 ) changed in Estanzo’s record | 16 Aug 2026 |
| Promoter’s complaints tally (all their projects) | changed in Estanzo’s record · 13 Oct 2026 · 8 movements on record |
What to verify and what to ask
1 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about Lakeview Apartment
Is Lakeview Apartment RERA registered?
Yes. Lakeview Apartment is registered with UPRERA under registration number UPRERAPRJ963704, registered on 21 Apr 2026. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for Lakeview Apartment?
The completion date filed with UPRERA is 1 Jan 2031. No completion certificate is on record yet.
Who is the builder of Lakeview Apartment?
Lucknow Development Authority is the promoter entity that filed Lakeview Apartment with UPRERA (promoter RERA ID UPRERAPRM10102). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does Lakeview Apartment have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is Lakeview Apartment located?
Lakeview Apartment is registered in Gomti Nagar, Lucknow, as filed with UPRERA.
What configurations are available in Lakeview Apartment?
The unit plan filed with UPRERA lists SHOP, 3 BHK and OTHER. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in Lakeview Apartment?
The approved unit plan filed with UPRERA runs from 46 to 161 m² of carpet area (about 493 to 1,730 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
How many towers and units are planned in Lakeview Apartment?
The approved unit plan describes 3 blocks and 679 units of which 646 are homes and 33 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is Lakeview Apartment?
About 74 units per acre: 679 planned units across 9.19 acres (37,179 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.