Vijay ORC

UPRERARegistered

Vijay ORC is a RERA-registered commercial project by SADHANA CITY HOMES PRIVATE LIMITED in Lucknow (RERA ID UPRERAPRJ13032). Registered with a completion deadline of 14 May 2021. UP-RERA flags this project "Default on QPR": it has not filed its mandatory quarterly progress report(s).

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ13032
Project categoryCommercial
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryLucknow Development Authority
Proposed start15 Nov 2017
Project duration42 months
AddressLucknow, Lucknow
TehsilLucknow
Applicant typeCompany
Applicant address2/268 VISHWAS KHAND GOMTI NAGAR LUCKNOW
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    41089

  2. Registered with RERA

  3. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  4. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  5. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  6. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly reports are in default on this project’s record.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered23 Sept 2017
Original completion15 Nov 2020
Revised completion14 May 2021
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹20,000
Sanctioning authorityLucknow Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors5 · 1 · 6 (units from plan)
Homes · commercial units2 · 3 (shops and offices filed in the same plan)
  • SHOP3 60%
  • OTHER2 40%
ConfigurationUnitsCarpet area
OTHER2203-381
SHOP3381
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
1 · OTHER, SHOP65203-381
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Repunjay Patel
License CA/2001/28562
D-2/122, Vibhuti Khand, Gomti Nagar, Lko.
Engineer
Anil Kumar Pandey
Vikas Nagar, Lucknow
Sr.Development work declared to RERA
1Demarcation of Plots
NA
2Boundary Wall
Boundary Wall work is completed.
3Road Work
NA
4Footpaths
NA
5Water Supply Including Drinking Water Facilities
Applied for water supply connection.
6Sewer System
Applied for sewer Connection.
7Drain
NA
8Parks
NA
9Tree Planting
NA
10Design For Electric Supply Including Street Lighting
NA
11Community Buildings
NA
12Treatment and Disposal System of Sewage and Sullage water
NA
13Solid Waste Management And Disposal System
NA
14Water Conservation System
Yet to start
15Energy Management System Including Use of Renewable Energy
NA
16Fire Protection And Fire Safety System
Yet to Start
17Social Infrastructure And Other Public Amenities Including Public Health Services
NA
18Emergency Evacuation Services
To be constructed along with the building.
19Other Miscellaneous Work
NA
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 27 Jan 2022.

Sanctioned by Lucknow Development Authority · 1,000 sqm of land · an approved plan of 1 block and 5 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
4108910 Feb 201727 Jan 202227 Jan 202315 Nov 2020
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
no file published
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 1 completion extension for this project, running to 14 May 2021.

#Granted fromExtended uptoNote
115 Nov 202014 May 2021Six months extension in view of force majeure caused by covid-19 pandemic

Land & documents

16 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
CP-21000—
CP21000Plot
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

1 registry or lease-deed filing is on this project’s record with UPRERA, dated 18 Aug 2005.

Registry no.DateTypeArea
760518 Aug 2005self—
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · 7605
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
not reported—
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
not reported—
Water supply plan
How the project proposed to supply water, as filed at registration.
not reported—
Electricity supply plan
How the project proposed to supply power, as filed at registration.
not reported—
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
not reported—
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
not reported—
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
not reported—
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New6 Jul 2018 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New6 Jul 2018 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New6 Jul 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old23 Sept 2017 ↗

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking waterAvailable
Fire safety (as filed with RERA)Approved
Health serviceNo
Renewable energyAvailable
Other facilitiesYes

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Quarterly progress reports

1 filed report

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

1 quarterly progress report is on file with UPRERA, for 2020-Q4.

QuarterConstructionCertificates
2020-Q4—Arch ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameSADHANA CITY HOMES PRIVATE LIMITED
RolePromoter · current
RERA IDUPRERAPRM24537
PANAAJCS0469F
CIN / TANU45201UP2005PTC029473
Name of chairmanAJAY RAJ AGARWAL
Registered address2/268 VISHWAS KHAND GOMTI NAGAR LUCKNOW
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Lucknow

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
Sadhana City Homes PVT LTDBankPUNJAB NATIONAL BANKBranchVIPUL KHAND, GOMTI NAGARA/C no.IFSCPUNB0448300
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

Common questions about Vijay ORC

Is Vijay ORC RERA registered?

Yes. Vijay ORC is registered with UPRERA under registration number UPRERAPRJ13032, registered on 23 Sept 2017. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for Vijay ORC?

The completion date filed with UPRERA is 14 May 2021. No completion certificate is on record yet.

Who is the builder of Vijay ORC?

SADHANA CITY HOMES PRIVATE LIMITED is the promoter entity that filed Vijay ORC with UPRERA (promoter RERA ID UPRERAPRM24537). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Why does Vijay ORC show "default on QPR"?

UPRERA flags this project as in default on quarterly progress reporting - the promoter has not filed one or more mandatory quarterly progress reports. The flag is the authority's, not Estanzo's.

Has UPRERA granted Vijay ORC more time to complete?

UPRERA's record carries 1 completion extension for Vijay ORC, the latest running to 14 May 2021. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does Vijay ORC have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Vijay ORC located?

Vijay ORC is registered in Lucknow, as filed with UPRERA.

What configurations are available in Vijay ORC?

The unit plan filed with UPRERA lists OTHER and SHOP. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in Vijay ORC?

The approved unit plan filed with UPRERA runs from 203 to 381 m² of carpet area (about 2,184 to 4,102 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in Vijay ORC?

The approved unit plan describes 1 block and 5 units of which 2 are homes and 3 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is Vijay ORC?

About 20 units per acre: 5 planned units across 0.25 acres (1,000 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗