Lifestyle Central

UPRERARegistered

Lifestyle Central is a RERA-registered commercial project by DTR DEVELOPERS LLP in Sector-Delta-2, Gautam Budh Nagar (RERA ID UPRERAPRJ307878). Registered with a completion deadline of 8 Apr 2031.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ307878
Project categoryCommercial
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryGreater Noida Authority
Proposed start1 Jun 2026
Project duration59 months
AddressPlot no. SLC-8/G/2, Sector-Delta-2, Greater Noida, Distt. Gautambudh Nagar, Uttar Pradesh, Sector-Delta-2, Dadri, Gautam Budh Nagar
TehsilDadri
Applicant typeLimited Liability Partnership (LLP)
Applicant addressK-415, SITE-5, KASNA INDUSTRIAL AREA, ALPHA, GREATER NOIDA, GAUTAMBUDH NAGAR, U.P-201310
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    PLG/BP/SM-09-Mar-2026;27650

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered8 Jul 2026
Original completion8 Apr 2031
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹34,000
Sanctioning authorityGreater Noida Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors232 · 1 · 21 (units from plan)
Homes · commercial units142 · 90 (shops and offices filed in the same plan)
  • STUDIO133 57%
  • SHOP90 39%
  • OTHER9 4%
ConfigurationUnitsCarpet area
OTHER99-209
SHOP909-82
STUDIO13322-36
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
Lifestyle Central · OTHER, SHOP, STUDIO212329-209
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Avnish Goel of Inarc Architects and Interiors
License COA/2017/88293
C-16/3, Site-4, Greater Noida, Distt. Gautambudh Nagar, U.P-201308
Engineer
Vivek Kumar Pankaj of Sushmna Consultancy Services LLP
Galaxy Vega Tech Zone-4, Greater Noida, U.P-201308
Contractor
Shree Associates
E-468, Beta-1, Greater Noida, Gautambudh Nagar, U.P.-201308
Sr.Development work declared to RERA
1Demarcation of Plots
PROPOSED COMMERCIAL PLOT LOCATED AT PLOT NO. SLC-8/G/2, SECTORDELTA-2, GREATER NOIDA, TOTAL PLOT AREA-2313.470 SQ. MTRS. NORTH WEST - PLOT NO.3, SOUTH EAST-PLOT NO.1, NORTH EAST-DELTA RESIDENTIAL, SOUTH WEST-ROAD
2Boundary Wall
ALL AROUND OF PLOT BOUNDARY WALL MADE OF RCC, BRICH WORK WITH MS RAILING AND GATES, SIDE BOUNDRY WALL OF 2000 MM HEIGHT AND FRONT BOUNDRY WALL OF 900 MM HIGH WITH 1200 MM HIGH MS RAILING
3Road Work
PROJECT LOCATED AT 60 METER WIDE MAIN ROAD AND INTERNAL ROAD 6 METER AND 4.5 METER WIDE, TOTAL PROPOSED WORK DEVELOPMENT WILL BE HAVING APPROX. ROAD AREA OF 760.31 SQ. MTRS. AND THE ROADS WILL BE MADE OF TREMIX CONCRETE AND PAVERS OVER WMM/WBM.
4Footpaths
PROJECT LOCATED AT 60 METER WIDE MIN ROAD AND INTERNAL ROAD 6 METER AND 4.5 METER WIDE, THE PROPOSED DEVELOPMENT WILL BE HAVING PAVERS, NATURAL STONES LIKE GRANITE/MARBLE AND TILES ON FOOTPATHS/ALONG SIDE ROADS AND THE TOTAL AREA WILL BE APPROX. 126 SQ. MTRS.
5Water Supply Including Drinking Water Facilities
WATER SUPPLY SHALL BE PROVIDED BY GNIDA WITH WTP OF ADEQUATE CAPACITY AS PER DESIGN TO CATER THE DAILY WATER REQUIREMENT OF APPROX. 60 KLD. DOM WATER TANK CAPACITY 25KL , RAW WATER TANK CAPACITY 25KL, AND PUMP ROOM LOCATED AT BASEMENT AREA AND 10KL TANK LOCATED AT TERRACE
6Sewer System
SEWERAGE AND SULLAGE WILL BE TREATED IN MULTISTAGE PROCESS AT STP OF 100 KLD CAPACITY WITH TANK SIZE 16.9M X 5.120 M LOCATED AT BASEMENT. THE PROCESS INCLUDES SCREENING AND GRIT REMOVAL, PRIMARLY SETTLING OF THE SOLIDS, BILOGICAL BREAKDOWN OF ORGANIC MATTERS AND DISINFECTION ALONG WITH ADVANCED FILTERATION TREATMENT. SLUDGE WILL BE SEPERATED AND DISPOSSED OFF OR REUSED, WHILE THE FINAL TREATED WATER (EFFULENT) WILL BE REUSED IN HORTICULTURE AND AC SYSTEM OR DISCHARGE. THE MBBR TECHNOLOGY WILL BE MOST APPROPRIASTE TO BE USED.
7Drain
OVERFLOW OF RAIN WATER HARVESTING PIT TO STORM WATER DRAIN OF GNIDA IS BEING PROPOSED. PEAK HOURLY DISCHARGE HAS BEEN TAKEN 42 CU METER. ONE NUMBER OF RAIN WATER HARVESTING PIT IS ALSO PROPOSED TO BE INSTALLED TO RECHARGE THE GROUND WATER.
8Parks
GREEN AREA IS BEING PROVIDED AS PER GNIDA NORMS. THE GREEN AREA REQUIRED AS TOTAL SITE AREA IS 347.155 SQ. MTRS. HOWEVER THE PROPOSED GREEN AREA IS 348.94 SQ. MTRS. APPROX. GREEN G1 AREA IS 158.88 MTRS. AND GREEN G2 AREA IS 190.06 SQ. MTRS.
9Tree Planting
EVERGREEN TREE PLANTING AS PER GNIDA NORMS. 14 NOS. TREES ARE REQUIRED AS PER THE DEVELOPMENT AUTHORITY NORMS. KEEPING THE COMMITMENT OF GREEN NOIDA , 14 NOS. OF EVERGREEN TREES ARE PROPOSED FOR BETTER AND DEVELOPED GREEN AREA. THE DETAILES OF TREES ARE MENTIONED IN THE ATTACHED LANDSCAPE PLAN.
10Design For Electric Supply Including Street Lighting
ELECTRICAL LOAD CALCULATED AS PER REQUIREMENT AND PREVAILING NORMS. STREET LIGHTNING WITH ENERGY SAVING LED STREET LIGHTS ARE PROPOSED. TOTAL ELECTRICAL IS 1310 KV WITH 0.90 POWER FACTOR. THE PROPOSED TRANSFORMER CAPACITY IS 1250 KVA WITH 0.85 LOADING. 2 NOS. 625 KVA AIR COOLED DG SETS IS ALSO PROPOSED 0.8 LOADING FACTOR.
11Community Buildings
NOT PROVIDED SINCE THE PROJECT IS COMMERCIAL PROJECT
12Treatment and Disposal System of Sewage and Sullage water
SEWAGE AND SULLAGE WILL BE TREATED IN A MULTISTAGE PROCESS AT STP WITH ADVANCED FILTERATION SYSTEM. SULLAGE IS SEPERATED AND WILL BE USED/DISPOSSED OFF, WHILE THE FINAL TREATED WATER WILL BE USED IN FLUSH IN, GARDENNING AND AC SYSTEM. SEPERATE KITCHEN WASTE LINE CONNECTED TO ETP THROUGH GREASSED TRAP.
13Solid Waste Management And Disposal System
SEPERATING WASTE INTO DIFFERENT CATEGORIES AT THE SOURCE TO FACILITATE REUSE, RECYCLING AS PER NORMS. THE REUSED WASTE WILL BE SENT FOR PROCESSING OR DISPOSAL SITES.
14Water Conservation System
TECHNIQUES AND TECHNOLOGIES TO MANAGE THE WATER RESOURCES EFFICIENTLY, AIMING TO REDUCE WASTE RAIN WATER HARVESTING, REDUCTION IN WASTAGE OF WATER BY USING LOW FLOW FIXTURES.
15Energy Management System Including Use of Renewable Energy
OPTIMIZEE ENERGY DISTRIBUTION SYSTEM TO REDUCE WASTAGE AND OVERALL ENERGY USAGE BY INSTALLING LOW ENERGY CONSUMING LIGHT FIXTURE ETC. INSTALL SOLAR PANELLS AND INSTALL HEAT EFFICIENT GLASS TO REDUCE HEAT.
16Fire Protection And Fire Safety System
COMBINATION OF STRATEGIES, EQUIPMENT AND PROTOCOLS DESIGNATED TO PREVENT, DETECT, CONTROL AND SUPRESS FIRE, ENSURING THE SAFETY OF PEOPLE AND PROPERTY, IT CONSISTS FIRE SAFETY SYSTEM-ACTIVE AND PASSIVE COMPONENTS. ACTIVE COMPONENTS SUCH AS FIRE ALARM, SPRINKLERS AND EXTENGUISHERS, WHILE PASSIVE ACTIVE SYSTEM LIKE FIRE RESISTANT MATERIAL, FIRE BARRIERS, CONTAIN AND LIMIT FIRE SPREAD. ALL INSTALLATION WILL AS PER NBC NORMS TO PREVENT THE FIRE INCIDENCE, EFFECTIVE FIRE DETECTION AND FIRE FIGHTING SYSTEM. TANK LOCATED AT BASEMENT WITH TANK 1 CAPACITY 100KL AND TANK 2 CAPACITY 100KL.
17Social Infrastructure And Other Public Amenities Including Public Health Services
PHYSICAL FACILITIES AND SERVICES THAT SUPPORT PUBLIC WELL BEING SUCH AS HANDICAPPED TOILET, PUBLIC TOILET, DRINKING WATER FACILITIES ETC. THE TOTAL NO. OF TOILETS ARE GIVEN AS PER STATUTORY REQUIREMENS.
18Emergency Evacuation Services
TO MOVE PEOPLE FROM A HIGH RISK LOCATION TO SAFE AREAS LIKE FIRE REFUGEE BALCONIES, FIRE ESCAPE STAIR CASE HAVE BEEN PROVIDED AS PER NBC NORMS. NINTH FLOOR REFUGEE TERRACE AREA=42.92 SQ. MTRS.
19Other Miscellaneous Work
NA
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 21 May 2031.

Sanctioned by Greater Noida Authority · 2,313 sqm of land · an approved plan of 1 block and 232 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
PLG/BP/SM-09-Mar-2026;2765022 May 202621 May 203121 May 20368 Apr 2031
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

19 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
SLC-8/G/2, SECTOR-DELTA-2, GREATER NOIDA, DISTT. GAUTAMBUDH NAGAR, U.P.2313.47Plot
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Lease deed · BAHI NO.1, ZILD NO. 48173, PAGE 281 TO 324, SR. NO. 38154 DATED 05.12.2025
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Registry document · As per Direction of Honble Authority passed in meeting held on 19.06.2026 Copy of affidavit clerfiyi
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
not reported—
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
not reported—
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New31 May 2026 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New30 Jun 2026 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New27 Jun 2026 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New31 May 2026 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New27 Jun 2026 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New27 Jun 2026 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New27 Jun 2026 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New27 Jun 2026 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New31 May 2026 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New2 Jun 2026 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New3 Jun 2026 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New3 Jun 2026 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New31 May 2026 ↗
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
New1 Jul 2026 ↗

Quarterly progress reports

1 filed report

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

1 quarterly progress report is on file with UPRERA, for 2026-Q1.

QuarterConstructionCertificates
2026-Q10.79%CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameDTR DEVELOPERS LLP
RolePromoter · current
RERA IDUPRERAPRM453432
PANAAYFD7120Q
CIN / TANMRTD10864A
Registered addressK-415, SITE-5, KASNA INDUSTRIAL AREA, ALPHA, GREATER NOIDA, GAUTAMBUDH NAGAR, U.P-201310
RERA contact
Registered since2026
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Gautam Budh Nagar

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
DTR DEVELOPERS LLP COLLECTION A/C FOR LIFESTYLE CENTRALBankICICI BANK LTD.BranchKASNA, GREATER NOIDABranch addressSHOP NO. 5 & 6, RAMDAS PAL MARKET, KHASRA NO. 691, 692, 694, MAIN ROAD, KASNA, GREATER NOIDA, GAUTAMBUDH NAGAR, UTTAR PRADESH-201308Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCICIC0007782Branch emailshimbhu.dayal@icici.bank.in
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
DTR DEVELOPERS LLP SEPARATE BANK A/C FOR LIFESTYLE CENTRALBankICICI BANK LTD.BranchKASNA, GREATER NOIDABranch addressSHOP NO. 5 AND 6, RAMDAS PAL MARKET, KHASRA NO. 691, 692 694, MAIN ROAD, KASNA, GREATER NOIDA, GAUTAMBUDH NAGAR, UTTAR PRADESH-201308Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCshimbhu.dayalicici.bank.in
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
DTR DEVELOPERS LLP RERA TRANSACTION A/C FOR LIFESTYLE CENTRALBankICICI BANK LTD.BranchKASNA, GREATER NOIDABranch addressSHOP NO. 5 AND 6, RAMDAS PAL MARKET, KHASRA NO. 691, 692, 694, MAIN ROAD, KASNA, GREATER NOIDA, GAUTAMBUDH NAGAR, UTTAR PRADESH-201308Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCICIC0007782
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about Lifestyle Central

Is Lifestyle Central RERA registered?

Yes. Lifestyle Central is registered with UPRERA under registration number UPRERAPRJ307878, registered on 8 Jul 2026. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for Lifestyle Central?

The completion date filed with UPRERA is 8 Apr 2031. No completion certificate is on record yet.

Who is the builder of Lifestyle Central?

DTR DEVELOPERS LLP is the promoter entity that filed Lifestyle Central with UPRERA (promoter RERA ID UPRERAPRM453432). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does Lifestyle Central have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Lifestyle Central located?

Lifestyle Central is registered in Sector-Delta-2, Gautam Budh Nagar, as filed with UPRERA.

What configurations are available in Lifestyle Central?

The unit plan filed with UPRERA lists OTHER, SHOP and STUDIO. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in Lifestyle Central?

The approved unit plan filed with UPRERA runs from 9 to 209 m² of carpet area (about 97 to 2,254 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in Lifestyle Central?

The approved unit plan describes 1 block and 232 units of which 142 are homes and 90 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is Lifestyle Central?

About 406 units per acre: 232 planned units across 0.57 acres (2,313 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗