Lifestyle Central is a RERA-registered commercial project by DTR DEVELOPERS LLP in Sector-Delta-2, Gautam Budh Nagar (RERA ID UPRERAPRJ307878). Registered with a completion deadline of 8 Apr 2031.
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ307878 |
| Project category | Commercial |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Greater Noida Authority |
| Proposed start | 1 Jun 2026 |
| Project duration | 59 months |
| Address | Plot no. SLC-8/G/2, Sector-Delta-2, Greater Noida, Distt. Gautambudh Nagar, Uttar Pradesh, Sector-Delta-2, Dadri, Gautam Budh Nagar |
| Tehsil | Dadri |
| Applicant type | Limited Liability Partnership (LLP) |
| Applicant address | K-415, SITE-5, KASNA INDUSTRIAL AREA, ALPHA, GREATER NOIDA, GAUTAMBUDH NAGAR, U.P-201310 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
PLG/BP/SM-09-Mar-2026;27650
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 8 Jul 2026 |
| Original completion | 8 Apr 2031 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹34,000 |
| Sanctioning authority | Greater Noida Authority |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
- STUDIO133 57%
- SHOP90 39%
- OTHER9 4%
| Configuration | Units | Carpet area |
|---|---|---|
| OTHER | 9 | 9-209 |
| SHOP | 90 | 9-82 |
| STUDIO | 133 | 22-36 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| Lifestyle Central · OTHER, SHOP, STUDIO | 21 | 232 | 9-209 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots PROPOSED COMMERCIAL PLOT LOCATED AT PLOT NO. SLC-8/G/2, SECTORDELTA-2, GREATER NOIDA, TOTAL PLOT AREA-2313.470 SQ. MTRS. NORTH WEST - PLOT NO.3, SOUTH EAST-PLOT NO.1, NORTH EAST-DELTA RESIDENTIAL, SOUTH WEST-ROAD |
| 2 | Boundary Wall ALL AROUND OF PLOT BOUNDARY WALL MADE OF RCC, BRICH WORK WITH MS RAILING AND GATES, SIDE BOUNDRY WALL OF 2000 MM HEIGHT AND FRONT BOUNDRY WALL OF 900 MM HIGH WITH 1200 MM HIGH MS RAILING |
| 3 | Road Work PROJECT LOCATED AT 60 METER WIDE MAIN ROAD AND INTERNAL ROAD 6 METER AND 4.5 METER WIDE, TOTAL PROPOSED WORK DEVELOPMENT WILL BE HAVING APPROX. ROAD AREA OF 760.31 SQ. MTRS. AND THE ROADS WILL BE MADE OF TREMIX CONCRETE AND PAVERS OVER WMM/WBM. |
| 4 | Footpaths PROJECT LOCATED AT 60 METER WIDE MIN ROAD AND INTERNAL ROAD 6 METER AND 4.5 METER WIDE, THE PROPOSED DEVELOPMENT WILL BE HAVING PAVERS, NATURAL STONES LIKE GRANITE/MARBLE AND TILES ON FOOTPATHS/ALONG SIDE ROADS AND THE TOTAL AREA WILL BE APPROX. 126 SQ. MTRS. |
| 5 | Water Supply Including Drinking Water Facilities WATER SUPPLY SHALL BE PROVIDED BY GNIDA WITH WTP OF ADEQUATE CAPACITY AS PER DESIGN TO CATER THE DAILY WATER REQUIREMENT OF APPROX. 60 KLD. DOM WATER TANK CAPACITY 25KL , RAW WATER TANK CAPACITY 25KL, AND PUMP ROOM LOCATED AT BASEMENT AREA AND 10KL TANK LOCATED AT TERRACE |
| 6 | Sewer System SEWERAGE AND SULLAGE WILL BE TREATED IN MULTISTAGE PROCESS AT STP OF 100 KLD CAPACITY WITH TANK SIZE 16.9M X 5.120 M LOCATED AT BASEMENT. THE PROCESS INCLUDES SCREENING AND GRIT REMOVAL, PRIMARLY SETTLING OF THE SOLIDS, BILOGICAL BREAKDOWN OF ORGANIC MATTERS AND DISINFECTION ALONG WITH ADVANCED FILTERATION TREATMENT. SLUDGE WILL BE SEPERATED AND DISPOSSED OFF OR REUSED, WHILE THE FINAL TREATED WATER (EFFULENT) WILL BE REUSED IN HORTICULTURE AND AC SYSTEM OR DISCHARGE. THE MBBR TECHNOLOGY WILL BE MOST APPROPRIASTE TO BE USED. |
| 7 | Drain OVERFLOW OF RAIN WATER HARVESTING PIT TO STORM WATER DRAIN OF GNIDA IS BEING PROPOSED. PEAK HOURLY DISCHARGE HAS BEEN TAKEN 42 CU METER. ONE NUMBER OF RAIN WATER HARVESTING PIT IS ALSO PROPOSED TO BE INSTALLED TO RECHARGE THE GROUND WATER. |
| 8 | Parks GREEN AREA IS BEING PROVIDED AS PER GNIDA NORMS. THE GREEN AREA REQUIRED AS TOTAL SITE AREA IS 347.155 SQ. MTRS. HOWEVER THE PROPOSED GREEN AREA IS 348.94 SQ. MTRS. APPROX. GREEN G1 AREA IS 158.88 MTRS. AND GREEN G2 AREA IS 190.06 SQ. MTRS. |
| 9 | Tree Planting EVERGREEN TREE PLANTING AS PER GNIDA NORMS. 14 NOS. TREES ARE REQUIRED AS PER THE DEVELOPMENT AUTHORITY NORMS. KEEPING THE COMMITMENT OF GREEN NOIDA , 14 NOS. OF EVERGREEN TREES ARE PROPOSED FOR BETTER AND DEVELOPED GREEN AREA. THE DETAILES OF TREES ARE MENTIONED IN THE ATTACHED LANDSCAPE PLAN. |
| 10 | Design For Electric Supply Including Street Lighting ELECTRICAL LOAD CALCULATED AS PER REQUIREMENT AND PREVAILING NORMS. STREET LIGHTNING WITH ENERGY SAVING LED STREET LIGHTS ARE PROPOSED. TOTAL ELECTRICAL IS 1310 KV WITH 0.90 POWER FACTOR. THE PROPOSED TRANSFORMER CAPACITY IS 1250 KVA WITH 0.85 LOADING. 2 NOS. 625 KVA AIR COOLED DG SETS IS ALSO PROPOSED 0.8 LOADING FACTOR. |
| 11 | Community Buildings NOT PROVIDED SINCE THE PROJECT IS COMMERCIAL PROJECT |
| 12 | Treatment and Disposal System of Sewage and Sullage water SEWAGE AND SULLAGE WILL BE TREATED IN A MULTISTAGE PROCESS AT STP WITH ADVANCED FILTERATION SYSTEM. SULLAGE IS SEPERATED AND WILL BE USED/DISPOSSED OFF, WHILE THE FINAL TREATED WATER WILL BE USED IN FLUSH IN, GARDENNING AND AC SYSTEM. SEPERATE KITCHEN WASTE LINE CONNECTED TO ETP THROUGH GREASSED TRAP. |
| 13 | Solid Waste Management And Disposal System SEPERATING WASTE INTO DIFFERENT CATEGORIES AT THE SOURCE TO FACILITATE REUSE, RECYCLING AS PER NORMS. THE REUSED WASTE WILL BE SENT FOR PROCESSING OR DISPOSAL SITES. |
| 14 | Water Conservation System TECHNIQUES AND TECHNOLOGIES TO MANAGE THE WATER RESOURCES EFFICIENTLY, AIMING TO REDUCE WASTE RAIN WATER HARVESTING, REDUCTION IN WASTAGE OF WATER BY USING LOW FLOW FIXTURES. |
| 15 | Energy Management System Including Use of Renewable Energy OPTIMIZEE ENERGY DISTRIBUTION SYSTEM TO REDUCE WASTAGE AND OVERALL ENERGY USAGE BY INSTALLING LOW ENERGY CONSUMING LIGHT FIXTURE ETC. INSTALL SOLAR PANELLS AND INSTALL HEAT EFFICIENT GLASS TO REDUCE HEAT. |
| 16 | Fire Protection And Fire Safety System COMBINATION OF STRATEGIES, EQUIPMENT AND PROTOCOLS DESIGNATED TO PREVENT, DETECT, CONTROL AND SUPRESS FIRE, ENSURING THE SAFETY OF PEOPLE AND PROPERTY, IT CONSISTS FIRE SAFETY SYSTEM-ACTIVE AND PASSIVE COMPONENTS. ACTIVE COMPONENTS SUCH AS FIRE ALARM, SPRINKLERS AND EXTENGUISHERS, WHILE PASSIVE ACTIVE SYSTEM LIKE FIRE RESISTANT MATERIAL, FIRE BARRIERS, CONTAIN AND LIMIT FIRE SPREAD. ALL INSTALLATION WILL AS PER NBC NORMS TO PREVENT THE FIRE INCIDENCE, EFFECTIVE FIRE DETECTION AND FIRE FIGHTING SYSTEM. TANK LOCATED AT BASEMENT WITH TANK 1 CAPACITY 100KL AND TANK 2 CAPACITY 100KL. |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services PHYSICAL FACILITIES AND SERVICES THAT SUPPORT PUBLIC WELL BEING SUCH AS HANDICAPPED TOILET, PUBLIC TOILET, DRINKING WATER FACILITIES ETC. THE TOTAL NO. OF TOILETS ARE GIVEN AS PER STATUTORY REQUIREMENS. |
| 18 | Emergency Evacuation Services TO MOVE PEOPLE FROM A HIGH RISK LOCATION TO SAFE AREAS LIKE FIRE REFUGEE BALCONIES, FIRE ESCAPE STAIR CASE HAVE BEEN PROVIDED AS PER NBC NORMS. NINTH FLOOR REFUGEE TERRACE AREA=42.92 SQ. MTRS. |
| 19 | Other Miscellaneous Work NA |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 21 May 2031.
Sanctioned by Greater Noida Authority · 2,313 sqm of land · an approved plan of 1 block and 232 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| PLG/BP/SM-09-Mar-2026;27650 | 22 May 2026 | 21 May 2031 | 21 May 2036 | 8 Apr 2031 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
Land & documents
19 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| SLC-8/G/2, SECTOR-DELTA-2, GREATER NOIDA, DISTT. GAUTAMBUDH NAGAR, U.P. | 2313.47 | Plot |
| Lease deed · BAHI NO.1, ZILD NO. 48173, PAGE 281 TO 324, SR. NO. 38154 DATED 05.12.2025 The deed by which a development authority leased the land to the promoter, with the term and the conditions on it. | PDF ↗ |
| Registry document · As per Direction of Honble Authority passed in meeting held on 19.06.2026 Copy of affidavit clerfiyi The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | not reported | — |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | not reported | — |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 31 May 2026 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 30 Jun 2026 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 27 Jun 2026 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 31 May 2026 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 27 Jun 2026 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 27 Jun 2026 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 27 Jun 2026 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 27 Jun 2026 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 31 May 2026 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 2 Jun 2026 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 3 Jun 2026 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 3 Jun 2026 ↗ |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | New | 31 May 2026 ↗ |
| Agreement for sale (proforma) The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind. | New | 1 Jul 2026 ↗ |
Quarterly progress reports
1 filed report
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
1 quarterly progress report is on file with UPRERA, for 2026-Q1.
| Quarter | Construction | Certificates |
|---|---|---|
| 2026-Q1 | 0.79% | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | DTR DEVELOPERS LLP |
| Role | Promoter · current |
| RERA ID | UPRERAPRM453432 |
| PAN | AAYFD7120Q |
| CIN / TAN | MRTD10864A |
| Registered address | K-415, SITE-5, KASNA INDUSTRIAL AREA, ALPHA, GREATER NOIDA, GAUTAMBUDH NAGAR, U.P-201310 |
| RERA contact | |
| Registered since | 2026 |
Nearby projects
Gautam Budh Nagar
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | DTR DEVELOPERS LLP COLLECTION A/C FOR LIFESTYLE CENTRALBankICICI BANK LTD.BranchKASNA, GREATER NOIDABranch addressSHOP NO. 5 & 6, RAMDAS PAL MARKET, KHASRA NO. 691, 692, 694, MAIN ROAD, KASNA, GREATER NOIDA, GAUTAMBUDH NAGAR, UTTAR PRADESH-201308Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCICIC0007782Branch emailshimbhu.dayal@icici.bank.in |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | DTR DEVELOPERS LLP SEPARATE BANK A/C FOR LIFESTYLE CENTRALBankICICI BANK LTD.BranchKASNA, GREATER NOIDABranch addressSHOP NO. 5 AND 6, RAMDAS PAL MARKET, KHASRA NO. 691, 692 694, MAIN ROAD, KASNA, GREATER NOIDA, GAUTAMBUDH NAGAR, UTTAR PRADESH-201308Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCshimbhu.dayalicici.bank.in |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | DTR DEVELOPERS LLP RERA TRANSACTION A/C FOR LIFESTYLE CENTRALBankICICI BANK LTD.BranchKASNA, GREATER NOIDABranch addressSHOP NO. 5 AND 6, RAMDAS PAL MARKET, KHASRA NO. 691, 692, 694, MAIN ROAD, KASNA, GREATER NOIDA, GAUTAMBUDH NAGAR, UTTAR PRADESH-201308Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCICIC0007782 |
What has changed on this record
nothing recorded yet
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.What to verify and what to ask
1 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about Lifestyle Central
Is Lifestyle Central RERA registered?
Yes. Lifestyle Central is registered with UPRERA under registration number UPRERAPRJ307878, registered on 8 Jul 2026. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for Lifestyle Central?
The completion date filed with UPRERA is 8 Apr 2031. No completion certificate is on record yet.
Who is the builder of Lifestyle Central?
DTR DEVELOPERS LLP is the promoter entity that filed Lifestyle Central with UPRERA (promoter RERA ID UPRERAPRM453432). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does Lifestyle Central have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is Lifestyle Central located?
Lifestyle Central is registered in Sector-Delta-2, Gautam Budh Nagar, as filed with UPRERA.
What configurations are available in Lifestyle Central?
The unit plan filed with UPRERA lists OTHER, SHOP and STUDIO. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in Lifestyle Central?
The approved unit plan filed with UPRERA runs from 9 to 209 m² of carpet area (about 97 to 2,254 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
How many towers and units are planned in Lifestyle Central?
The approved unit plan describes 1 block and 232 units of which 142 are homes and 90 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is Lifestyle Central?
About 406 units per acre: 232 planned units across 0.57 acres (2,313 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗