Maa Shakambhari Devi Awasiya Yojna, Naveen Saharanpur, (Phase -01) is a RERA-registered residential project by SAHARANPUR DEVELOPMENT AUTHORITY in chunheti gada, Saidpura, Mohmadpur Bahalolpur, Saharanpur (RERA ID UPRERAPRJ409634). Registered with a completion deadline of 1 Jan 2031.
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ409634 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Saharanpur Development Authority |
| Proposed start | 1 Jan 2026 |
| Project duration | 61 months |
| Address | Mini By Pass Village Chunheti Gada, Saharanpur, UttarPradesh 247001, chunheti gada, Saidpura, Mohmadpur Bahalolpur, Saharanpur, Saharanpur |
| Tehsil | Saharanpur |
| Applicant type | Competent authority |
| Applicant address | Yadev Puri, Near Ganna Bhawan, Hakikat Nagar, Saharampur. |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
2025/MAA SHAKAMBHARI DEVI AWASIYA YOJNA, NAVEEN SAHARANPUR/SDA/2025-26
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 26 Mar 2026 |
| Original completion | 1 Jan 2031 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹18,49,500 |
| Sanctioning authority | Saharanpur Development Authority |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots As per Lay out numbering plan. There will be plot demarcation of each line, RCC Tee will be installed between the plots. |
| 2 | Boundary Wall Boundary Wall with Brickwork and column at spacing of 3m and 1.5 m height surrounding the area of land. |
| 3 | Road Work Road will be Constructed as per the sanctioned layout plan. Earth Filling work for sub grade and preparation of GSB 250 mm and 200mm WMM than final coat of BM and BC. Bituminous Roads of 9m, 12m,18 m 24m wide will be done in stepwise development work. In the 24 meter road width footpath, round about at junction and other utility services are provided to enhance mobility. |
| 4 | Footpaths Footpaths with interlocking paver blocks are proposed. in 24 m wide road and electric trench.through footpath. |
| 5 | Water Supply Including Drinking Water Facilities The Water will be supplied through borewell to underground tank and Drinkable water shall be supplied through tube wells treated by automated chlorinating plant. These primary treatment plants shall be installed with in pump house of each water work.
- Total required capacity 270000 LPH, water will be transferred from WTP to UWT
- underground water tank including water line 200mm/150mm/140mm/110mm/25mm diameter HDPE/DI pipe/GI pipes.
-All Tubewells and water supply system will be provided with in power backup. |
| 6 | Sewer System Gravity based sewerage system with NP2/NP3 pipes of diameter 600mm/350mm/200 mm/150mm line proposed . The provision of sewerage chamber Maa Shakambhari devi Awasiya yojna Naveen saharanpur, phase 1 township
to manage waste water efficiently. |
| 7 | Drain Precast/Reinforced cement concrete drains are proposed to be built. |
| 8 | Parks Parks are to be built with boundary walls including footpaths for public use. |
| 9 | Tree Planting Tree plantation should be provided in every parks, along the road side and green areas . |
| 10 | Design For Electric Supply Including Street Lighting Electrical load as per sanctioned UPPCL drawing with ESS. Street light will be provided in every roads High Mast provision in every parks and round about also. Propsed elrctric work including street light for better visibility. The main Sub station is of 33/11 KVA connected with feeder pillars. |
| 11 | Community Buildings Community facilities has been proposed for various activities |
| 12 | Treatment and Disposal System of Sewage and Sullage water Well Planned Sewage system has been proposed . Anticipated sewage contribution from the township is approximate 2.20MLD. Treatment plant is designed about 25000 population. |
| 13 | Solid Waste Management And Disposal System Waste collection point has been planned throughout the site to facilitate efficient solid waste management. |
| 14 | Water Conservation System Individual plots will ensure Rain water Harvesting system will be developed as per bye-laws. |
| 15 | Energy Management System Including Use of Renewable Energy Solar system and solar water heating system for ensure according to bye-laws. |
| 16 | Fire Protection And Fire Safety System NA |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services Medical/Health center, School , Community Center Police station, Parks and Play Ground provided in Master layout plan. |
| 18 | Emergency Evacuation Services NA |
| 19 | Other Miscellaneous Work NA |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 17 Oct 2030.
Sanctioned by Saharanpur Development Authority · 3,41,503 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| 2025/MAA SHAKAMBHARI DEVI AWASIYA YOJNA, NAVEEN SAHARANPUR/SDA/2025-26 | 18 Oct 2025 | 17 Oct 2030 | 16 Oct 2033 | 1 Jan 2031 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
Land & documents
106 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 2M | 2630 | Khasra |
| 3M and 4 | 25660 | Khasra |
| 23M | 1920 | Khasra |
| 25 and 26 | 5760 | Khasra |
| 5 | 4760 | Khasra |
| 12 and 13 | 1021.40 | Khasra |
| 27M | 1024 | Khasra |
| 9M | 1274 | Khasra |
| 10M | 640 | Khasra |
| 11M | 186 | Khasra |
| 16M | 912 | Khasra |
| 16M | 8210 | Khasra |
| 16M | 1824 | Khasra |
| 9M | 2546 | Khasra |
| 10M | 1280 | Khasra |
| 11M | 374 | Khasra |
| 16M | 4100 | Khasra |
| 22 | 9710 | Khasra |
| 24M | 1246 | Khasra |
| 12M | 439.30 | Khasra |
| 13m | 439.30 | Khasra |
| 23M | 1920 | Khasra |
| 24M | 1870 | Khasra |
| 8M | 1680 | Khasra |
| 3M | 2320 | Khasra |
| 6M | 2095 | Khasra |
| 6M | 4380 | Khasra |
| 6M | 1020 | Khasra |
| 16M | 1882 | Khasra |
| 8M | 960 | Khasra |
| 8M | 1200 | Khasra |
| 3M | 1160 | Khasra |
| 6M | 136.70 | Khasra |
| 6M | 908.30 | Khasra |
| 16M | 3592 | Khasra |
| 2M | 4370 | Khasra |
| 27M | 1591 | Khasra |
| 27M | 13545 | Khasra |
| 1 | 870 | Khasra |
| 24M | 624 | Khasra |
| 163/2 | 1180 | Khasra |
| 6M | 2367 | Khasra |
| 298 | 12980 | Khasra |
| 449M | 7325 | Khasra |
| 301M | 4010 | Khasra |
| 449M | 7325 | Khasra |
| 303M | 1879 | Khasra |
| 299 | 10730 | Khasra |
| 448 | 28610 | Khasra |
| 297M | 1378.50 | Khasra |
| 301M | 2445 | Khasra |
| 297M | 586.26 | Khasra |
| 297M | 2132 | Khasra |
| 303M | 341.50 | Khasra |
| 59M | 4737 | Khasra |
| 61M | 8233 | Khasra |
| 61M | 1360 | Khasra |
| 60M | 4416 | Khasra |
| 52/3M | 6655 | Khasra |
| 50M | 1400 | Khasra |
| 61M | 4797 | Khasra |
| 46 | 33500 | Khasra |
| 55M | 1058 | Khasra |
| 59M | 1741 | Khasra |
| 58M | 6740 | Khasra |
| 55M | 1738 | Khasra |
| 58M | 3370 | Khasra |
| 55M | 5594 | Khasra |
| 52/3M | 6655 | Khasra |
| 51M | 2675 | Khasra |
| 300 | 970 | Khasra |
| 433 | 1305 | Khasra |
| 297M | 450 | Khasra |
| 450 | 200 | Khasra |
| 56 | 100 | Khasra |
| 62 | 410 | Khasra |
| 49 | 200 | Khasra |
| 48 | 100 | Khasra |
| 47 | 360 | Khasra |
| 14 | 870 | Khasra |
| 15 | 460 | Khasra |
| 21 | 100 | Khasra |
| 7 | 850 | Khasra |
| 296 | 820 | Khasra |
| 57 | 3230 | Khasra |
| 163/1 | 1180 | Khasra |
| 164 | 2770 | Khasra |
| 59 | 12131 | Khasra |
| 60 | 14614 | Khasra |
| 59 | 341 | Khasra |
| Registry document · 3853 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 3961 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 4366 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 4668 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 4667 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 5267 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 5600 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 5693 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 5745 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 5934 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 6110 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 6165 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 6164 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 6739 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 6975 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 7145 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 7403 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 7401 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 7658 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 7832 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 4287 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 5665 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 5935 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 6166 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 6885 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 11798 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 11497 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 3592 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 3730 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 3852 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 3960 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 5003 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 5002 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 5266 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 5265 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 5445 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 6109 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 6252 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 6597 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 7402 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 7539 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 7555 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 7790 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 9167 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 6445 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 6649 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 7938 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 8709 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 15228 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 11329 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 12649 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 13096 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 8381 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Allotment letter from the authority · 2377 The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Allotment letter from the authority · 5076/04 The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Allotment letter from the authority · 2487 The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Allotment letter from the authority · 2497 The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Registry document · 4286 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Khatauni extract · 1429-1434 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1429-1434 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Registry document · 4288 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 6499 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 3587 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 5933 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 12272 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Allotment letter from the authority · 43 The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Allotment letter from the authority · 00 The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Khatauni extract · SUBMIT AFFIDAVIT REGARDING KHATONI An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · Affidavit An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 31 Dec 2025 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 23 Dec 2025 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 31 Dec 2025 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 26 Dec 2025 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 9 Jan 2026 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 9 Jan 2026 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 9 Jan 2026 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 8 Jan 2026 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 6 Jan 2026 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 7 Jan 2026 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 10 Mar 2026 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 22 Feb 2026 ↗ |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | New | 25 Feb 2026 ↗ |
| Agreement for sale (proforma) The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind. | New | 25 Feb 2026 ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | SAHARANPUR DEVELOPMENT AUTHORITY |
| Role | Promoter · current |
| RERA ID | UPRERAPRM163264 |
| PAN | AAALS0359L |
| CIN / TAN | MRTS02859D |
| Registered address | Yadev Puri, Near Ganna Bhawan, Hakikat Nagar, Saharampur. |
| RERA contact | |
| Registered since | 2022 |
Nearby projects
Saharanpur
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | SDA COLLECTION A/c For Maa Shakambari Devi Awasiya Yojna Naveen Saharanpur Phase -1BankINDIAN BANKBranchSAHARANPUR COURT ROAD BRANCHBranch addressINDIAN BANK SOPHIA MARKET COURT ROAD SAHARANPURBranch districtSaharanpur, Uttar PradeshA/C no.IFSCIDIB000S045Branch emailsaharanpur@indianbank.co.in |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | SDA Separate Bank A/c For Maa Shakambhari Devi Awasiya Yojana Naveen Saharanpur Phase-1BankINDIAN BANKBranchSAHARANPUR COURT ROAD BRANCHBranch addressINDIAN BANK, SOPHIA MARKET, COURT ROAD, SAHARANPUR 247001Branch districtSaharanpur, Uttar PradeshA/C no.IFSCIDIB000S045 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | SDA Rera Transaction A/c For Maa Shakambhari Devi Awasiya Yojana Naveen Saharanpur Phase-1BankINDIAN BANKBranchSAHARANPUR COURT ROADBranch addressINDIAN BANK, SOPHIA MARKET, COURT ROAD, SAHARANPUR 247001Branch districtSaharanpur, Uttar PradeshA/C no.IFSCIDIB000S045 |
What has changed on this record
nothing recorded yet
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.What to verify and what to ask
3 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No quarterly progress report is published for this project.Ask the promoter for the latest quarterly report filed and the construction percentage certified in it.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about Maa Shakambhari Devi Awasiya Yojna, Naveen Saharanpur, (Phase -01)
Is Maa Shakambhari Devi Awasiya Yojna, Naveen Saharanpur, (Phase -01) RERA registered?
Yes. Maa Shakambhari Devi Awasiya Yojna, Naveen Saharanpur, (Phase -01) is registered with UPRERA under registration number UPRERAPRJ409634, registered on 26 Mar 2026. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for Maa Shakambhari Devi Awasiya Yojna, Naveen Saharanpur, (Phase -01)?
The completion date filed with UPRERA is 1 Jan 2031. No completion certificate is on record yet.
Who is the builder of Maa Shakambhari Devi Awasiya Yojna, Naveen Saharanpur, (Phase -01)?
SAHARANPUR DEVELOPMENT AUTHORITY is the promoter entity that filed Maa Shakambhari Devi Awasiya Yojna, Naveen Saharanpur, (Phase -01) with UPRERA (promoter RERA ID UPRERAPRM163264). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does Maa Shakambhari Devi Awasiya Yojna, Naveen Saharanpur, (Phase -01) have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is Maa Shakambhari Devi Awasiya Yojna, Naveen Saharanpur, (Phase -01) located?
Maa Shakambhari Devi Awasiya Yojna, Naveen Saharanpur, (Phase -01) is registered in chunheti gada, Saidpura, Mohmadpur Bahalolpur, Saharanpur, as filed with UPRERA.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗