PARSVNATH ELITE FLOORS

UPRERANCLT

PARSVNATH ELITE FLOORS is a RERA-registered residential project by PARSVNATH DEVELOPERS LIMITED in Saharanpur (RERA ID UPRERAPRJ5455). RERA status: NCLT (since 30 Apr 2026).

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: NCLT.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ5455
Project categoryResidential
Registration typeOngoing
RERA statusNCLTNCLTThe tribunal that hears company insolvency cases. UP-RERA lists projects whose promoter is before it.Read the full entry in the glossary
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossarySaharanpur Development Authority
Proposed start25 Apr 2013
Original start25 Apr 2013
Project duration117 months
AddressSaharanpur, Saharanpur
TehsilSaharanpur
Applicant typeCompany
Applicant addressParsvnath Tower, Near Shahdara Metro Station Shahdara Delh-110032
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. 2 building permits sanctioned

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Permit revalidated (2)

  5. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  6. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  7. to

    Extension granted

  8. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

  9. NCLT order

Published without a date
UPRERA lists this project as NCLT. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered29 Jul 2017
Original completion31 Dec 2020
Revised completion28 Dec 2022
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹42,000
Sanctioning authoritySaharanpur Development Authority
NCLT order date30 Apr 2026

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors80 · 4 · 3 (units from plan)
  • 2 BHK33 41%
  • 3 BHK25 31%
  • 4 BHK11 14%
  • OTHER7 9%
  • 5 BHK4 5%
ConfigurationUnitsCarpet area
3 BHK2583-152
5 BHK4159
2 BHK3364-91
4 BHK11128
OTHER7183
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
PLOT NO. 305/307/308/309 · 3 BHK, 5 BHK2883-159
PLOT NO.272,273,275,501,502,503,504,505,506,507,50 · 2 BHK, 4 BHK34464-128
PLOT-192,194 · 3 BHK, OTHER3891-183
PLOT-458,459,460,461,462 · 3 BHK, OTHER32091-183
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Mr. C.L. Sharma
License CA/75/9
C-56 Sudharshan Park, Moti Nagar, New Delhi
Engineer
Ms. Sangeeta Jain
Parsvnath Tower Shahdara
Sr.Development work declared to RERA
1Demarcation of Plots
As per Sanction Plan
2Boundary Wall
NA
3Road Work
Flexible Pavement
4Footpaths
Grass / leveled Earth
5Water Supply Including Drinking Water Facilities
HDPE Pipes
6Sewer System
RCC/SW Pipes
7Drain
RCC drains with designated Discharge Points & RWH
8Parks
Landscaped Parks
9Tree Planting
As per Landscape plan
10Design For Electric Supply Including Street Lighting
Copper Wires in concealed PVC conduits , As per Drawing /Landscape plan/ Single Point Supply and then distributed to Units
11Community Buildings
NA
12Treatment and Disposal System of Sewage and Sullage water
STP
13Solid Waste Management And Disposal System
2 Bin System ( Green & Blue) and disposable to designated place as per Guidelines
14Water Conservation System
Rain Water harvesting System
15Energy Management System Including Use of Renewable Energy
As per Guidelines/ Drawing
16Fire Protection And Fire Safety System
As per Guidelines / Project Report
17Social Infrastructure And Other Public Amenities Including Public Health Services
NA
18Emergency Evacuation Services
Guidelines / Project Report
19Other Miscellaneous Work
NA
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

2 permits

An approval and the date it runs to - not proof the work matching it was done.

2 sanctioning permits are on record with UPRERA, the latest valid to 3 Feb 2017. All 2 carry a revalidation, the latest valid to 20 Mar 2023.

Sanctioned by Saharanpur Development Authority · 7,308 sqm of land · an approved plan of 4 blocks and 80 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endRevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossaryDocuments filed
2461/SDA/20114 Feb 20123 Feb 201720 Mar 202331 Dec 202021 Mar 2018
valid to 20 Mar 2023
as 379 TO 382/ZONE-10/SDA/2018
2461/SDA/20114 Feb 20123 Feb 201720 Mar 202331 Dec 202021 Mar 2018
valid to 20 Mar 2023
as 379 TO 382/ZONE-10/SDA/2018
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 2 completion extensions for this project, the latest running to 28 Dec 2022.

#Granted fromExtended uptoNote
131 Dec 202030 Jun 2021Six months extension in view of force majeure caused by covid-19 pandemic
230 Jun 202128 Dec 2022—

Land & documents

15 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
-7308—
227/2,227/3,227/3M/,228/3M,230M,232,234,236/1M,52,293487Khasra
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

1 registry or lease-deed filing is on this project’s record with UPRERA, dated 27 Nov 2007.

Registry no.DateTypeArea
58327 Nov 2007other—
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · JILD NO 105
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · JILD NO 105
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
not reported—
Water supply plan
How the project proposed to supply water, as filed at registration.
not reported—
Electricity supply plan
How the project proposed to supply power, as filed at registration.
not reported—
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
not reported—
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New6 Jul 2018 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New31 Jan 2019 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New31 Jan 2019 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New20 Aug 2018 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New31 Jan 2019 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New31 Jan 2019 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New31 Jan 2019 ↗

Quarterly progress reports

11 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

11 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2022-Q3.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal namePARSVNATH DEVELOPERS LIMITED
RolePromoter · current
RERA IDUPRERAPRM9123
PANAAACP0743J
CIN / TANL45201DL1990PLC040945
Name of chairmanPradeep Kumar Jain
Registered addressParsvnath Tower, Near Shahdara Metro Station Shahdara Delh-110032
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
PARSVNATH DEVELOPERS LIMITEDBankSYNDICATE BANKBranchBARAKHAMBA ROADA/C no.IFSCSYNB0009036
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about PARSVNATH ELITE FLOORS

Is PARSVNATH ELITE FLOORS RERA registered?

Yes. PARSVNATH ELITE FLOORS is registered with UPRERA under registration number UPRERAPRJ5455, registered on 29 Jul 2017. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for PARSVNATH ELITE FLOORS?

The completion date filed with UPRERA is 28 Dec 2022. No completion certificate is on record yet.

Who is the builder of PARSVNATH ELITE FLOORS?

PARSVNATH DEVELOPERS LIMITED is the promoter entity that filed PARSVNATH ELITE FLOORS with UPRERA (promoter RERA ID UPRERAPRM9123). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted PARSVNATH ELITE FLOORS more time to complete?

UPRERA's record carries 2 completion extensions for PARSVNATH ELITE FLOORS, the latest running to 28 Dec 2022. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does PARSVNATH ELITE FLOORS have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is PARSVNATH ELITE FLOORS located?

PARSVNATH ELITE FLOORS is registered in Saharanpur, as filed with UPRERA.

What configurations are available in PARSVNATH ELITE FLOORS?

The unit plan filed with UPRERA lists 3 BHK, 5 BHK, 2 BHK, 4 BHK and OTHER. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in PARSVNATH ELITE FLOORS?

The approved unit plan filed with UPRERA runs from 64 to 183 m² of carpet area (about 689 to 1,970 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in PARSVNATH ELITE FLOORS?

The approved unit plan describes 4 blocks and 80 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is PARSVNATH ELITE FLOORS?

About 44 units per acre: 80 planned units across 1.81 acres (7,308 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗