MAHAGUN MANTRA 1 is a RERA-registered residential project by DHANYA PROMOTERS PRIVATE LIMITED (MAHAGUN GROUP) in Gautam Budh Nagar (RERA ID UPRERAPRJ1846). Registered with a completion deadline of 29 Dec 2020.
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ1846 |
| Project category | Residential |
| Registration type | Ongoing |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Greater Noida Authority |
| Proposed start | 1 Dec 2013 |
| Original start | 1 Dec 2013 |
| Project duration | 85 months |
| Address | GH 01/B Sector-10 Greater Noida West, Gautam Buddha Nagar, Gautam Budh Nagar |
| Tehsil | Gautam Buddha Nagar |
| Applicant type | Company |
| Applicant address | C-227, VIVEK VIHAR, DELHI-110095 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Building permit sanctioned
PLG(BP)3263/8487
Registered with RERA
- to
Extension granted
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
- to
Extension granted
- to
Extension granted
“Six months extension in view of force majeure caused by covid-19 pandemic”
- to
Extension granted
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 27 Jul 2017 |
| Original completion | 30 Jun 2019 |
| Revised completion | 29 Dec 2020 |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹66,500 |
| Sanctioning authority | Greater Noida Authority |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
- 2 BHK300 53%
- OTHER144 25%
- 3 BHK102 18%
- SHOP19 3%
| Configuration | Units | Carpet area |
|---|---|---|
| OTHER | 144 | 69-82 |
| 2 BHK | 300 | 57-65 |
| 3 BHK | 102 | 82 |
| SHOP | 19 | 5-20 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| T1 - RIDDHI · OTHER, 2 BHK, 3 BHK | 27 | 204 | 57-82 |
| T2 - OM · 2 BHK, OTHER, SHOP | 25 | 157 | 5-69 |
| T3 - VIDHI · OTHER, 2 BHK, 3 BHK | 27 | 204 | 57-82 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots NORTH SIDE- AUTHORITY ROAD, SOUTH SIDE- PARK, EAST SIDE- OTHERS PROPERTY, WEST SIDE- OTHERS PROPERTY |
| 2 | Boundary Wall 1. M HIGH BOUNDARY WALL A COMBINATION OF RCC & MS |
| 3 | Road Work ALL INTERNAL ROAD IN CONCRETE PAVER BLOCKS |
| 4 | Footpaths NA |
| 5 | Water Supply Including Drinking Water Facilities WATER TREATMENT PLANT IS PROVIDED FOR DRINKING WATER |
| 6 | Sewer System SEWER LINE WITH REQUIRED SLOPE & ADEQUATE MANHOLES |
| 7 | Drain ADEQUATE CATCH BASINS & MANHOLES ARE PROVIDED FOR SURFACE DRAIN |
| 8 | Parks GREEN AREA OF APPROX 50 % OF LAND AREA IS PROVIDED |
| 9 | Tree Planting A VARIETY OF TREES WITH 250 APPROX NUMBERS |
| 10 | Design For Electric Supply Including Street Lighting SUFFICIENT LIGHTING AS PER SERVICE & LANDSCAPE CONSULTANT |
| 11 | Community Buildings CLUB IN GROUND FLOOR IN T2 TOWER |
| 12 | Treatment and Disposal System of Sewage and Sullage water PROVIDED STP BASED ON M.B.B.R. TECHNOLOGY |
| 13 | Solid Waste Management And Disposal System PROVIDED AS PER SUTHORITY NORMS |
| 14 | Water Conservation System RAIN WATER HARVESTING PITS ARE PROVIDED AS PER NORMS |
| 15 | Energy Management System Including Use of Renewable Energy LED LIGHTS & SOLAR WATER HEATERS ARE PROVIDED AS PER NORMS |
| 16 | Fire Protection And Fire Safety System FIRE SPRINKLERS, SMOKE DETECTORS, FHC WITH PUMPS ARE PROVIDED AS PER NORMS |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services WATER TREATMENT PLANT, STP, FACILITY OFFICE ARE PROVIDED |
| 18 | Emergency Evacuation Services FIRE STAIRCASE IN EACH TOWER IS PROVIDED |
| 19 | Other Miscellaneous Work KIDS PLAY AREA, SWIMMING POOL, KIDS SWIMMING POOL, GREEN LAWN ETC AREA PROVIDED |
Registered agents
1 agent
Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.
| Sr. | Agent | RERA registration |
|---|---|---|
| 1 | INVESTORS CLINIC INFRATECH PRIVATE LIMITED | UPRERAAGT10052 |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 23 Nov 2021.
Sanctioned by Greater Noida Authority · 12,251 sqm of land · an approved plan of 3 blocks and 565 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Revised end | Documents filed |
|---|---|---|---|---|
| PLG(BP)3263/8487 | 24 Nov 2016 | 23 Nov 2021 | 30 Dec 2019 |
| Document | File |
|---|---|
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Project approval The approval the promoter filed as the basis for registering the project. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Sanctioned layout plan The approved layout of the whole site: where the towers, roads and open areas sit on the plot. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
UPRERA’s record carries 4 completion extensions for this project, the latest running to 29 Dec 2020.
| # | Granted from | Extended upto | Note |
|---|---|---|---|
| 1 | 30 Jun 2019 | 30 Dec 2019 | — |
| 2 | 30 Dec 2019 | 31 Mar 2020 | — |
| 3 | 31 Mar 2020 | 30 Sept 2020 | Six months extension in view of force majeure caused by covid-19 pandemic |
| 4 | 30 Sept 2020 | 29 Dec 2020 | — |
Land & documents
24 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| GH01/B, Sector 10, Greater Noida West | 12250.70 sq. meter | — |
| GH-01/B, Sector 10, Greater Noida West | 12250.70 | Plot |
| GH-01/B, Sector 10, Greater Noida West | 12250.70 | Plot |
2 registry or lease-deed filings are on this project’s record with UPRERA, the earliest dated 19 Oct 2012.
| Registry no. | Date | Type | Area |
|---|---|---|---|
| 20162 | 19 Oct 2012 | self | — |
| 20162/2012 Book No. 1 | 19 Oct 2012 | self | — |
| Registry document · Regn. No. 20162, Book 1, Zild 11807, Page 17-66 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · Regn. No. 20162, Book 1, Zild 11807, Page 17-66 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 4 Jul 2018 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 4 Jul 2018 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 4 Jul 2018 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 4 Jul 2018 ↗ |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | New | 30 Jun 2018 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 4 Jul 2018 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 4 Jul 2018 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 4 Jul 2018 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 4 Jul 2018 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 30 Jun 2018 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 3 Jun 2018 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 3 Jun 2018 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 3 Jun 2018 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | Old | 12 Jan 2018 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | Old | 19 Jan 2018 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | Old | 19 Jan 2018 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | Old | 20 Jan 2018 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 20 Jan 2018 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 20 Jan 2018 ↗ |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | Old | 20 Jan 2018 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | Old | 24 Jan 2018 ↗ |
Facilities
as declared to RERA
Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.
| Drinking water | To be provided by Municipal Authority |
| Fire safety (as filed with RERA) | Provided as per requirement |
| Health service | YES |
| Renewable energy | PARTIAL |
The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.
Quarterly progress reports
7 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
7 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2021-Q3.
| Quarter | Construction | Certificates |
|---|---|---|
| 2020-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | DHANYA PROMOTERS PRIVATE LIMITED (MAHAGUN GROUP) |
| Role | Promoter · current |
| RERA ID | UPRERAPRM1672 |
| PAN | AAECD3709Q |
| CIN / TAN | U70109DL2012PTC240843 |
| Name of chairman | C-215, VIVEK VIHAR, DELHI-110095 |
| Registered address | C-227, VIVEK VIHAR, DELHI-110095 |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Gautam Budh Nagar
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| Bank account as filed | DHANYA MANTRA-I RERA PROJECT ESCROW ACCOUNTBankHDFC BANK LTD.BranchVaishali, GhaziabadA/C no.IFSCHDFC0000422 |
What has changed on this record
2 movements
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Promoter’s complaints tally (all their projects) | 55 (Under Registration - 2 ) → 55 (Under Registration - 1 ) changed in Estanzo’s record | 18 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 54 (Under Registration - 1 ) → 55 (Under Registration - 2 ) changed in Estanzo’s record | 29 Sept 2026 |
| Promoter’s complaints tally (all their projects) | changed in Estanzo’s record · 18 Oct 2026 · 2 movements on record |
Common questions about MAHAGUN MANTRA 1
Is MAHAGUN MANTRA 1 RERA registered?
Yes. MAHAGUN MANTRA 1 is registered with UPRERA under registration number UPRERAPRJ1846, registered on 27 Jul 2017. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for MAHAGUN MANTRA 1?
The completion date filed with UPRERA is 29 Dec 2020. No completion certificate is on record yet.
Who is the builder of MAHAGUN MANTRA 1?
DHANYA PROMOTERS PRIVATE LIMITED (MAHAGUN GROUP) is the promoter entity that filed MAHAGUN MANTRA 1 with UPRERA (promoter RERA ID UPRERAPRM1672). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Has UPRERA granted MAHAGUN MANTRA 1 more time to complete?
UPRERA's record carries 4 completion extensions for MAHAGUN MANTRA 1, the latest running to 29 Dec 2020. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.
Does MAHAGUN MANTRA 1 have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is MAHAGUN MANTRA 1 located?
MAHAGUN MANTRA 1 is registered in Gautam Budh Nagar, as filed with UPRERA.
What configurations are available in MAHAGUN MANTRA 1?
The unit plan filed with UPRERA lists OTHER, 2 BHK, 3 BHK and SHOP. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in MAHAGUN MANTRA 1?
The approved unit plan filed with UPRERA runs from 5 to 82 m² of carpet area (about 50 to 877 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
How many towers and units are planned in MAHAGUN MANTRA 1?
The approved unit plan describes 3 blocks and 565 units of which 546 are homes and 19 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is MAHAGUN MANTRA 1?
About 187 units per acre: 565 planned units across 3.03 acres (12,251 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗