RERA status as reported: Registered.

Construction progress

As filed in quarterly progress reports · % complete · latest filed Apr–Jun 2026
Quarters shown are calendar quarters. UP-RERA files them by financial year.
—Q3'24
—Q4'24
—Q1'25
—Q2'25
16%Q3'25
24%Q4'25
34%Q1'26
35%Q2'26

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ742692
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryGreater Noida Authority
Proposed start25 Apr 2024
Project duration60 months
AddressPlot No. GH-01D,, Sector 10, Vaidpura, Grater Noida, Dadri, Gautam Budh Nagar
TehsilDadri
Applicant typeCompany
Applicant addressPLOT NO.- 9F & 9G,KH NO.-171,2ND FLOOR, 2A, STREET NO.-3,WAZIRABAD EXTN, North Delhi, WAZIRABAD DELHI, Delhi, India, 110084
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    PLG/BP SM-09Apr-2024-20904

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Permit revalidated

    PLG/BP SM-25-DEC-2024 :23441 (FOR BLOCK-A )

  5. Building permit sanctioned

    PLG/BP SM-25-DEC-2024 :23441 (FOR BLOCK-A )

  6. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  7. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered14 Sept 2024
Original completion24 Apr 2029
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹66,500
Sanctioning authorityGreater Noida Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors545 · 5 · 26 (units from plan)
Homes · commercial units531 · 14 (shops and offices filed in the same plan)
  • 3 BHK299 55%
  • STUDIO192 35%
  • 2 BHK36 7%
  • SHOP14 3%
  • PENTHOUSE4 1%
ConfigurationUnitsCarpet area
2 BHK3655
3 BHK29964-124
STUDIO19226-35
PENTHOUSE4245
SHOP14288
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
A · 2 BHK, 3 BHK, STUDIO1823826-65
B1 · 3 BHK259977-92
B2 · 3 BHK259977-94
C · 3 BHK, PENTHOUSE2595120-245
Commercial · SHOP, OTHER414288
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Pankaj Nath Andley
License CA/99/24866
C-39, Housing Society South Extension-I, New Delhi
Engineer
Dr. Gyan Singh
A-242, New Friends Colony, New Delhi
Contractor
Renowned Buildtech Private Limited
D 247/3, Noida, Gautam Buddha Nagar, Uttar Pradesh
Sr.Development work declared to RERA
1Demarcation of Plots
Demarcation of the plot is completed by appointed survey consultant.
2Boundary Wall
Boundary wall is proposed to be constructed as per the survey drawing and architectural.
3Road Work
Yes, RCC Trimix Road with Kerb Stone on Sides and Stone Paving in front of Towers.
4Footpaths
All foot paths will be constructed as per the architectural site plan and landscape drawing.
5Water Supply Including Drinking Water Facilities
Yes, Water Supply from Authority further water to be collected in under ground water reservoirs Terrace Tanks, equipped with Hydro Pneumatic pumps with GI rings and risers.
6Sewer System
RCC hume pipe with Manhole, Chambers and Collection chamber and connections with Authority Sewer System.
7Drain
Drains are provided in the entire open area that carries water to 2 rain water harvesting chambers provided at each corner on the site.
8Parks
Parks in the form of open/green area is provided at the podium level which is 49.23 percent of the plot area i.e. 6030.425 sqmt.
9Tree Planting
As per MoEFCC norms, no. of trees required - 9482.454/100= 95 Trees. Provided is 125 Trees.
10Design For Electric Supply Including Street Lighting
Electric supply and Street lighting will be developed as per the design provided by the architect and appointed consultant considering site requirements.
11Community Buildings
Community Building space is provided at 1st floor level and second floor which have two Floors. 1st floor which has the total community area as 628.90 sqm.
12Treatment and Disposal System of Sewage and Sullage water
Proposed STP of capacity i.e. 325 KLD will be installed for treatment of wastewater. After the treatment, water will be generated which will be entirely used for DG Cooling, Horticulture and Flushing. Following arrangements will be made at the site in accordance to Solid Wates Management Rules, 2016. a) 60 percent bio-degradable waste b) 30 percent non-bio degradable c) 10 percent inert waste The solid waste will be segregated at source and collected through trained employed personals.
13Solid Waste Management And Disposal System
Dedicated covered and isolated site for storage of wastes . Adequate number of colored bins (green, blue and dark grey) seperate for bio-degradable and non-bio degradable are proposed to be provided at the strategic location within site. STP sludge is proposed to be used for horticultural purposes as a manure. Horticultural waste is composted and used for gardening purposes. Organic waste convertor will be installed to convert bio-degradable wastes into manure. The manure will be used in horticulture. Roof top area Ground Coverage= 2768.246 m2 Green area 6030.425m2 Paved area Total Plot Area- (Roof-top Area + Green Area) = 12250.700- (2768.246 + 6030.425) = 3452.029 m2 Runoff load Roof-top Area= 2768.246 x 0.06 x 0.9 =149.48m3/hr
14Water Conservation System
Green Area= 6030.425 x 0.06 x 0.15 =54.27 m3/hr Paved Area= 3452.029 x 0.06 x 0.85 =176.05 m3/hr Total Runoff Load= (149.48 + 54.27 + 176.05) m3/hr =379.80 m3/hr Considering size of recharge pit size will be 8 mlong, 6m wide and 2 m deep. So the volume of a single pit will be = 96 Cum Total Recharge will be required = 379.80/96 = 3.956 Nos. Power requirement for the project is 1990 kW. 1 transformer of total capacity 1000 kVA/800 KVA/630 KVA will be provided. Source of power will be Noida Power Company Limited (NPCL).
15Energy Management System Including Use of Renewable Energy
DG sets of total capacity 2000 KVA (1 of 500 KVA and 2 of 750 KVA) will be provided for power back up. Silent DG sets are proposed to reduce the noise level and CPCB norms will be complied to check the pollution. Monitoring of the DG sets (stack emission) will be done quarterly. Height of the stacks will be 114 meters from the ground level, and 6m from the rooftop, the height of the highest building is 108 m. The fire protection system for the building is to be designed as per the provisions of National Building Code-2005 and the directions of local fire service authority. In addition to above, the fire extinguisher system is to be design in accordance with IS 2190. Height of the building 106.8 m. Fire NOC has been obtained. Fire Fighting facilities
16Fire Protection And Fire Safety System
Hose reel, Landing Valve, wet riser of F.B. Inlet on each floor according to the standards. Fire Extinguisher on each floor according to IS-2190. Automatic sprinkler system on entire building. Automatic fire detection and alarm system (being taken care by Electrical Consultant) Yard hydrants on the periphery of the building. Public Address and Communication system (being taken care by Electrical Consultant) Alternate source for fulfilling the electricity requirement. One lift with the provision of firemen switch. Mechanical ventilation in basement.
17Social Infrastructure And Other Public Amenities Including Public Health Services
Social infrastructural space is provided at stilt and in community hall.
18Emergency Evacuation Services
Fire staircase is provided in each of the four towers for emergency evacuation as per the NBC guidelines and 9/6 m wide fire tender path has been provided for Fire tender movement in case of emergency.
19Other Miscellaneous Work
Dedicated seperate entry and exit has been proposed to enter the premises for better security and vehicular movement.
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

1 agent

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1Syed Kazim AkhtarUPRERAAGT25245
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

2 permits

An approval and the date it runs to - not proof the work matching it was done.

2 sanctioning permits are on record with UPRERA, the latest valid to 24 Apr 2029. 1 of them carries a revalidation.

Sanctioned by Greater Noida Authority · 12,250 sqm of land · an approved plan of 5 blocks and 545 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endRevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossaryDocuments filed
PLG/BP SM-09Apr-2024-2090425 Apr 202424 Apr 202924 Apr 203224 Apr 2029—
PLG/BP SM-25-DEC-2024 :23441 (FOR BLOCK-A )16 Mar 202516 Mar 202916 Mar 203324 Apr 202916 Mar 2025
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

16 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
GH-01D12250Plot
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Lease deed · NA
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Allotment letter from the authority · PROP/BRS-05/2010-11/455
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Document checklist
DocumentStatusUploaded
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New14 Aug 2024 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New18 Jul 2024 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New18 Jul 2024 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New18 Jul 2024 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New2 Aug 2024 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New14 Aug 2024 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New14 Aug 2024 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New14 Aug 2024 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New20 Aug 2024 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New14 Aug 2024 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New16 Jul 2024 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New16 Jul 2024 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New14 Aug 2024 ↗
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
New18 Jul 2024 ↗

Quarterly progress reports

9 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

9 quarterly progress reports are on file with UPRERA, covering 2024-Q1 to 2026-Q1.

QuarterConstructionCertificates
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
2024-Q4—CA ↗ · Arch ↗ · Eng ↗
2025-Q1—CA ↗ · Arch ↗ · Eng ↗
2025-Q216%CA ↗ · Arch ↗ · Eng ↗
2025-Q324%CA ↗ · Arch ↗ · Eng ↗
2025-Q434%CA ↗ · Arch ↗ · Eng ↗
2026-Q135%CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameNivas Promoters Private Limited
RolePromoter · current
RERA IDUPRERAPRM271708
PANAACEN1494Q
CIN / TANMRTN02207C
Name of chairmanShelendra Sharma
Registered addressPLOT NO.- 9F & 9G,KH NO.-171,2ND FLOOR, 2A, STREET NO.-3,WAZIRABAD EXTN, North Delhi, WAZIRABAD DELHI, Delhi, India, 110084
RERA contact
Registered since2023
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Gautam Budh Nagar

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
Nivas Promoters Private Limited- Collection Account for Renox ThriveBankICICI BANKBranchSector 63 NOIDABranch addressH-1/34 SECTOR-63 NOIDA 201301, GAUTAM BUDH NAGAR , UTTAR PRADESHBranch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCICIC0000816
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
Nivas Promoters Private Limited- Seperate Account for Renox ThriveBankICICI BANKBranchSector 63 NOIDABranch addressH-1/34 SECTOR -63 NOIDA 201301,GAUTAM BUDH NAGAR, UTTAR PRADEHSHBranch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCICIC0000816
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
Nivas Promoters Private Limited-Transaction Account for Renox ThriveBankICICI BANKBranchSector 63 NOIDABranch addressH-1/34 SECTOR -63 NOIDA 201301, GAUTAM BUDH NAGAR,UTTAR PRADESHBranch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCICIC0000816
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

3 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)4 (Under Registration - 2 ) → 4 (Under Registration - 1 )
changed in Estanzo’s record
18 Oct 2026
Promoter’s complaints tally (all their projects)3 (Under Registration - 1 ) → 4 (Under Registration - 2 )
changed in Estanzo’s record
13 Oct 2026
Promoter’s complaints tally (all their projects)2 (Under Registration - 0 ) → 3 (Under Registration - 1 )
changed in Estanzo’s record
11 Sept 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 18 Oct 2026 · 3 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about Renox Thrive

Is Renox Thrive RERA registered?

Yes. Renox Thrive is registered with UPRERA under registration number UPRERAPRJ742692, registered on 14 Sept 2024. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for Renox Thrive?

The completion date filed with UPRERA is 24 Apr 2029. No completion certificate is on record yet.

Who is the builder of Renox Thrive?

Nivas Promoters Private Limited is the promoter entity that filed Renox Thrive with UPRERA (promoter RERA ID UPRERAPRM271708). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does Renox Thrive have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Renox Thrive located?

Renox Thrive is registered in Sector 10, Vaidpura, Grater Noida, Gautam Budh Nagar, as filed with UPRERA.

What configurations are available in Renox Thrive?

The unit plan filed with UPRERA lists 2 BHK, 3 BHK, STUDIO, PENTHOUSE, SHOP and OTHER. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in Renox Thrive?

The approved unit plan filed with UPRERA runs from 26 to 288 m² of carpet area (about 277 to 3,100 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in Renox Thrive?

The approved unit plan describes 5 blocks and 545 units of which 531 are homes and 14 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is Renox Thrive?

About 180 units per acre: 545 planned units across 3.03 acres (12,250 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗