Construction progress

As filed in quarterly progress reports · % complete · latest filed Apr–Jun 2026
Quarters shown are calendar quarters. UP-RERA files them by financial year.
—Q3'24
—Q4'24
—Q1'25
—Q2'25
61.88%Q3'25
61.88%Q4'25
64.49%Q1'26
57%Q2'26

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ2110
Project categoryResidential
Registration typeOngoing
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryGhaziabad Development Authority
Proposed start1 Jan 2017
Original start1 Jan 2017
Project duration138 months
AddressDundahera, Ghaziabad, Ghaziabad
TehsilGhaziabad
Applicant typeCompany
Applicant addressA-19, Sector-63, Noida, Uttar Pradesh-201301
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Permit revalidated

    116/ZONE-5/2016-17

  2. 3 building permits sanctioned

  3. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  4. Registered with RERA

  5. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  6. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  7. to

    Extension granted

  8. to

    Extension granted

  9. to

    Extension granted

  10. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered27 Jul 2017
Original completion31 Mar 2022
Revised completion30 Jun 2028
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹1,00,500
Sanctioning authorityGhaziabad Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors1,209 · 2 · 34 (units from plan)
Homes · commercial units909 · 300 (shops and offices filed in the same plan)
  • OTHER589 49%
  • SHOP300 25%
  • 2 BHK252 21%
  • 3 BHK68 6%
ConfigurationUnitsCarpet area
2 BHK25255-71
OTHER58967-186
3 BHK6884
SHOP30013-16
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
TOWER 1 (FORTUNE) · 2 BHK, OTHER, 3 BHK, SHOP3475813-186
TOWER 2 (ADVANTAGE) · 2 BHK, OTHER, 3 BHK3445155-186
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Peeyush Chaudhry
License CA/93/16189
Office no- 44, Plot no- A41, The Corenthum Building, Tower B, Sector 62, Noida
Engineer
Optimum Design Pvt. Ltd.
B-24, Sector 67, Noida-201301
Contractor
Mahagun (India) Pvt. Ltd.
B66, 1st Floor, Vivek Vihar, Delhi-95
Sr.Development work declared to RERA
1Demarcation of Plots
North side-Other Plot,East sied-Other plot,South side-Residential Society,West side-Authority - Roda
2Boundary Wall
Boundary wall a combination of R.c.c, Brick wall & M.S. Railing
3Road Work
All Internal road in Concrete Paver Block
4Footpaths
All Footpaths in Sandstone
5Water Supply Including Drinking Water Facilities
Water Treatment plant is provided for drinking water
6Sewer System
Sewer line with required slope and Adequate manholes
7Drain
Adequate catch basins & Manholes are provided for surface drain
8Parks
Green area is provided with a multipurpose court
9Tree Planting
A Variety of trees is provided
10Design For Electric Supply Including Street Lighting
Sufficient Lighting as per Services & Landscape consultant
11Community Buildings
Community Building at Ground floor
12Treatment and Disposal System of Sewage and Sullage water
S.T.P. provided in Township
13Solid Waste Management And Disposal System
Provided as per Authority norms
14Water Conservation System
Rain water Harvesting Pits are provided as per Authority norms
15Energy Management System Including Use of Renewable Energy
Led Lights & Solar Water Heaters are provided as per norms
16Fire Protection And Fire Safety System
Fire Sprinklers, Smoke Detectors,F.H.C with pumps are provide as norms
17Social Infrastructure And Other Public Amenities Including Public Health Services
Facility Office ,Visitors car parking,Water treatment plant are provided as per norms
18Emergency Evacuation Services
Fire staircase in each Block / Tower & Non tower are is provided
19Other Miscellaneous Work
Jogging track, Children play area , ETC are provided
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

2 agents

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1FINDMYPROPERTY PRIVATE LIMITEDUPRERAAGT11867
2INVESTORS CLINIC INFRATECH PRIVATE LIMITEDUPRERAAGT10052
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

3 permits

An approval and the date it runs to - not proof the work matching it was done.

3 sanctioning permits are on record with UPRERA, the latest valid to 5 Sept 2021. 1 of them carries a revalidation.

Sanctioned by Ghaziabad Development Authority · 19,065 sqm of land · an approved plan of 2 blocks and 1209 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endRevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossaryDocuments filed
116/ZONE-5/2016-176 Sept 20165 Sept 20214 Sept 202431 Mar 2022—
116/ZONE-5/2016-176 Sept 20165 Sept 20214 Sept 202431 Mar 20226 Sept 2016
116/ZONE-5/2016-176 Sept 20165 Sept 20215 Sept 202430 Sept 2023—
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 4 completion extensions for this project, the latest running to 30 Jun 2028.

#Granted fromExtended uptoNote
131 Mar 202230 Sept 2022Six months extension in view of force majeure caused by covid-19 pandemic
230 Sept 202230 Sept 2023—
330 Sept 202330 Jun 2025—
430 Jun 202530 Jun 2028—

Land & documents

121 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
608376—
664243—
665217—
666230—
667480—
668492—
669130—
670294.80—
677325—
678(F)630—
679(F)890—
680(F)510—
681(F)460—
682(F)990—
683(F)630—
684(F)620—
685(F)510—
686(F)510—
687130—
690(F)1010—
691(F)1010—
692(F)1010—
693(F)890—
694(F)1140—
6951019—
696130—
6971140—
698678—
699500—
702350.17—
703350—
704300—
705430—
706359.56—
70781—
GH-03, Crossing Republik, Dundahera, Ghaziabad287Plot
GH-03, Crossing Republik, Dundahera, Ghaziabad1320.97Plot
GH-03, Crossing Republik, Dundahera, Ghaziabad556Plot
GH-03, Crossing Republik, Dundahera, Ghaziabad200Plot
GH-03, Crossing Republik, Dundahera, Ghaziabad359.56Plot
GH-03, Crossing Republik, Dundahera, Ghaziabad11969Plot
GH-03, Crossing Republik, Dundahera, Ghaziabad4500Plot
GH-03, Crossing Republik, Dundahera, Ghaziabad6180Plot
GH-03, Crossing Republik, Dundahera, Ghaziabad130Plot
GH-03, Crossing Republik, Dundahera, Ghaziabad1140Plot
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

11 registry or lease-deed filings are on this project’s record with UPRERA, the earliest dated 22 Sept 2005.

Registry no.DateTypeArea
301231 Jul 2009Own—
605022 Sept 2005Own—
671715 Oct 2005Own—
686922 Oct 2005Own—
733810 Nov 2005Own—
734410 Nov 2005Own—
501228 Jul 2016Own—
501328 Jul 2016Own—
501428 Jul 2016Own—
501528 Jul 2016Own—
501628 Jul 2016Own—
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · Registry No. 5012
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · Registry No. 5013
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · Registry No. 5014
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · Registry No. 5015
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · Registry No. 5016
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · Registry No. 3012 Part 1
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · Registry No. 3012 Part 2
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · Registry No. 6050
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · Registry No. 6717
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · Registry No. 7338
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · Registry No. 6869
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New3 Jul 2018 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New2 Jul 2018 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New2 Jul 2018 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New3 Jul 2018 ↗
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
New3 Jul 2018 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New2 Jul 2018 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New2 Jul 2018 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New2 Jul 2018 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New2 Jul 2018 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New2 Jul 2018 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New4 Jun 2018 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New4 Jun 2018 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New4 Jun 2018 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
Old12 Jan 2018 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
Old12 Jan 2018 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
Old12 Jan 2018 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
Old12 Jan 2018 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
Old12 Jan 2018 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
Old12 Jan 2018 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
Old12 Jan 2018 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
Old15 Jan 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old15 Jan 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old15 Jan 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old15 Jan 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old15 Jan 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old15 Jan 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old15 Jan 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old15 Jan 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old15 Jan 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old24 Jan 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old24 Jan 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old24 Jan 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old24 Jan 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old24 Jan 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old24 Jan 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old24 Jan 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old24 Jan 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old24 Jan 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old24 Jan 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old24 Jan 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old24 Jan 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old24 Jan 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old24 Jan 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old24 Jan 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old24 Jan 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old24 Jan 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old24 Jan 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old24 Jan 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old24 Jan 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old24 Jan 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old24 Jan 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old24 Jan 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old24 Jan 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old24 Jan 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old24 Jan 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old24 Jan 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old24 Jan 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old24 Jan 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old24 Jan 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old24 Jan 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old24 Jan 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old24 Jan 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old24 Jan 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old24 Jan 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old24 Jan 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old24 Jan 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old24 Jan 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old24 Jan 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old24 Jan 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old24 Jan 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old24 Jan 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old24 Jan 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old24 Jan 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old24 Jan 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old24 Jan 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old24 Jan 2018 ↗

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking wateryes
Fire safety (as filed with RERA)yes
Health serviceyes
Renewable energypartial

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Quarterly progress reports

25 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

25 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2026-Q1.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
2024-Q4—CA ↗ · Arch ↗ · Eng ↗
2025-Q1—CA ↗ · Arch ↗ · Eng ↗
2025-Q261.88%CA ↗ · Arch ↗ · Eng ↗
2025-Q361.88%CA ↗ · Arch ↗ · Eng ↗
2025-Q464.49%CA ↗ · Arch ↗ · Eng ↗
2026-Q157%CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameMAHAGUN (INDIA) PVT. LTD.
RolePromoter · current
RERA IDUPRERAPRM4786
PANAAACM6572A
CIN / TANU74899DL1995PTC072752
Name of chairmanMR. AMIT JAIN,C-215, VIVEK VIHAR, DELHI-110095
Registered addressA-19, Sector-63, Noida, Uttar Pradesh-201301
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Ghaziabad

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
MIPL Collection A/c for Mahagun MontageBankHDFC Bank LimitedBranchGhaziabad - VaishaliBranch addressVC-1, Sector - 1, Adj to Income Tax Office, Vaishali, GhaziabadBranch districtGhaziabad, Uttar PradeshA/C no.IFSCHDFC0000422Branch emailpawan.aneja (at) hdfcbank.com
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
MIPL Separate Bank A/c for Mahagun MontageBankHDC Bank LimitedBranchGhaziabad-VaishaliBranch addressVC-1, Sector-1, Adj to Income Tax Office, Vaishali, GhaziabadBranch districtGhaziabad, Uttar PradeshA/C no.IFSCHDFC0000422Branch emailpawan.aneja (at) hdfcbank.com
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
MIPL Rera Transaction A/c for Mahagun MontageBankHDFC Bank LimitedBranchGhaziabad-VaishaliBranch addressVC-1, Sector 1, Adj Income Tax Office, Vaishali, GhaziabadBranch districtGhaziabad, Uttar PradeshA/C no.IFSCHDFC0000422Branch emailpawan.aneja (at) hdfcbank.com
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

9 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)374 (Under Registration - 4 ) → 374 (Under Registration - 3 )
changed in Estanzo’s record
18 Oct 2026
Promoter’s complaints tally (all their projects)373 (Under Registration - 3 ) → 374 (Under Registration - 4 )
changed in Estanzo’s record
13 Oct 2026
Promoter’s complaints tally (all their projects)373 (Under Registration - 4 ) → 373 (Under Registration - 3 )
changed in Estanzo’s record
7 Oct 2026
Promoter’s complaints tally (all their projects)372 (Under Registration - 5 ) → 373 (Under Registration - 4 )
changed in Estanzo’s record
25 Sept 2026
Promoter’s complaints tally (all their projects)372 (Under Registration - 6 ) → 372 (Under Registration - 5 )
changed in Estanzo’s record
23 Sept 2026
Promoter’s complaints tally (all their projects)370 (Under Registration - 4 ) → 372 (Under Registration - 6 )
changed in Estanzo’s record
17 Sept 2026
Promoter’s complaints tally (all their projects)369 (Under Registration - 3 ) → 370 (Under Registration - 4 )
changed in Estanzo’s record
11 Sept 2026
Promoter’s complaints tally (all their projects)369 (Under Registration - 4 ) → 369 (Under Registration - 3 )
changed in Estanzo’s record
23 Aug 2026
Promoter’s complaints tally (all their projects)368 (Under Registration - 3 ) → 369 (Under Registration - 4 )
changed in Estanzo’s record
10 Aug 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 18 Oct 2026 · 9 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

Common questions about Mahagun Montage

Is Mahagun Montage RERA registered?

Yes. Mahagun Montage is registered with UPRERA under registration number UPRERAPRJ2110, registered on 27 Jul 2017. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for Mahagun Montage?

The completion date filed with UPRERA is 30 Jun 2028. No completion certificate is on record yet.

Who is the builder of Mahagun Montage?

MAHAGUN (INDIA) PVT. LTD. is the promoter entity that filed Mahagun Montage with UPRERA (promoter RERA ID UPRERAPRM4786). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted Mahagun Montage more time to complete?

UPRERA's record carries 4 completion extensions for Mahagun Montage, the latest running to 30 Jun 2028. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does Mahagun Montage have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Mahagun Montage located?

Mahagun Montage is registered in Ghaziabad, as filed with UPRERA.

What configurations are available in Mahagun Montage?

The unit plan filed with UPRERA lists 2 BHK, OTHER, 3 BHK and SHOP. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in Mahagun Montage?

The approved unit plan filed with UPRERA runs from 13 to 186 m² of carpet area (about 135 to 1,998 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in Mahagun Montage?

The approved unit plan describes 2 blocks and 1,209 units of which 909 are homes and 300 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is Mahagun Montage?

About 257 units per acre: 1,209 planned units across 4.71 acres (19,065 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗