PANCHSHEEL WELLINGTON (TOWER R7-R8) is a RERA-registered residential project by Panchsheel Buildtech Pvt. Ltd. in Ghaziabad (RERA ID UPRERAPRJ8805). Registered with a completion deadline of 30 Sept 2025.
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ8805 |
| Project category | Residential |
| Registration type | Ongoing |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Ghaziabad Development Authority |
| Proposed start | 31 Aug 2017 |
| Original start | 31 Aug 2017 |
| Project duration | 97 months |
| Address | Ghaziabad, Ghaziabad |
| Tehsil | Ghaziabad |
| Applicant type | Company |
| Applicant address | H-169 Sector 63 Noida, Gautam Buddha Nagar, U.P. |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
- valid to
Permit revalidated
272/ZONE-5/2015
2 building permits sanctioned
Registered with RERA
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
- to
Extension granted
“Six months extension in view of force majeure caused by covid-19 pandemic”
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
- to
Extension granted
- to
Extension granted
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
Completion certificate filed
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 14 Aug 2017 |
| Original completion | 31 Aug 2022 |
| Revised completion | 30 Sept 2025 |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 30 Oct 2025 |
| Registration fee | ₹43,500 |
| Sanctioning authority | Ghaziabad Development Authority |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
| Configuration | Units | Carpet area |
|---|---|---|
| 2 BHK | — | 122-301 |
| 3 BHK | — | 170 |
| SHOP | — | 162 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| R7 · 2 BHK, 3 BHK | 14 | — | 122-301 |
| R8 · 2 BHK, 3 BHK, SHOP | 15 | — | 122-301 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots yes,plot is demarcated |
| 2 | Boundary Wall not complete yet |
| 3 | Road Work Work in progress |
| 4 | Footpaths work not started yet |
| 5 | Water Supply Including Drinking Water Facilities will be provided as per sanction plan |
| 6 | Sewer System will be provided as per sanction plan |
| 7 | Drain will be provided as per sanction plan |
| 8 | Parks will be provided as per sanction plan |
| 9 | Tree Planting will be provided as per sanction plan |
| 10 | Design For Electric Supply Including Street Lighting will be provided as per sanction plan |
| 11 | Community Buildings Already constructed |
| 12 | Treatment and Disposal System of Sewage and Sullage water will be provided as per sanction plan |
| 13 | Solid Waste Management And Disposal System will be provided as per sanction plan |
| 14 | Water Conservation System will be provided as per sanction plan |
| 15 | Energy Management System Including Use of Renewable Energy will be provided as per sanction plan |
| 16 | Fire Protection And Fire Safety System will be done as per fire norms |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services NA |
| 18 | Emergency Evacuation Services will be provided as per sanction plan |
| 19 | Other Miscellaneous Work if found wil be done |
Registered agents
20 agents
Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.
| Sr. | Agent | RERA registration |
|---|---|---|
| 1 | 360 DEGREE VENTURES PRIVATE LIMITED | UPRERAAGT18728 |
| 2 | BOP REALTY PRIVATE LIMITED | UPRERAAGT10206 |
| 3 | FINDMYPROPERTY PRIVATE LIMITED | UPRERAAGT11867 |
| 4 | HARMEET SINGH | UPRERAAGT13989 |
| 5 | KARTIK INFRATOWN PRIVATE LIMITED | UPRERAAGT10413 |
| 6 | Manav Sharma | UPRERAAGT11086 |
| 7 | Maztro Consulting LLP | UPRERAAGT12053 |
| 8 | muskan realtors | UPRERAAGT10510 |
| 9 | Nishant Batra | UPRERAAGT10859 |
| 10 | PC MANTRA INFOSYSTEM PVT. LTD. | UPRERAAGT10580 |
| 11 | PROPSHOP | UPRERAAGT10129 |
| 12 | Rahul Kumar Singh | UPRERAAGT12319 |
| 13 | RAJEEV KUMAR | UPRERAAGT10524 |
| 14 | REAL HOMEZ | UPRERAAGT11572 |
| 15 | Sachin Dixit | UPRERAAGT24899 |
| 16 | SMC Real Estate Advisors Private Limited | UPRERAAGT10113 |
| 17 | SONIA HIRA | UPRERAAGT24546 |
| 18 | SOURAV CHAUDHARY | UPRERAAGT26386 |
| 19 | Trisol RED Infraventures Pvt Ltd | UPRERAAGT11579 |
| 20 | Vinod kumar bhatnagar | UPRERAAGT15345 |
Permits & extensions
2 permits
An approval and the date it runs to - not proof the work matching it was done.
2 sanctioning permits are on record with UPRERA, the latest valid to 8 Jan 2022. 1 of them carries a revalidation, valid to 8 Jan 2025.
Sanctioned by Ghaziabad Development Authority · 7,648 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | RevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossary | Documents filed |
|---|---|---|---|---|---|---|
| 272/ZONE-5/2015 | 9 Jan 2017 | 19 Jan 2021 | 31 Aug 2023 | 31 Aug 2022 | — | |
| 272/ZONE-5/2015 | 9 Jan 2017 | 8 Jan 2022 | 1 Nov 2025 | 28 Feb 2023 | 9 Jan 2017 valid to 8 Jan 2025 |
| Document | File |
|---|---|
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
UPRERA’s record carries 3 completion extensions for this project, the latest running to 30 Sept 2025.
| # | Granted from | Extended upto | Note |
|---|---|---|---|
| 1 | 31 Aug 2022 | 28 Feb 2023 | Six months extension in view of force majeure caused by covid-19 pandemic |
| 2 | 28 Feb 2023 | 27 Nov 2024 | — |
| 3 | 27 Nov 2024 | 30 Sept 2025 | — |
Land & documents
16 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 718,720 | 7305 | — |
| 720,816,815,721,718,plot 6 | 7305 | Khasra |
1 registry or lease-deed filing is on this project’s record with UPRERA, dated 23 Nov 2007.
| Registry no. | Date | Type | Area |
|---|---|---|---|
| 6617 | 23 Nov 2007 | self | — |
| Sale deed · 6617 The registered deed by which the promoter bought the land. | PDF ↗ |
| Khatauni extract · 1426-1431 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1426-1431 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1426-1431 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1426-1431 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1426-1431 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1426-1431 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | not reported | — |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | not reported | — |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | not reported | — |
| Water supply plan How the project proposed to supply water, as filed at registration. | not reported | — |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | not reported | — |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | not reported | — |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | not reported | — |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 31 Jul 2018 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 31 Jul 2018 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 31 Jul 2018 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 31 Jul 2018 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 31 Jul 2018 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 9 Aug 2017 ↗ |
Quarterly progress reports
20 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
20 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2024-Q4.
| Quarter | Construction | Certificates |
|---|---|---|
| 2020-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | Panchsheel Buildtech Pvt. Ltd. |
| Role | Promoter · current |
| RERA ID | UPRERAPRM6558 |
| PAN | AAECP3492N |
| CIN / TAN | U45200DL2006PTC156772 |
| Name of chairman | Mr. Ashok Chaudhary |
| Registered address | H-169 Sector 63 Noida, Gautam Buddha Nagar, U.P. |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Ghaziabad
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| Bank account as filed | PANCHSHEEL BUILDTECH PVT. LTD. WELLINGTON TOWER 7 & 8 - RERA A/CBankKOTAK MAHINDRA BANKBranchKOTAK MAHINDRA BANK SECTOR-63 NOIDAA/C no.IFSCKKBK0000180 |
What has changed on this record
8 movements
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Promoter’s complaints tally (all their projects) | 286 (Under Registration - 4 ) → 286 (Under Registration - 3 ) changed in Estanzo’s record | 3 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 285 (Under Registration - 4 ) → 286 (Under Registration - 4 ) changed in Estanzo’s record | 29 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 285 (Under Registration - 5 ) → 285 (Under Registration - 4 ) changed in Estanzo’s record | 23 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 284 (Under Registration - 4 ) → 285 (Under Registration - 5 ) changed in Estanzo’s record | 19 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 283 (Under Registration - 3 ) → 284 (Under Registration - 4 ) changed in Estanzo’s record | 13 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 281 (Under Registration - 1 ) → 283 (Under Registration - 3 ) changed in Estanzo’s record | 31 Aug 2026 |
| Promoter’s complaints tally (all their projects) | 281 (Under Registration - 2 ) → 281 (Under Registration - 1 ) changed in Estanzo’s record | 23 Aug 2026 |
| Promoter’s complaints tally (all their projects) | 281 (Under Registration - 3 ) → 281 (Under Registration - 2 ) changed in Estanzo’s record | 16 Aug 2026 |
| Promoter’s complaints tally (all their projects) | changed in Estanzo’s record · 3 Oct 2026 · 8 movements on record |
What to verify and what to ask
1 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about PANCHSHEEL WELLINGTON (TOWER R7-R8)
Is PANCHSHEEL WELLINGTON (TOWER R7-R8) RERA registered?
Yes. PANCHSHEEL WELLINGTON (TOWER R7-R8) is registered with UPRERA under registration number UPRERAPRJ8805, registered on 14 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.
Has PANCHSHEEL WELLINGTON (TOWER R7-R8) been completed?
UPRERA still lists PANCHSHEEL WELLINGTON (TOWER R7-R8) as Registered, so it is not shown as completed here. A completion certificate dated 30 Oct 2025 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.
Who is the builder of PANCHSHEEL WELLINGTON (TOWER R7-R8)?
Panchsheel Buildtech Pvt. Ltd. is the promoter entity that filed PANCHSHEEL WELLINGTON (TOWER R7-R8) with UPRERA (promoter RERA ID UPRERAPRM6558). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Has UPRERA granted PANCHSHEEL WELLINGTON (TOWER R7-R8) more time to complete?
UPRERA's record carries 3 completion extensions for PANCHSHEEL WELLINGTON (TOWER R7-R8), the latest running to 30 Sept 2025. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.
Does PANCHSHEEL WELLINGTON (TOWER R7-R8) have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is PANCHSHEEL WELLINGTON (TOWER R7-R8) located?
PANCHSHEEL WELLINGTON (TOWER R7-R8) is registered in Ghaziabad, as filed with UPRERA.
What configurations are available in PANCHSHEEL WELLINGTON (TOWER R7-R8)?
The unit plan filed with UPRERA lists 2 BHK, 3 BHK and SHOP. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in PANCHSHEEL WELLINGTON (TOWER R7-R8)?
The approved unit plan filed with UPRERA runs from 122 to 301 m² of carpet area (about 1,315 to 3,235 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗