MEHROTRA GOLF RESIDENCES is a RERA-registered residential project by MEHROTRA DEVELOPERS in Moradabad (RERA ID UPRERAPRJ252637). Registered with a completion deadline of 14 Nov 2024.
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ252637 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Moradabad Development Authority |
| Proposed start | 15 Nov 2020 |
| Project duration | 48 months |
| Address | Moradabad, Moradabad |
| Tehsil | Moradabad |
| Applicant type | Partnership Firm |
| Applicant address | MEHROTRA HOUSE,OPP CIRCUIT HOUSE,NIRYAT NAGAR,DELHI ROAD,MORADABAD 244001 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
MAP20190726112910337
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion certificate filed
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 17 Feb 2021 |
| Original completion | 14 Nov 2024 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 28 Aug 2024 |
| Registration fee | ₹1,72,000 |
| Sanctioning authority | Moradabad Development Authority |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots DR. KHARE HOSPITAL BUILDING IN EAST,CONTAINER DEPOT IN WEST,SATSANG BHAWAN IN NORTH AND VACANT FARMERS LAND IN SOUTH |
| 2 | Boundary Wall ONGOING CONSTRUCTION ON SITE,BOUNDRY WALL IS UPTO 13 FT. IN HEIGHT |
| 3 | Road Work SURVEY AND MARKING DONE. INNER ROADS ARE 12 M WIDE ,9M WIDE AND 7.5M WIDE |
| 4 | Footpaths FOOTPATHS ARE 2.5M WIDE PROPOSED BY ARCHITECT |
| 5 | Water Supply Including Drinking Water Facilities WATER SUPPLY WILL BE PROVIDED BY DEVELOPER THROUGH PUMP ROOM |
| 6 | Sewer System SEWER SYSTEM WILL BE PROVIDED BY DEVELOPER AND STP SYSTEM IS ALSO PROPOSED BY DEVELOPER |
| 7 | Drain DRAINAGE LINES ARE PROVIDED BY DEVELOPER WITH MANHOLES AND INSPECTION CHAMBER.STP IS PROPOSED BY DEVELOPER |
| 8 | Parks LAND HAS BEEN RESERVED FOR PARKS AS PER LAYOUT . GREEN AREA AND TREE PLANTING WILL BE PROVIDED BY DEVELOPER IN PARKS AND PARKS WILL BE CONSTRUCTED ON SITE AS PER APPROVED LAYOUT. |
| 9 | Tree Planting TREE PLANTING WILL BE DONE ALONG THE ROADS AND TREE PLANTING WILL BE PROVIDED BY DEVELOPER |
| 10 | Design For Electric Supply Including Street Lighting DRAWINGS ARE ATTACHED AS PER PROVIDED BY ELECTRIC CONSULTANT.SOLAR PLAN HAS BEEN PROPOSED FOR STREET LIGHTS. |
| 11 | Community Buildings N/A |
| 12 | Treatment and Disposal System of Sewage and Sullage water ETP SYSTEM HAS BEEN PROPOSED BY DEVELOPER FOR TREATMENT AND DISPOSAL SYSTEM OF SEWAGE AND SULLAGE WATER |
| 13 | Solid Waste Management And Disposal System TO BE EXECUTED ON SITE AS PER DRAWINGS UPLOADED AND WILL BE PROVIDED BY DEVELOPER AS PER REQUIREMENT |
| 14 | Water Conservation System RAIN WATER HARVESTING TANKS WILL BE CONSTRUCTED ON SITE FOR WATER CONSERVATION |
| 15 | Energy Management System Including Use of Renewable Energy N/A |
| 16 | Fire Protection And Fire Safety System N/A |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services N/A |
| 18 | Emergency Evacuation Services N/A |
| 19 | Other Miscellaneous Work TO BE EXECUTED ON SITE AS PER SANCTION PLAN |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 19 Mar 2025.
Sanctioned by Moradabad Development Authority · 33,351 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| MAP20190726112910337 | 20 Mar 2020 | 19 Mar 2025 | 18 Mar 2026 | 14 Nov 2024 |
| Document | File |
|---|---|
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
Land & documents
22 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 801 | 1710 | Khasra |
| 802 | 2600 | Khasra |
| 803 | 1830 | Khasra |
| 828 | 3550 | Khasra |
| 835 | 7160 | Khasra |
| 835 | 7160 | Khasra |
| 835 | 7150 | Khasra |
| 835 | 7160 | Khasra |
| Registry document · 1767 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 2285 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 5008 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 2457 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 4468 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 4471 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 4474 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 4472 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 4470 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Khatauni extract · 1413-1418 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1417-1422 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Registry document · 4473 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · MOR/0005286 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · MOR/0005286 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 1 Jan 2021 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 1 Jan 2021 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 1 Jan 2021 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 1 Jan 2021 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 1 Jan 2021 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 1 Jan 2021 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 1 Jan 2021 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 1 Jan 2021 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 2 Feb 2021 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 18 Jan 2021 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 18 Jan 2021 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 4 Feb 2021 ↗ |
Quarterly progress reports
17 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
17 quarterly progress reports are on file with UPRERA, covering 2020-Q3 to 2024-Q3.
| Quarter | Construction | Certificates |
|---|---|---|
| 2020-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | MEHROTRA DEVELOPERS |
| Role | Promoter · current |
| RERA ID | UPRERAPRM125668 |
| PAN | ABMFM1397B |
| CIN / TAN | ABMFM1397B |
| Registered address | MEHROTRA HOUSE,OPP CIRCUIT HOUSE,NIRYAT NAGAR,DELHI ROAD,MORADABAD 244001 |
| RERA contact | |
| Registered since | 2020 |
Nearby projects
Moradabad
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
2 of the 3 account headings UPRERA publishes are filed for this project: collection and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | MEHROTRA DEVELOPERS PROJECT MEHROTRA GOLF RESIDENCEBankAXIS BANKBranchCIVIL LINESBranch address8/10/6 SARAI KHALSA,CIVIL LINES,NEAR HEAD POST OFFICE MORADABADBranch districtMoradabad, Uttar PradeshA/C no.IFSCUTIB0000282 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | MEHROTRA DEVELOPERSBankAXIS BANKBranchCIVIL LINESBranch address8/10/6 SARAI KHALSA,CIVIL LINES,NEAR HEAD POST OFFICE,MORADABADBranch districtMoradabad, Uttar PradeshA/C no.IFSCUTIB0000282 |
What has changed on this record
nothing recorded yet
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.What to verify and what to ask
2 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about MEHROTRA GOLF RESIDENCES
Is MEHROTRA GOLF RESIDENCES RERA registered?
Yes. MEHROTRA GOLF RESIDENCES is registered with UPRERA under registration number UPRERAPRJ252637, registered on 17 Feb 2021. Estanzo reproduces that filing; it does not verify the work behind it.
Has MEHROTRA GOLF RESIDENCES been completed?
UPRERA still lists MEHROTRA GOLF RESIDENCES as Registered, so it is not shown as completed here. A completion certificate dated 28 Aug 2024 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.
Who is the builder of MEHROTRA GOLF RESIDENCES?
MEHROTRA DEVELOPERS is the promoter entity that filed MEHROTRA GOLF RESIDENCES with UPRERA (promoter RERA ID UPRERAPRM125668). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does MEHROTRA GOLF RESIDENCES have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is MEHROTRA GOLF RESIDENCES located?
MEHROTRA GOLF RESIDENCES is registered in Moradabad, as filed with UPRERA.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗