MIGSUN LUCKNOW CENTRAL is a RERA-registered commercial project by WILMOT INFRATECH PRIVATE LIMITED in SECTOR-A, Lucknow (RERA ID UPRERAPRJ589752). Registered with a completion deadline of 10 Jan 2029.
RERA status as reported: Registered.Construction progress
Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ589752 |
| Project category | Commercial |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Lucknow Development Authority |
| Proposed start | 15 Feb 2024 |
| Project duration | 59 months |
| Address | SECTOR - A, POCKET - 1, SSITUATED AT SHUSHANT GOLF CITY, SULTAN ROAD, LUCKNOW, UTTAR PRADESH - 229010, SECTOR-A, Lucknow, Lucknow |
| Tehsil | Lucknow |
| Applicant type | Company |
| Applicant address | COMMERCIAL PLOT NO SECTOR A POCKET 1 AT SUSHANT GOLF CITY SULTANPUR ROAD, LUCKNOW (UP) PIN CODE 229010 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
- valid to
Permit revalidated
Commercial Building/09938/LDA/BP/23-24/2230/03112023
2 building permits sanctioned
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 4 Apr 2024 |
| Original completion | 10 Jan 2029 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹2,13,000 |
| Sanctioning authority | Lucknow Development Authority |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
- SHOP1,194 45%
- STUDIO988 37%
- Office Space396 15%
- OTHER68 3%
| Configuration | Units | Carpet area |
|---|---|---|
| SHOP | 1,194 | 6-61 |
| Office Space | 396 | 16-80 |
| OTHER | 68 | 8-32 |
| STUDIO | 988 | 16-43 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| Block A · SHOP, OTHER, STUDIO | 14 | 1,586 | 6-60 |
| Block B · SHOP, Office Space | 7 | 281 | 6-55 |
| Block C · Office Space, SHOP | 13 | 395 | 8-74 |
| Block D · SHOP, Office Space | 13 | 384 | 6-80 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots designated plot nis demarcated as per the Lease Plan issued by the Authority |
| 2 | Boundary Wall By Land Scaping |
| 3 | Road Work 6.0 Meter wide Fire Tender Path |
| 4 | Footpaths 2.00 meter wide footpath will be provided near by entry point |
| 5 | Water Supply Including Drinking Water Facilities Municipal water supply is used for the drinking purpose |
| 6 | Sewer System It will be used with STP and its size will be Approx 300 KLD |
| 7 | Drain Separate drainage line has been used. Rain water and Waste water will be run through the separate PVC pipes to the STP and RWH respectively. |
| 8 | Parks Separate Park is not Required, there are some places will be provided like landscape area. |
| 9 | Tree Planting Approx 211 Number of trees will be planted. |
| 10 | Design For Electric Supply Including Street Lighting Electric Supply and Street Lighting has been provided as per the layout plan and local authority norms |
| 11 | Community Buildings NA |
| 12 | Treatment and Disposal System of Sewage and Sullage water Disposal system of sewage and sullage water is being used through STP which will be used for land scape and flushing purpose. |
| 13 | Solid Waste Management And Disposal System all the solid waste management as per the biodegradable waste converted into composed and non biodegradable delivered to registered agency |
| 14 | Water Conservation System Low flow water mixture being used for water conservation and STP water will be used for landscape and flushing purpose |
| 15 | Energy Management System Including Use of Renewable Energy Specific U-value glass has been used for energy management and for roof insulation light color tiles will be used for renewable energy solar photovoltaic energy has been used for common area |
| 16 | Fire Protection And Fire Safety System Fire System and Fire Safety system will be installed in the building as per NBC norms |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services Social infrastructure and other public amenities including public health services will be provided. |
| 18 | Emergency Evacuation Services As per the environment and management plan and Disaster management plan all provisions are made including assembly points |
| 19 | Other Miscellaneous Work As per the layout plan and requirement |
Registered agents
8 agents
Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.
| Sr. | Agent | RERA registration |
|---|---|---|
| 1 | 360 REALTORS LLP | UPRERAAGT10868 |
| 2 | BOP REALTY PRIVATE LIMITED | UPRERAAGT10206 |
| 3 | MORES TECHNO PRIVATE LIMITED | UPRERAAGT25307 |
| 4 | PROPSHOP | UPRERAAGT10129 |
| 5 | REALTY ASSISTANT PRIVATE LIMITED (Formerly REALTY ASSISTANTS HUB PVT LTD) | UPRERAAGT18286 |
| 6 | SANGEETA LOCWANI | UPRERAAGT23899 |
| 7 | SeedWill Consulting Private Limited | UPRERAAGT15794 |
| 8 | WEALTH CLINIC PRIVATE LIMITED | UPRERAAGT10521 |
Permits & extensions
2 permits
An approval and the date it runs to - not proof the work matching it was done.
2 sanctioning permits are on record with UPRERA, the latest valid to 14 Jan 2029. 1 of them carries a revalidation, valid to 28 Apr 2031.
Sanctioned by Lucknow Development Authority · 20,239 sqm of land · an approved plan of 4 blocks and 2646 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | RevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossary | Documents filed |
|---|---|---|---|---|---|---|
| LDA/BP/23-24/2230 | 15 Jan 2024 | 14 Jan 2029 | 13 Jan 2031 | 10 Jan 2029 | — | |
| Commercial Building/09938/LDA/BP/23-24/2230/03112023 | 15 Jan 2024 | 14 Jan 2029 | 28 Apr 2034 | 10 Jan 2029 | 15 Jan 2024 valid to 28 Apr 2031 |
| Document | File |
|---|---|
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
Land & documents
23 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| SECTOR-A, POCKET-1 | 20238.63 | Plot |
| Sale deed · 29507 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 29507 The registered deed by which the promoter bought the land. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | not reported | — |
| Water supply plan How the project proposed to supply water, as filed at registration. | not reported | — |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | not reported | — |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | not reported | — |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | not reported | — |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | not reported | — |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 17 Jan 2024 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 17 Jan 2024 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 11 Mar 2024 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 17 Jan 2024 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 3 Feb 2024 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 3 Feb 2024 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 3 Feb 2024 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 17 Jan 2024 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 23 Feb 2024 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 5 Feb 2024 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 17 Jan 2024 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 5 Feb 2024 ↗ |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | New | 5 Feb 2024 ↗ |
| Agreement for sale (proforma) The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind. | New | 17 Jan 2024 ↗ |
Quarterly progress reports
10 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
10 quarterly progress reports are on file with UPRERA, covering 2023-Q4 to 2026-Q1.
| Quarter | Construction | Certificates |
|---|---|---|
| 2023-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q2 | 15.48% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q3 | 5% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q4 | 26.7% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q1 | 29.48% | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | WILMOT INFRATECH PRIVATE LIMITED |
| Role | Promoter · current |
| RERA ID | UPRERAPRM275048 |
| PAN | AACCN1468L |
| CIN / TAN | U68100DL2005PTC139310 |
| Name of chairman | Surender Kumar Arora |
| Registered address | COMMERCIAL PLOT NO SECTOR A POCKET 1 AT SUSHANT GOLF CITY SULTANPUR ROAD, LUCKNOW (UP) PIN CODE 229010 |
| RERA contact | |
| Registered since | 2024 |
Nearby projects
Lucknow
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | WIPL - COLLECTION ACCOUNT MIGSUN LUCKNOW CENTRALBankICICI BANKBranchSUSHANT GOLF CITY LUCKNOWBranch addressSHOP NO 3 FELIX SQUARE SUSHANT GOLF CITY SULTANPUR ROAD LUCKNOW 226030Branch districtLucknow, Uttar PradeshA/C no.IFSCICIC0007407Branch emailamit.kumarsrivastavaaticicibank.com |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | WIPL SEPARATE BANK ACCOUNT MIGSUN LUCKNOW CENTRALBankICICI BANKBranchSUSHANT GOLF CITY LUCKNOWBranch addressSHOP NO 3 FELIX SQUARE SUSHANT GOLF CITY SULTANPUR ROAD LUCKNOWBranch districtLucknow, Uttar PradeshA/C no.IFSCICIC0007407Branch emailamit.kumarsrivastavaaticicibank.com |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | WIPL - RERA TRANSACTION A/C MIGSUN LUCKNOW CENTRALBankICICI BANKBranchSUSHANT GOLF CITY LUCKNOWBranch addressSHOP NO 3 FELIX SQUARE SUSHANT GOLF CITY SULTANPUR ROAD LUCKNOW 226030Branch districtLucknow, Uttar PradeshA/C no.IFSCICIC0007407Branch emailamit.kumarsrivastavaaticicibank.com |
What has changed on this record
2 movements
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Promoter’s complaints tally (all their projects) | 7 (Under Registration - 1 ) → 7 (Under Registration - 0 ) changed in Estanzo’s record | 9 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 6 (Under Registration - 0 ) → 7 (Under Registration - 1 ) changed in Estanzo’s record | 3 Sept 2026 |
| Promoter’s complaints tally (all their projects) | changed in Estanzo’s record · 9 Oct 2026 · 2 movements on record |
What to verify and what to ask
1 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about MIGSUN LUCKNOW CENTRAL
Is MIGSUN LUCKNOW CENTRAL RERA registered?
Yes. MIGSUN LUCKNOW CENTRAL is registered with UPRERA under registration number UPRERAPRJ589752, registered on 4 Apr 2024. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for MIGSUN LUCKNOW CENTRAL?
The completion date filed with UPRERA is 10 Jan 2029. No completion certificate is on record yet.
Who is the builder of MIGSUN LUCKNOW CENTRAL?
WILMOT INFRATECH PRIVATE LIMITED is the promoter entity that filed MIGSUN LUCKNOW CENTRAL with UPRERA (promoter RERA ID UPRERAPRM275048). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does MIGSUN LUCKNOW CENTRAL have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is MIGSUN LUCKNOW CENTRAL located?
MIGSUN LUCKNOW CENTRAL is registered in SECTOR-A, Lucknow, as filed with UPRERA.
What configurations are available in MIGSUN LUCKNOW CENTRAL?
The unit plan filed with UPRERA lists SHOP, Office Space, OTHER and STUDIO. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in MIGSUN LUCKNOW CENTRAL?
The approved unit plan filed with UPRERA runs from 6 to 80 m² of carpet area (about 66 to 860 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
How many towers and units are planned in MIGSUN LUCKNOW CENTRAL?
The approved unit plan describes 4 blocks and 2,646 units of which 1,056 are homes and 1,590 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is MIGSUN LUCKNOW CENTRAL?
About 529 units per acre: 2,646 planned units across 5.00 acres (20,239 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗