NAARAYAN AVENUE is a RERA-registered residential project by RJ INFRA HOMES PRIVATE LIMITED in Agra (RERA ID UPRERAPRJ497764). Registered with a completion deadline of 31 Mar 2027.
RERA status as reported: Registered.Construction progress
Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ497764 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Agra Development Authority |
| Proposed start | 1 Jul 2022 |
| Project duration | 57 months |
| Address | Agra |
| Applicant type | Company |
| Applicant address | G-15, RAMAN TOWER SANJAY PLACE AGRA Agra UP 282002 IN |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Permit revalidated
Plotted Resi development/Plotted Housing/02541/ADA/LD/21-22/13223/21032022
2 building permits sanctioned
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion certificate filed
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 25 Jul 2022 |
| Original completion | 31 Mar 2027 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 29 Sept 2026 |
| Registration fee | ₹89,500 |
| Sanctioning authority | Agra Development Authority |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots All the plots will be demarcated as per the approved layout as per the orientation and direction. The size and alignment of the plots will be measured by the state of art equipment. |
| 2 | Boundary Wall A 6 to 8 feet high brick wall will be constructed along the applicable boundary of he project. The wall will be cemented through brick and mortar. The will will be plastered and painted. The foundation of the wall and the wind cracks will be provided to make the wall weather and earthquake resistant. |
| 3 | Road Work The road works will be done with suitable wearing course of bituminous layer and paver blocks. The top and wearing course will be laid over compacted earth and granular layer providing the anti skid surface to cater for the the projects traffic. The roads are 9m and 7.5 m wide covering total of 6448sq.m |
| 4 | Footpaths The paver blocks will be laid over the compacted earth and the sand bed along all the suitable areas and the periphery of the parks. The M-15 grade blocks will cater for the walking . 1m wide approx 2000sq.m |
| 5 | Water Supply Including Drinking Water Facilities The ground water will be pumped to the overhead tank. The potable water will be supplied through underground pipelines to the individual units for the purpose of domestic use. The submersible pump will be installed with back up to provide the continuous supply of water as per demand. The capacity of water tank is 100000 ltr. |
| 6 | Sewer System the underground sewer line will be constructed to cater for domestic sewer through the man holes and inspection chambers. The sewer lie will be sloped and designed to assure continuous discharge of sewer to the Sewage treatment plant |
| 7 | Drain the Lined and covered drains will be constructed will be constructed to cater for the rainwater and domestic waste. the drains will be designed for the smooth and rapid egress of the drain water |
| 8 | Parks The ltwo ush green parks will be prepared enhancing the greenery and the beauty of the project. The parks will be as per the suitable landscape providing the play area for kids and sitting areas for the elderly. The total area under parks is 2532sq,m approximately/ |
| 9 | Tree Planting The variety of the trees will be planted to provide the greenery and the shade within the project. The trees planted will have long life and all weather suitability. the trees will be planted along the park periphery and the boundary wall at suitable locations |
| 10 | Design For Electric Supply Including Street Lighting The dedicated transformer will be installed for the projects domestic needs. The electric current will be distributed through distribution boxes and electrical poles. All the units will be provided with connection points for the domestic usage of electricity |
| 11 | Community Buildings Not Applicable |
| 12 | Treatment and Disposal System of Sewage and Sullage water The state of art sewage treatment plant will be constructed for the the project to cater the domestic sewage. the sewage will be treated through multiple stages to bring the effluents within permissible limits before being disposed to the designated municipal corporation area or sewer line. The STP will be of 100KLD |
| 13 | Solid Waste Management And Disposal System A dalab ghar will be constructed for the solid waste management. The dustbins will also be installed at all required location to assist the collection of solid waste and the easy disposal of the same. The dalab ghar is approximately 33sqm |
| 14 | Water Conservation System A minimum 10m deep bore will be constructed using the perforated pipes and the collection chamber having the multilayer filtration to help recharge the the water table. There will two harvesting pits one of 150KLH and one of 100KLH. |
| 15 | Energy Management System Including Use of Renewable Energy Not Applicable |
| 16 | Fire Protection And Fire Safety System Not Applicable |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services Not Applicable |
| 18 | Emergency Evacuation Services Not Applicable |
| 19 | Other Miscellaneous Work All the necessary works will be done for the betterment of the project |
Permits & extensions
2 permits
An approval and the date it runs to - not proof the work matching it was done.
2 sanctioning permits are on record with UPRERA, the latest valid to 1 Apr 2027. 1 of them carries a revalidation.
Sanctioned by Agra Development Authority · 16,841 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | RevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossary | Documents filed |
|---|---|---|---|---|---|---|
| Plotted Resi development/ Plotted Housing/ 02541/ADA/LD/21-22/1323/21032022 | 2 Apr 2022 | 1 Apr 2027 | 31 Mar 2030 | 31 Mar 2027 | — | |
| Plotted Resi development/Plotted Housing/02541/ADA/LD/21-22/13223/21032022 | 2 Apr 2022 | 1 Apr 2027 | 31 Mar 2030 | 31 Mar 2027 | 2 Apr 2022 |
| Document | File |
|---|---|
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
Land & documents
16 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 30(m) | 18483 | Khasra |
| Registry document · 13346 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Khatauni extract · 1424-1429 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 9 Jun 2022 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 9 Jun 2022 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 9 Jun 2022 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 9 Jun 2022 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 9 Jun 2022 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 9 Jun 2022 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 9 Jun 2022 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 9 Jun 2022 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 10 Jun 2022 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 9 Jun 2022 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 9 Jun 2022 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 9 Jun 2022 ↗ |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | New | 4 Jul 2022 ↗ |
Quarterly progress reports
17 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
17 quarterly progress reports are on file with UPRERA, covering 2022-Q2 to 2026-Q2.
| Quarter | Construction | Certificates |
|---|---|---|
| 2022-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q2 | 19% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q3 | 19% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q4 | 43% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q1 | 43% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | RJ INFRA HOMES PRIVATE LIMITED |
| Role | Promoter · current |
| RERA ID | UPRERAPRM166687 |
| PAN | AAGCR0328D |
| CIN / TAN | U45400UP2012PTC052297 |
| Name of chairman | Mukesh Kumar Agrawal |
| Registered address | G-15, RAMAN TOWER SANJAY PLACE AGRA Agra UP 282002 IN |
| RERA contact | |
| Registered since | 2022 |
Nearby projects
Agra
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | RJ Infra Homes Collection Account for Naarayan AvenueBankCanara BankBranchSME Branch, AgraBranch addressKamla Nagar, AgraBranch districtAgra, Uttar PradeshA/C no.IFSCCNRB0018815 |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | RJ Infra Homes Separate Bank Account for Naarayan AvenueBankCanara BankBranchSME,AgraBranch addressKamla Nagar, AgraBranch districtAgra, Uttar PradeshA/C no.IFSCCNRB0018815 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | RJ Infra Homes Transaction Account For Naarayan AvenueBankCanara BankBranchSME,AgraBranch addressKamla Nagar, AgraBranch districtAgra, Uttar PradeshA/C no.IFSCCNRB0018815 |
What has changed on this record
3 movements
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Quarterly progress report 2026-Q2 | QPR 2026-Q2 newly filed with RERA | 15 Oct 2026 |
| Latest completion certificate filed on | 2026-09-29 first recorded by Estanzo | 3 Oct 2026 |
| Completion date recorded | 2026-09-29 first recorded by Estanzo | 3 Oct 2026 |
| Latest completion certificate filed on | first recorded by Estanzo · 3 Oct 2026 |
What to verify and what to ask
2 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about NAARAYAN AVENUE
Is NAARAYAN AVENUE RERA registered?
Yes. NAARAYAN AVENUE is registered with UPRERA under registration number UPRERAPRJ497764, registered on 25 Jul 2022. Estanzo reproduces that filing; it does not verify the work behind it.
Has NAARAYAN AVENUE been completed?
UPRERA still lists NAARAYAN AVENUE as Registered, so it is not shown as completed here. A completion certificate dated 29 Sept 2026 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.
Who is the builder of NAARAYAN AVENUE?
RJ INFRA HOMES PRIVATE LIMITED is the promoter entity that filed NAARAYAN AVENUE with UPRERA (promoter RERA ID UPRERAPRM166687). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does NAARAYAN AVENUE have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is NAARAYAN AVENUE located?
NAARAYAN AVENUE is registered in Agra, as filed with UPRERA.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗