Navyug Tower-15 (Phase-3)

UPRERARegistered

Navyug Tower-15 (Phase-3) is a RERA-registered residential project by New Modern Buildwell Private Limited in Prayagraj (RERA ID UPRERAPRJ17474). Registered with a completion deadline of 29 Feb 2024.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ17474
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryAllahabad Development Authority
Proposed start1 Sept 2018
Project duration66 months
AddressAllahabad **, Prayagraj
TehsilAllahabad **
Applicant typeCompany
Applicant address819, ANTRIKSH BHAWAN, 22 K.G MARG, NEW DELHI-110001
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. valid to

    Permit revalidated

    184/Pra/Aa.(Ta.Sa.-2)Zone-1/Revise/2017-18

  2. 2 building permits sanctioned

  3. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  4. Registered with RERA

  5. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  6. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  7. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered4 Sept 2018
Original completion30 Aug 2023
Revised completion29 Feb 2024
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹10,500
Sanctioning authorityAllahabad Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors104 · 1 · 17 (units from plan)
  • STUDIO52 50%
  • 1 BHK26 25%
  • 2 BHK26 25%
ConfigurationUnitsCarpet area
1 BHK2642
2 BHK2654-61
STUDIO5222-28
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
T-15 · 1 BHK, 2 BHK, STUDIO, OTHER1710422-61
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
REPL
License CA/20111-54048
A6, Sector 58, Noida -201301
Engineer
REPL
A6, Sector 58, Noida -201301
Contractor
Zed R 18 Realcon Pvt Ltd
K-80/2, A Sangam Vihar, New Delhi
Sr.Development work declared to RERA
1Demarcation of Plots
NA
2Boundary Wall
NA
3Road Work
Yes
4Footpaths
Yes
5Water Supply Including Drinking Water Facilities
Yes
6Sewer System
Yes
7Drain
Yes
8Parks
Yes
9Tree Planting
Yes
10Design For Electric Supply Including Street Lighting
Yes
11Community Buildings
No
12Treatment and Disposal System of Sewage and Sullage water
Yes
13Solid Waste Management And Disposal System
Yes
14Water Conservation System
No
15Energy Management System Including Use of Renewable Energy
Yes
16Fire Protection And Fire Safety System
Yes
17Social Infrastructure And Other Public Amenities Including Public Health Services
No
18Emergency Evacuation Services
No
19Other Miscellaneous Work
Yes
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

10 agents

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1ABHAY PRATAP SINGHUPRERAAGT10207
2ADITYA KATYALUPRERAAGT13148
3ALMIGHTY INFRAESTATE PVT LTDUPRERAAGT10163
4ASHOK KUMAR KUSHWAHAUPRERAAGT14495
5DHARMENDRA KUMAR PANDEYUPRERAAGT10923
6GOLDEN STAR REAL ESTATESUPRERAAGT10303
7LINK PROPERTIESUPRERAAGT10081
8PROPERTY JUNCTION PRIVATE LIMITEDUPRERAAGT12902
9PROPSHOPUPRERAAGT10129
10SQUARE YARDS CONSULTING PRIVATE LIMITEDUPRERAAGT10119
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

2 permits

An approval and the date it runs to - not proof the work matching it was done.

2 sanctioning permits are on record with UPRERA, the latest valid to 30 Aug 2023. 1 of them carries a revalidation, valid to 30 Aug 2026.

Sanctioned by Allahabad Development Authority · 1,015 sqm of land · an approved plan of 1 block and 104 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endRevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossaryDocuments filed
184/Pra.Aa.(Ta. no-2)/Zone-1/revise/2017-1831 Aug 201830 Aug 202330 Aug 202630 Aug 2023—
184/Pra/Aa.(Ta.Sa.-2)Zone-1/Revise/2017-1831 Aug 201830 Aug 20236 Jun 202429 Feb 202431 Aug 2018
valid to 30 Aug 2026
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 1 completion extension for this project, running to 29 Feb 2024.

#Granted fromExtended uptoNote
130 Aug 202329 Feb 2024Six months extension in view of force majeure caused by covid-19 pandemic

Land & documents

14 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
831015Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Khatauni extract · 1421-1426
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
not reported—
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
not reported—
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
not reported—
Water supply plan
How the project proposed to supply water, as filed at registration.
not reported—
Electricity supply plan
How the project proposed to supply power, as filed at registration.
not reported—
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
not reported—
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
not reported—
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
not reported—
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New4 Sept 2018 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New4 Sept 2018 ↗

Quarterly progress reports

16 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

16 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2023-Q4.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameNew Modern Buildwell Private Limited
RolePromoter · current
RERA IDUPRERAPRM2781
PANAACCN2807P
CIN / TANU45201DL2005PTC138573
Name of chairmanPradeep Misra
Registered address819, ANTRIKSH BHAWAN, 22 K.G MARG, NEW DELHI-110001
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Prayagraj

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
New Modern Buildwell Pvt. Ltd.BankHDFC BankBranchGole Market New DelhiA/C no.IFSCHDFC0000584
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about Navyug Tower-15 (Phase-3)

Is Navyug Tower-15 (Phase-3) RERA registered?

Yes. Navyug Tower-15 (Phase-3) is registered with UPRERA under registration number UPRERAPRJ17474, registered on 4 Sept 2018. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for Navyug Tower-15 (Phase-3)?

The completion date filed with UPRERA is 29 Feb 2024. No completion certificate is on record yet.

Who is the builder of Navyug Tower-15 (Phase-3)?

New Modern Buildwell Private Limited is the promoter entity that filed Navyug Tower-15 (Phase-3) with UPRERA (promoter RERA ID UPRERAPRM2781). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted Navyug Tower-15 (Phase-3) more time to complete?

UPRERA's record carries 1 completion extension for Navyug Tower-15 (Phase-3), the latest running to 29 Feb 2024. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does Navyug Tower-15 (Phase-3) have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Navyug Tower-15 (Phase-3) located?

Navyug Tower-15 (Phase-3) is registered in Prayagraj, as filed with UPRERA.

What configurations are available in Navyug Tower-15 (Phase-3)?

The unit plan filed with UPRERA lists 1 BHK, 2 BHK, STUDIO and OTHER. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in Navyug Tower-15 (Phase-3)?

The approved unit plan filed with UPRERA runs from 22 to 61 m² of carpet area (about 236 to 656 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in Navyug Tower-15 (Phase-3)?

The approved unit plan describes 1 block and 104 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is Navyug Tower-15 (Phase-3)?

About 415 units per acre: 104 planned units across 0.25 acres (1,015 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗