Oro City (Extension) - Plots/Villas is a RERA-registered residential project by ORO CONSTRUCTIONS PVT LTD in Lucknow (RERA ID UPRERAPRJ337107). RERA status: Completed on 20 Oct 2020.
RERA status as reported: Completed.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ337107 |
| Project category | Residential |
| Registration type | New |
| RERA status | Completed |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Lucknow Development Authority |
| Proposed start | 1 Jan 2019 |
| Project duration | 64 months |
| Address | Bakshi Ka Talab**, Lucknow |
| Tehsil | Bakshi Ka Talab** |
| Applicant type | Company |
| Applicant address | 801, 8th floor, Eldeco Corporate Tower, Vibhuti Khand, Gomti Nagar, Lucknow. |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
42979
Registered with RERA
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Completion certificate filed
- to
Extension granted
“Six months extension in view of force majeure caused by covid-19 pandemic”
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
Completion certificate filed
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 1 Jan 2019 |
| Original completion | 15 Oct 2023 |
| Revised completion | 14 Apr 2024 |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 20 Oct 2020 |
| Registration fee | ₹49,000 |
| Sanctioning authority | Lucknow Development Authority |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots Plot Demarcation shall be complete by the fixing of RCC pillar on each unit. |
| 2 | Boundary Wall Boundary wall of the entire project shall be constructed |
| 3 | Road Work Semi Dense bituminous concrete (SDBC) roads shall be constructed with the base of GSB & WMM |
| 4 | Footpaths Footpaths shall be paving by CC pavers or earthen footpath |
| 5 | Water Supply Including Drinking Water Facilities Water supply by overhead tank and underground tank with medium density polyethylene piping system |
| 6 | Sewer System RCC hume pipes for Sewerage system |
| 7 | Drain RCC hume pipes for drainage system |
| 8 | Parks Green spaces will be developed as per approved layout plan |
| 9 | Tree Planting 70 trees to be planted |
| 10 | Design For Electric Supply Including Street Lighting Electrical infrastructure will be developed as per approved electrical layout |
| 11 | Community Buildings Club will be developed with all the facilities/amenities in our existing township ORO City. The facilities can be utilized on paid basis, and shall not allow ownership of the club building/premises |
| 12 | Treatment and Disposal System of Sewage and Sullage water MBBR- System S.T.P |
| 13 | Solid Waste Management And Disposal System Collection space in STP area. The disposal will be done by nagar nigam vendor. |
| 14 | Water Conservation System Rain Water Harvesting System |
| 15 | Energy Management System Including Use of Renewable Energy Solar water heating/Solar energy system to be decided later on the basis of feasibility study. |
| 16 | Fire Protection And Fire Safety System It is a plotted development project. Therefore, fire safety/protection system will not be installed |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services The area for socio-cultural services is applicable where the density of population is 2500 or above, whereas the population density of ORO City Extension- Plots/Villas is 700 only. |
| 18 | Emergency Evacuation Services Safe evacuation Plan of the occupants is important for high-rise building whereas this is a plotted development. |
| 19 | Other Miscellaneous Work - |
Registered agents
16 agents
Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.
| Sr. | Agent | RERA registration |
|---|---|---|
| 1 | 360 REALTORS LLP | UPRERAAGT10868 |
| 2 | Aman Chawla | UPRERAAGT11258 |
| 3 | ANIL KUMAR VERMA | UPRERAAGT14346 |
| 4 | ARVIND KUMAR | UPRERAAGT15927 |
| 5 | BAJRANG MISHRA C/O BASE INFRA SOLUTION | UPRERAAGT13635 |
| 6 | Bhupendra Singh Bhakuni | UPRERAAGT11564 |
| 7 | CHANDRA PRAKASH SAXENA | UPRERAAGT11046 |
| 8 | CHANDRA SHEKHAR | UPRERAAGT11389 |
| 9 | GOLDEN STAR REAL ESTATES | UPRERAAGT10303 |
| 10 | Mukesh kumar Sharma | UPRERAAGT11494 |
| 11 | Mukul Verma | UPRERAAGT12031 |
| 12 | SHREE SHRADDHA PROPERTIES | UPRERAAGT10301 |
| 13 | SHRI RUDRA REAL ESTATES | UPRERAAGT14251 |
| 14 | SQUARE YARDS CONSULTING PRIVATE LIMITED | UPRERAAGT10119 |
| 15 | Udai Associates | UPRERAAGT14663 |
| 16 | Vajrakaya Buildwell Private Limited | UPRERAAGT12913 |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 15 Oct 2023.
Sanctioned by Lucknow Development Authority · 8,712 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| 42979 | 16 Oct 2018 | 15 Oct 2023 | 14 Oct 2025 | 15 Oct 2023 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
UPRERA’s record carries 1 completion extension for this project, running to 14 Apr 2024.
| # | Granted from | Extended upto | Note |
|---|---|---|---|
| 1 | 15 Oct 2023 | 14 Apr 2024 | Six months extension in view of force majeure caused by covid-19 pandemic |
Land & documents
24 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 638SA | 730 | Khasra |
| 639 | 760 | Khasra |
| 639 | 760 | Khasra |
| 641SA | 26 | Khasra |
| 641SA | 183.67 | Khasra |
| 641SA | 424 | Khasra |
| 640 | 1330 | Khasra |
| 612 | 3540 | Khasra |
| 613P | 2542 | Khasra |
| 613P | 3450 | Khasra |
| Registry document · 12527 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 7903 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 7849 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 6824 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 743 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 11529 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 8062 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 8925 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 7852 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 6407 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 815 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 506 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 625 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 10792 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 28 Dec 2018 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 30 Nov 2018 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 30 Nov 2018 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 28 Nov 2018 ↗ |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | New | 28 Nov 2018 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 28 Nov 2018 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 28 Nov 2018 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 28 Nov 2018 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 30 Nov 2018 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 28 Nov 2018 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 30 Nov 2018 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 28 Nov 2018 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 30 Nov 2018 ↗ |
Quarterly progress reports
6 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
6 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2021-Q2.
| Quarter | Construction | Certificates |
|---|---|---|
| 2020-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | ORO CONSTRUCTIONS PVT LTD |
| Role | Promoter · current |
| RERA ID | UPRERAPRM15 |
| PAN | AACCO3092R |
| CIN / TAN | U70102UP2016PTC082967 |
| Name of chairman | Atul Kumar Saxena |
| Registered address | 801, 8th floor, Eldeco Corporate Tower, Vibhuti Khand, Gomti Nagar, Lucknow. |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Lucknow
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| Bank account as filed | Oro Constructions Pvt. Ltd.BankPunjab National BankBranchVibhuti KhandA/C no.IFSCPUNB0619300 |
What has changed on this record
nothing recorded yet
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.What to verify and what to ask
2 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about Oro City (Extension) - Plots/Villas
Is Oro City (Extension) - Plots/Villas RERA registered?
Yes. Oro City (Extension) - Plots/Villas is registered with UPRERA under registration number UPRERAPRJ337107, registered on 1 Jan 2019. Estanzo reproduces that filing; it does not verify the work behind it.
Has Oro City (Extension) - Plots/Villas been completed?
UPRERA lists Oro City (Extension) - Plots/Villas as completed, with a completion certificate dated 20 Oct 2020, against a filed deadline of 14 Apr 2024.
Who is the builder of Oro City (Extension) - Plots/Villas?
ORO CONSTRUCTIONS PVT LTD is the promoter entity that filed Oro City (Extension) - Plots/Villas with UPRERA (promoter RERA ID UPRERAPRM15). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Has UPRERA granted Oro City (Extension) - Plots/Villas more time to complete?
UPRERA's record carries 1 completion extension for Oro City (Extension) - Plots/Villas, the latest running to 14 Apr 2024. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.
Does Oro City (Extension) - Plots/Villas have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is Oro City (Extension) - Plots/Villas located?
Oro City (Extension) - Plots/Villas is registered in Lucknow, as filed with UPRERA.