Oro City is a RERA-registered residential project by ORO CONSTRUCTIONS PVT LTD in Lucknow (RERA ID UPRERAPRJ5). RERA status: Completed on 25 Feb 2025.
RERA status as reported: Completed.Construction progress
Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ5 |
| Project category | Residential |
| Registration type | Ongoing |
| RERA status | Completed |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Lucknow Development Authority |
| Proposed start | 20 Jun 2017 |
| Original start | 31 Jan 2017 |
| Project duration | 62 months |
| Address | madiyaon, Bakshi Ka Talab**, Lucknow |
| Tehsil | Bakshi Ka Talab** |
| Applicant type | Company |
| Applicant address | 801, 8th floor, Eldeco Corporate Tower, Vibhuti Khand, Gomti Nagar, Lucknow. |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Permit revalidated
41055
2 building permits sanctioned
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
- to
Extension granted
“Six months extension in view of force majeure caused by covid-19 pandemic”
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
Completion certificate filed
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 1 Aug 2017 |
| Original completion | 30 Jan 2022 |
| Revised completion | 29 Jul 2022 |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 25 Feb 2025 |
| Registration fee | ₹2,37,000 |
| Sanctioning authority | Lucknow Development Authority |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots Plot Demarcation shall be complete by the fixing of RCC pillar on each unit. |
| 2 | Boundary Wall Boundary wall of the entire project shall be constructed |
| 3 | Road Work Semi DEnse bituminous concrete (SDBC) roads shall be constructed with the base ofGSB & WMM |
| 4 | Footpaths Footpaths shall be paving by CC pavers or earthen footpath |
| 5 | Water Supply Including Drinking Water Facilities Water supply by overhead tank and underground tank with medium density polyethylene piping system |
| 6 | Sewer System RCC hume pipes for Sewerage system |
| 7 | Drain RCC hume pipes for drainage system |
| 8 | Parks Green spaces will be developed as per approved layout plan |
| 9 | Tree Planting Yes |
| 10 | Design For Electric Supply Including Street Lighting Electrical infrastructure will be developed as per approved electrical layout |
| 11 | Community Buildings Club will be developed with all the facilities/amenities. The facilities can be utilized on paid basis, and shall not allow ownership of the club building/premises |
| 12 | Treatment and Disposal System of Sewage and Sullage water Yes |
| 13 | Solid Waste Management And Disposal System Yes |
| 14 | Water Conservation System Yes |
| 15 | Energy Management System Including Use of Renewable Energy Not Applicable |
| 16 | Fire Protection And Fire Safety System Not Applicable |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services Not Applicable |
| 18 | Emergency Evacuation Services Not Applicable |
| 19 | Other Miscellaneous Work - |
Registered agents
13 agents
Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.
| Sr. | Agent | RERA registration |
|---|---|---|
| 1 | 360 REALTORS LLP | UPRERAAGT10868 |
| 2 | Aman Chawla | UPRERAAGT11258 |
| 3 | BAJRANG MISHRA C/O BASE INFRA SOLUTION | UPRERAAGT13635 |
| 4 | Bhupendra Singh Bhakuni | UPRERAAGT11564 |
| 5 | CHANDRA PRAKASH SAXENA | UPRERAAGT11046 |
| 6 | CHANDRA SHEKHAR | UPRERAAGT11389 |
| 7 | CITYMAX PROPMART PRIVATE LIMITED | UPRERAAGT13792 |
| 8 | GOLDEN STAR REAL ESTATES | UPRERAAGT10303 |
| 9 | Mukul Verma | UPRERAAGT12031 |
| 10 | SHREE SHRADDHA PROPERTIES | UPRERAAGT10301 |
| 11 | Udai Associates | UPRERAAGT14663 |
| 12 | Vajrakaya Buildwell Private Limited | UPRERAAGT12913 |
| 13 | Varun Properties Inc. | UPRERAAGT11985 |
Permits & extensions
2 permits
An approval and the date it runs to - not proof the work matching it was done.
2 sanctioning permits are on record with UPRERA, the latest valid to 30 Jan 2022. 1 of them carries a revalidation.
Sanctioned by Lucknow Development Authority · 46,345 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | RevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossary | Documents filed |
|---|---|---|---|---|---|---|
| 41055 | 31 Jan 2017 | 30 Jan 2022 | 30 Jan 2025 | 30 Jan 2022 | — | |
| 41055 | 31 Jan 2017 | 30 Jan 2022 | 30 Jan 2025 | 29 Jul 2022 | 31 Jan 2017 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
UPRERA’s record carries 1 completion extension for this project, running to 29 Jul 2022.
| # | Granted from | Extended upto | Note |
|---|---|---|---|
| 1 | 30 Jan 2022 | 29 Jul 2022 | Six months extension in view of force majeure caused by covid-19 pandemic |
Land & documents
43 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 1245 | 3444 | — |
| 610 | 2040 | Khasra |
| 611 | 2110 | Khasra |
| 607 | 2870 | Khasra |
| 606 | 2910 | Khasra |
| 605 | 2560 | Khasra |
| 605 | 2560 | Khasra |
| 605 | 2560 | Khasra |
| 601 | 5770 | Khasra |
| 593 | 5700 | Khasra |
| 586 | 2550 | Khasra |
| 587 | 3160 | Khasra |
| 588 | 970 | Khasra |
| 592 | 6340 | Khasra |
| 641 | 50 | Khasra |
| 637 | 1320 | Khasra |
| 636 | 1390 | Khasra |
| 635 | 2400 | Khasra |
| 634 | 1520 | Khasra |
| 633 | 3150 | Khasra |
| 632 | 4885 | Khasra |
| 632 | 4890 | Khasra |
| 631 | 1520 | Khasra |
| 630 | 3310 | Khasra |
| 629 | 1900 | Khasra |
| 627 | 4407 | Khasra |
| 627 | 4410 | Khasra |
| 627 | 4410 | Khasra |
| 652 | 9680 | Khasra |
| 652 | 9680 | Khasra |
1 registry or lease-deed filing is on this project’s record with UPRERA, dated 19 Jul 2017.
| Registry no. | Date | Type | Area |
|---|---|---|---|
| 12345 | 19 Jul 2017 | Own | — |
| Registry document · 2029 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 2288 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 10592 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 10672 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 2565 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 2024 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 9374 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 1454 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 7401 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 1351 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 3314 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 7338 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 1801 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 12891 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 5852 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 9823 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 115 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 10445 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 10083 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 815 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 6 Jul 2018 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 6 Jul 2018 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 6 Jul 2018 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 6 Jul 2018 ↗ |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | New | 6 Jul 2018 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 6 Jul 2018 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 6 Jul 2018 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 6 Jul 2018 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 6 Jul 2018 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 6 Jul 2018 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 6 Jul 2018 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 6 Jul 2018 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 6 Jul 2018 ↗ |
Facilities
as declared to RERA
Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.
| Drinking water | yes |
| Other facilities | total green area 13158.56 sq.mt. including central park of 7080 sq.mt., stp, garbage, etc. |
Quarterly progress reports
10 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
10 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2022-Q2.
| Quarter | Construction | Certificates |
|---|---|---|
| 2020-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q3 | 100% | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q4 | 100% | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q1 | 100% | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q2 | 100% | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | ORO CONSTRUCTIONS PVT LTD |
| Role | Promoter · current |
| RERA ID | UPRERAPRM15 |
| PAN | AACCO3092R |
| CIN / TAN | U70102UP2016PTC082967 |
| Name of chairman | Atul Kumar Saxena |
| Registered address | 801, 8th floor, Eldeco Corporate Tower, Vibhuti Khand, Gomti Nagar, Lucknow. |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Lucknow
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| Bank account as filed | ORO CONSTRUCTIONS PVT LTDBankHDFCBranchHDFC VIBHUTI KHAND GOMTI NAGAR LUCKNOWA/C no.IFSCHDFC0004805 |
What has changed on this record
1 movement
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| RERA status | registered → completed changed in Estanzo’s record | 23 Aug 2026 |
| RERA status | changed in Estanzo’s record · 23 Aug 2026 |
What to verify and what to ask
2 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about Oro City
Is Oro City RERA registered?
Yes. Oro City is registered with UPRERA under registration number UPRERAPRJ5, registered on 1 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.
Has Oro City been completed?
UPRERA lists Oro City as completed, with a completion certificate dated 25 Feb 2025, against a filed deadline of 29 Jul 2022.
Who is the builder of Oro City?
ORO CONSTRUCTIONS PVT LTD is the promoter entity that filed Oro City with UPRERA (promoter RERA ID UPRERAPRM15). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Has UPRERA granted Oro City more time to complete?
UPRERA's record carries 1 completion extension for Oro City, the latest running to 29 Jul 2022. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.
Does Oro City have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is Oro City located?
Oro City is registered in Lucknow, as filed with UPRERA.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗