PARSVNATH EXOTICA PHASE-I is a RERA-registered residential project by PARSVNATH BUILDWELL PRIVATE LIMITED in Ghaziabad (RERA ID UPRERAPRJ7267). RERA status: Abeyance.
RERA status as reported: Abeyance.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ7267 |
| Project category | Residential |
| Registration type | Ongoing |
| RERA status | AbeyanceAbeyance“Held in suspension.” UP-RERA lists projects whose registration it has placed in abeyance.Read the full entry in the glossary |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Ghaziabad Development Authority |
| Proposed start | 15 Jan 2011 |
| Original start | 30 Apr 2007 |
| Project duration | 104 months |
| Address | Ghaziabad, Ghaziabad |
| Tehsil | Ghaziabad |
| Applicant type | Company |
| Applicant address | Parsvnath Tower Near Shahdara Metro Station Shahdara DELHI – 110 032 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 31 Jul 2017 |
| Original completion | 30 Aug 2019 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹2,56,500 |
| Sanctioning authority | Ghaziabad Development Authority |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots NA |
| 2 | Boundary Wall RCC /Brick Work / Stone Cladding |
| 3 | Road Work CC / Paver Blocks |
| 4 | Footpaths Grass Pavers /CC /Landscaped Walkways |
| 5 | Water Supply Including Drinking Water Facilities the Water supplied for drinking to be filtered treated Through Individual RO |
| 6 | Sewer System RCC /SW Pipes & STP ( Moving Bed Bio Reactor) |
| 7 | Drain RCC drains with designated Discharge Punts & RWH |
| 8 | Parks As per Drawing |
| 9 | Tree Planting As per Landscape plan |
| 10 | Design For Electric Supply Including Street Lighting Copper Wires in concealed PVC conduits , As per Revised Submission Drawing /Landscape plan/ Single Point Supply and then distributed to Units |
| 11 | Community Buildings Yes |
| 12 | Treatment and Disposal System of Sewage and Sullage water STP ( MBBR) |
| 13 | Solid Waste Management And Disposal System 2 Bin System ( green & Blue) and disposable to designated place as per Guidelines |
| 14 | Water Conservation System Rain Water harvesting System |
| 15 | Energy Management System Including Use of Renewable Energy As per Guidelines |
| 16 | Fire Protection And Fire Safety System As per NBC 2016 & Wet Riser ,Hydrants etcas per approved Fire plan |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services Yes |
| 18 | Emergency Evacuation Services As per NBC 2016 & Wet Riser ,Hydrants etcas per approved Fire plan |
| 19 | Other Miscellaneous Work Yes |
Permits & extensions
0 permits
An approval and the date it runs to - not proof the work matching it was done.
Sanctioned by Ghaziabad Development Authority · 50,277 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Document | File |
|---|---|
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Project approval The approval the promoter filed as the basis for registering the project. | PDF ↗ |
| Sanctioned layout plan The approved layout of the whole site: where the towers, roads and open areas sit on the plot. | PDF ↗ |
| Project approval The approval the promoter filed as the basis for registering the project. | PDF ↗ |
Land & documents
10 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| - | 50277 | — |
| 1216,1217, 1218, 1219, ETC | 121187 | Khasra |
1 registry or lease-deed filing is on this project’s record with UPRERA, dated 28 Dec 2010.
| Registry no. | Date | Type | Area |
|---|---|---|---|
| 9717 | 28 Dec 2010 | other | — |
| Sale deed · 954 The registered deed by which the promoter bought the land. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 4 Mar 2020 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 25 Oct 2017 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | Old | 1 Feb 2018 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 1 Feb 2018 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 1 Feb 2018 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 1 Feb 2018 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | Old | 1 Feb 2018 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | Old | 1 Feb 2018 ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | PARSVNATH BUILDWELL PRIVATE LIMITED |
| Role | Promoter · current |
| RERA ID | UPRERAPRM11886 |
| PAN | AAHCA0978P |
| CIN / TAN | U45400DL2008PTC178395 |
| Name of chairman | Parsvnath Tower Near Shahdara Metro Station Shahdara DELHI – 110 032 |
| Registered address | Parsvnath Tower Near Shahdara Metro Station Shahdara DELHI – 110 032 |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Ghaziabad
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
What has changed on this record
nothing recorded yet
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.What to verify and what to ask
5 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No project bank account is published for this project.Ask which RERA-designated account payments are to be made to, and check the details against the UP-RERA page before paying anything.
- No sanctioning permit is published for this project.Ask which authority sanctioned the plans, for the permit number, and for the date it is valid to.
- No quarterly progress report is published for this project.Ask the promoter for the latest quarterly report filed and the construction percentage certified in it.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about PARSVNATH EXOTICA PHASE-I
Is PARSVNATH EXOTICA PHASE-I RERA registered?
Yes. PARSVNATH EXOTICA PHASE-I is registered with UPRERA under registration number UPRERAPRJ7267, registered on 31 Jul 2017. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for PARSVNATH EXOTICA PHASE-I?
The completion date filed with UPRERA is 30 Aug 2019. No completion certificate is on record yet.
Who is the builder of PARSVNATH EXOTICA PHASE-I?
PARSVNATH BUILDWELL PRIVATE LIMITED is the promoter entity that filed PARSVNATH EXOTICA PHASE-I with UPRERA (promoter RERA ID UPRERAPRM11886). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Where is PARSVNATH EXOTICA PHASE-I located?
PARSVNATH EXOTICA PHASE-I is registered in Ghaziabad, as filed with UPRERA.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗