Belvedere Court - 3 (GH-10 & 11) Integrated Township Baghamau

UPRERARegistered

Belvedere Court - 3 (GH-10 & 11) Integrated Township Baghamau is a RERA-registered residential project by M/s Shalimar Lakecity Private Limited (Formerly M/s ANS Developers Private Limited) in Lucknow (RERA ID UPRERAPRJ260653). Registered with a completion deadline of 15 Apr 2025.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ260653
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryLucknow Development Authority
Proposed start15 Apr 2020
Project duration61 months
AddressLucknow, Lucknow
TehsilLucknow
Applicant typeCompany
Applicant address11th floor, Shalimar Titanium Vibhuti Khand Gomti Nagar Lucknow-226010 UP India
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    MAP-20191205120711677 & MAP-20191205105743450

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Completion certificate filed

  5. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  6. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered28 Apr 2020
Original completion15 Apr 2025
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary3 Apr 2025
Registration fee₹1,34,000
Sanctioning authorityLucknow Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors319 · 6 · 24 (units from plan)
  • 3 BHK142 45%
  • 4 BHK121 38%
  • 2 BHK36 11%
  • OTHER18 6%
  • PENTHOUSE2 1%
ConfigurationUnitsCarpet area
OTHER18309-324
4 BHK121189-226
2 BHK3688-88
3 BHK142125-136
PENTHOUSE2171-236
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
Tower A1 · OTHER, 4 BHK2440189-324
Tower A2 · OTHER, 4 BHK2440189-324
Tower A3 · OTHER, 4 BHK2440189-324
Tower B1 · OTHER, 2 BHK, 3 BHK, PENTHOUSE207488-236
Tower B2 · OTHER, 3 BHK, 4 BHK2057136-226
Tower C · OTHER, 3 BHK1868126
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
42 MM Architecture
License CA/2011/53000
D-102 Chhatarpur, New Delhi-110074
Engineer
Mr. Sanjeev Jain
"I- 1738, Chittaranjan Park, New Delhi - 110019"
Contractor
B.B. Realtech Pvt. Ltd.
"SF-20, Cross River Mall, Plot No. 9B & 9C Shahdra, Delhi-110032"
Sr.Development work declared to RERA
1Demarcation of Plots
This is single plot polygon shaped , having total 1 no. of entry gate and 1no. of exit gate from the 18m wide front road, Site is surronded by other plots of developers from three sides and one side by Baghamau village.
2Boundary Wall
1.8 - 2.1m high and 200 mm thick Boundary wall designed . Brick Work of 9inches and rcc work in column and beam may be used as per design. MS Broad entrance and exit gates are developed with boundary.
3Road Work
Trimix road will be used as per deisgn suggested by the Architect for internal road.
4Footpaths
All internal roads will have narrow footpath with matt finish tiles pavers or equivalent finishes
5Water Supply Including Drinking Water Facilities
Ground water may also be used, Also end user shall be used their individual RO system as per their requirement. Overhead tanks shall be provided on building terrace for distribution through gravity.
6Sewer System
Centralized Sewerage system shall be Provided. All Sewerage water shall be go to the STP for treatement. after treatement ,water shall be recycled and it will use in gardening, flush tanks and vehicle washing, oveflow from the STP shall be connect with the Municiple sewarage system.
7Drain
Storm water system shall be Provided. Storm water from Roads and other lanscape area shall be connect to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connect with Municiple drain line.
8Parks
There many green/ ladscape area in front/ beside of building including green parks, play areas for childrens and different recretional activities.
9Tree Planting
There are diffrent type of tree plantation is proposed at site in order to maintatin greenary and natural view.
10Design For Electric Supply Including Street Lighting
We have designed the system as per local electricity Board and consider centralized Transformer,HT panel,LT Panel,Feeder Pillar and DG back for common service like External lighting,STP,Pump room etc.
11Community Buildings
Fully centralised AC Club House/community center is provided, swimming pool and some temporary kiosks on the central atrium with sitting area of each building.
12Treatment and Disposal System of Sewage and Sullage water
Centralized Sewerage system shall be Provided. All Sewerage water shall go to the STP for tretement after treatement ,water shall be recycle and it will use in gardening, flush tanks and vehicle washing, oveflow from the STP shall be connect with the Municiple sewarage system.
13Solid Waste Management And Disposal System
There are a proper garbage collection area provided for the solid waste management.
14Water Conservation System
A well designed rain water harvesting system shall be provided for the whole building complex to conserve water.
15Energy Management System Including Use of Renewable Energy
We will use LED lights fitting in external area as well as solar lights. In STP and Pump room all the equipment shall have energy efficient motor. 25 % of Terrace is covered with Solar Voltaic Panels to provide Renewable source of energy for common areas in building complex.
16Fire Protection And Fire Safety System
Since the building is less than 75m in height all the fire norms shall be followed as NBC and approval of fire department
17Social Infrastructure And Other Public Amenities Including Public Health Services
Sewerage ,Storm water and water supply system shall be Provided. We have Proposed common Pump Room with Primary filteration, Transfer pumps to fill the domestic overhead tank. Water for domestic use & Flushing go down through gravity from domestic as well as flushing tanks. All Sewgage shall be go to the STP for recycling the water. Storm water for Roof,Roads and other area shall be connect to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connect with Municiple drain.
18Emergency Evacuation Services
Fire Staircase is provided in the each building, with fire resistant doors, basements have 1 (one) accesse and exit in case of emergency
19Other Miscellaneous Work
Luxurious entrance lobby in each block, convenience store for day to day small purchasings, lush green shurbs at every vacant space on ground.
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

26 agents

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1360 REALTORS LLPUPRERAAGT10868
2Abhishek KumarUPRERAAGT17780
3ANIL KUMAR VERMAUPRERAAGT14346
4ARVIND KUMARUPRERAAGT15927
5ASA FINCAP ADVISORS LLPUPRERAAGT10926
6BAJRANG MISHRA C/O BASE INFRA SOLUTIONUPRERAAGT13635
7BASECAMP INFRA CONSULTANTS (OPC) PRIVATE LIMITEDUPRERAAGT14759
8CHANDRA PRAKASH SAXENAUPRERAAGT11046
9CITYMAX PROPMART PRIVATE LIMITEDUPRERAAGT13792
10Karshni Buildwell Pvt LtdUPRERAAGT11401
11MOHAMMAD RASHIDUPRERAAGT15251
12Mukesh kumar SharmaUPRERAAGT11494
13RAM KUMAR YADAVUPRERAAGT13784
14REALTYSTRUCTURE INFRATECH PRIVATE LIMITEDUPRERAAGT10144
15Rohit ChandaniUPRERAAGT11546
16SANJEEV KUMAR BANKAUPRERAAGT10894
17Saurabh GuptaUPRERAAGT14655
18Shashank ShuklaUPRERAAGT17091
19SHINU GUPTAUPRERAAGT18762
20SINAN REALTY LLPUPRERAAGT11785
21SQUARE YARDS CONSULTING PRIVATE LIMITEDUPRERAAGT10119
22STRAIGHTEDGE REAL ESTATE PRIVATE LIMITEDUPRERAAGT10067
23VINAY KUMAR SINGHUPRERAAGT11226
24VISHESH SRIVASTAVAUPRERAAGT11416
25VIVEK ARORAUPRERAAGT15945
26VIVEK VERMAUPRERAAGT18719
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 10 Dec 2024.

Sanctioned by Lucknow Development Authority · 25,797 sqm of land · an approved plan of 6 blocks and 319 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
MAP-20191205120711677 & MAP-2019120510574345011 Dec 201910 Dec 202410 Dec 202715 Apr 2025
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

15 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
306P, 308P, 310P, 311P, 312P, 314P, 315KA P, 315KHA P, 316P8,927.43Khasra
304P, 306P, 312P, 313P, 314P, 315KA P, 315KH P, 316P, 317KA P, (317KH P- Land Acq. Prop.), 318, 319, 320P, 321KA P, 321KHA P, 321GA P, 324KA P, 324KHA P16,869.09Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Sale deed · 438
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 6137
The registered deed by which the promoter bought the land.
PDF ↗
Registry document · 5396
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 9652
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Sale deed · 11383
The registered deed by which the promoter bought the land.
PDF ↗
Registry document · 4798
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Sale deed · 7548
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 8785
The registered deed by which the promoter bought the land.
PDF ↗
Document checklist
DocumentStatusUploaded
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New22 Mar 2020 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New22 Mar 2020 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New22 Mar 2020 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New22 Mar 2020 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New22 Mar 2020 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New22 Mar 2020 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New22 Mar 2020 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New22 Mar 2020 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New22 Mar 2020 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New22 Mar 2020 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New22 Mar 2020 ↗

Quarterly progress reports

21 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

21 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2025-Q1.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
2024-Q4—CA ↗ · Arch ↗ · Eng ↗
2025-Q1—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameM/s Shalimar Lakecity Private Limited (Formerly M/s ANS Developers Private Limited)
RolePromoter · current
RERA IDUPRERAPRM10813
PANAAFCA9848N
CIN / TANU70109DL2006PTC389838
Name of chairmanMr. Anwar Rizvi
Registered address11th floor, Shalimar Titanium Vibhuti Khand Gomti Nagar Lucknow-226010 UP India
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Lucknow

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
ANS Developers Private LimitedBankHDFC BankBranchVibhuti KhandA/C no.IFSCHDFC0004805
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

2 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)33 (Under Registration - 1 ) → 33 (Under Registration - 0 )
changed in Estanzo’s record
18 Oct 2026
Promoter’s complaints tally (all their projects)32 (Under Registration - 0 ) → 33 (Under Registration - 1 )
changed in Estanzo’s record
11 Sept 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 18 Oct 2026 · 2 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about Belvedere Court - 3 (GH-10 & 11) Integrated Township Baghamau

Is Belvedere Court - 3 (GH-10 & 11) Integrated Township Baghamau RERA registered?

Yes. Belvedere Court - 3 (GH-10 & 11) Integrated Township Baghamau is registered with UPRERA under registration number UPRERAPRJ260653, registered on 28 Apr 2020. Estanzo reproduces that filing; it does not verify the work behind it.

Has Belvedere Court - 3 (GH-10 & 11) Integrated Township Baghamau been completed?

UPRERA still lists Belvedere Court - 3 (GH-10 & 11) Integrated Township Baghamau as Registered, so it is not shown as completed here. A completion certificate dated 3 Apr 2025 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.

Who is the builder of Belvedere Court - 3 (GH-10 & 11) Integrated Township Baghamau?

M/s Shalimar Lakecity Private Limited (Formerly M/s ANS Developers Private Limited) is the promoter entity that filed Belvedere Court - 3 (GH-10 & 11) Integrated Township Baghamau with UPRERA (promoter RERA ID UPRERAPRM10813). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does Belvedere Court - 3 (GH-10 & 11) Integrated Township Baghamau have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Belvedere Court - 3 (GH-10 & 11) Integrated Township Baghamau located?

Belvedere Court - 3 (GH-10 & 11) Integrated Township Baghamau is registered in Lucknow, as filed with UPRERA.

What configurations are available in Belvedere Court - 3 (GH-10 & 11) Integrated Township Baghamau?

The unit plan filed with UPRERA lists OTHER, 4 BHK, 2 BHK, 3 BHK and PENTHOUSE. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in Belvedere Court - 3 (GH-10 & 11) Integrated Township Baghamau?

The approved unit plan filed with UPRERA runs from 88 to 324 m² of carpet area (about 943 to 3,487 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in Belvedere Court - 3 (GH-10 & 11) Integrated Township Baghamau?

The approved unit plan describes 6 blocks and 319 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is Belvedere Court - 3 (GH-10 & 11) Integrated Township Baghamau?

About 50 units per acre: 319 planned units across 6.37 acres (25,797 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗