PURVANCHAL CAPITAL TOWER

UPRERARegistered

PURVANCHAL CAPITAL TOWER is a RERA-registered commercial project by PURVANCHAL PROJECTS PRIVATE LIMITED in Lucknow (RERA ID UPRERAPRJ849094). Registered with a completion deadline of 30 Jun 2024.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ849094
Project categoryCommercial
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryLucknow Development Authority
Proposed start5 Sept 2020
Project duration46 months
AddressLucknow, Lucknow
TehsilLucknow
Applicant typeCompany
Applicant addressLSC, A-7, 2nd FLOOR, PURVANCHAL PLAZA, MAYUR VIHAR, PHASE-II, DELHI-110092
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    MAP-20190528123140277

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. to

    Extension granted

  5. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  6. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

  7. Completion certificate filed

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered15 Oct 2020
Original completion31 Mar 2024
Revised completion30 Jun 2024
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary28 Sept 2024
Registration fee₹63,000
Sanctioning authorityLucknow Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors204 · 1 · 18 (units from plan)
Homes · commercial units178 · 26 (shops and offices filed in the same plan)
  • OTHER178 87%
  • SHOP26 13%
ConfigurationUnitsCarpet area
OTHER17836-106
SHOP2660-145
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
CAPITAL TOWER · OTHER, SHOP1820436-145
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
DEVELOPMENT CONSULTANTS - MR. ARUN PATWAL
License CA/88/11752
209 C-MASJID MOTH ( R BLOCK, NDSE -II) NEW DELHI-110049
Engineer
ER. SADANAND OJHA
503, 5TH FLOOR, SACHDEVA CORPORATE TOWER, PLOT NO. 8 , SECTOR 8, ROHINI, DELHI -110085
Contractor
MR. SHAH ALAM
LSC A -7, 2ND FLOOR, PURVANCHAL PLAZA, MAYUR VIHAR , PHASE -2, NEW DELHI - 110091
Sr.Development work declared to RERA
1Demarcation of Plots
TWO SIDE OPEN PLOT WITH 24 METER DIVIDER ROAD ON ONE SIDE AND 12 METER SERVICE ROAD ON THE OTHER SIDE. PROPER DEMARCATION OF PLOT IS COMPLETED AS PER APPROVED LAYOUT.
2Boundary Wall
BOUNDARY WALL OF THE PLOT WILL BE CONSTRUCTED WITH A MIX OF RCC AND BRICK WORK, AND IT WILL BE FINISHED WITH RED STAND-STONE AND MS- GRILL.
3Road Work
A SIX METER DRIVEWAY WILL BE PROVIDED IN CONCRETE FINISH WITH CONCRETE CEMENT TILES / STAMPED CONCRETING.
4Footpaths
FOOTPATHS INSIDE THE COMPLEX WILL BE CONSTRUCTED WITH A MIX OF COLORED CEMENT CONCRETE TILES AND GRANITE.
5Water Supply Including Drinking Water Facilities
THE WATER SUPPLY OF DESIRED QUALITY AND PURITY WILL BE PROVIDED THROUGH OVERHEAD TANKS UPTO EACH UNIT THROUGH TREATED BORING WATER AND GENERAL WATER SUPPLY FROM DEVELOPMENT AUTHORITY.
6Sewer System
THE PROPER PROVISION OF SEWER LINES HAS BEEN PROVIDED AS PER THE NORMS AND BYE-LAWS OF DEVELOPMENT AUTHORITY. SEWAGE TREATMENT PLANT OF SUITABLE CAPACITY WILL BE ESTABLISHED.
7Drain
THE PROPER PROVISION OF DRAINAGE HAS BEEN PROVIDED AS PER THE NORMS AND BYE-LAWS OF DEVELOPMENT AUTHORITY. A WELL DESIGNED DRAINAGE SYSTEM CONNECTED TO THE SEWAGE TREATMENT PLANT OF SUITABLE CAPACITY WILL BE ESTABLISHED.
8Parks
NA
9Tree Planting
TREES WILL BE PLANTED INSIDE THE COMPLEX IN ACCORDANCE WITH THE APPROVED DRAWINGS FROM DEVELOPMENT AUTHORITY.
10Design For Electric Supply Including Street Lighting
DESIGNER ELECTRIC POLES, LED LIGHTS TO BE PROVIDED. ALL ELECTRICAL RELATED WORKINGS SHALL CONFER TO BUREAU OF INDIAN STANDARDS, INDIAN ELECTRICITY RULES AND ACTS.
11Community Buildings
NA
12Treatment and Disposal System of Sewage and Sullage water
THE PROPER PROVISION FOR TREATMENT AND DISPOSAL OF SEWAGE AND SULLAGE WATER WILL BE PROVIDED IN ACCORDANCE WITH THE NORMS AND BYE-LAWS OF DEVELOPMENT AUTHORITY. THE SEWAGE TREATMENT PLANT OF SUITABLE CAPACITY WILL BE ESTABLISHED FOR THE TREATMENT AND DISPOSAL OF SEWAGE AND SULLAGE WATER. PROVISIONS ARE PROVIDED FOR RECYCLED WATER TO BE USED IN FLUSHING AND IRRIGATION WORKS.
13Solid Waste Management And Disposal System
THE PROPER PROVISION FOR SOLID WASTE MANAGEMENT AND DISPOSAL SYSTEM WILL BE PROVIDED IN ACCORDANCE WITH THE NORMS AND BYE-LAWS OF DEVELOPMENT AUTHORITY. THE CENTRALIZED SEWAGE TREATMENT PLANT OF SUITABLE CAPACITY WILL BE ESTABLISHED FOR THE PURPOSE OF COLLECTION AND DISPOSAL OF SOLID WASTE INSIDE THE COMPLEX.
14Water Conservation System
ALL GUIDELINES AND BYE-LAWS OF COMPETENT AUTHORITY WILL BE FOLLOWED FOR CONSERVATION OF NATURAL WATER. RAINWATER HARVESTING SYSTEM WILL BE PROVIDED IN ACCORDANCE WITH THE APPROVED MAPS AND LAYOUTS FROM THE DEVELOPMENT AUTHORITY.
15Energy Management System Including Use of Renewable Energy
PARTIAL SOLAR ENERGY WILL BE UTILIZED AS PER THE BYE-LAWS OF COMPETENT AUTHORITY AND AS PER APPROVED BUILDING PLANS.
16Fire Protection And Fire Safety System
ALL RULES AND REGULATIONS OF NBC IS BEING FOLLOWED. WATER SPRINKLERS SYSTEM WITH AUTOMATIC UPRIGHT/PENDANT/SIDEWALL SPRINKLERS ON EACH FLOOR AS PER THE NATIONAL BUILDING CODE -2016. INTELLIGENT FIRE DETECTION AND ALARM SYSTEM INTHE ENTIRE BUILDING WILL BE PROVIDED.
17Social Infrastructure And Other Public Amenities Including Public Health Services
PROPER PROVISION FOR SOCIAL INFRA AND PUBLIC AMENITIES WILL BE PROVIDED.
18Emergency Evacuation Services
FIRE STAIRCASE HAS BEEN PROVIDED ON EACH FLOOR FOR EMERGENCY EVACUATION. INTELLIGENT FIRE DETECTION AND ALARM SYSTEM WITH EMERGENCY VOICE EVACUATION SYSTEM WILL BE INSTALLED.
19Other Miscellaneous Work
PROVISION FOR MECHANICAL CAR PARKING SYSTEM IN UPPER AND LOWER BASEMENT WILL BE INSTALLED AS PER THE APPROVED DRAWINGS FROM COMPETENT AUTHORITY.
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

25 agents

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1360 REALTORS LLPUPRERAAGT10868
2ANAROCK Property Consultants Private LimitedUPRERAAGT10265
3ASA FINCAP ADVISORS LLPUPRERAAGT10926
4GOLDEN STAR REAL ESTATESUPRERAAGT10303
5INVESTORS CARE INFRATECH PVT LTDUPRERAAGT13542
6Jayant KarmakarUPRERAAGT15809
7Karshni Buildwell Pvt LtdUPRERAAGT11401
8KAUSHTUBH REALTY PRIVET LIMITEDUPRERAAGT13025
9KONRAI OVERSEASUPRERAAGT14764
10Mohd Atif AliUPRERAAGT17360
11Mukul VermaUPRERAAGT12031
12O.C. INFRAVENTURES AND CONSTRUCTION PVT LTDUPRERAAGT15084
13OIKOSHREEM INFRATECH PRIVATE LIMITEDUPRERAAGT19241
14Pankaj MittalUPRERAAGT13523
15RANVEER PROPERTIESUPRERAAGT10234
16REHA PAHUJAUPRERAAGT19228
17RELIVE SOLUTIONS PVT. LTD.UPRERAAGT10078
18Santosh KumarUPRERAAGT13874
19SDR INFRA BUILD PVT LTDUPRERAAGT11062
20SeedWill Consulting Private LimitedUPRERAAGT15794
21Smart InfraReality Private LimitedUPRERAAGT10057
22SMC Real Estate Advisors Private LimitedUPRERAAGT10113
23SQUARE YARDS CONSULTING PRIVATE LIMITEDUPRERAAGT10119
24Sumit SinghUPRERAAGT12057
25SUSHILA DEVI SRIVASTAVAUPRERAAGT15738
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 30 Sept 2024.

Sanctioned by Lucknow Development Authority · 5,210 sqm of land · an approved plan of 1 block and 204 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
MAP-201905281231402771 Oct 201930 Sept 202430 Sept 202431 Mar 2024
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 1 completion extension for this project, running to 30 Jun 2024.

#Granted fromExtended uptoNote
131 Mar 202430 Jun 2024—

Land & documents

15 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
TC A15209.75Plot
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · 6554
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New16 Sept 2020 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New5 Sept 2020 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New5 Sept 2020 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New5 Sept 2020 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New8 Sept 2020 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New8 Sept 2020 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New8 Sept 2020 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New5 Sept 2020 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New5 Sept 2020 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New24 Sept 2020 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New5 Sept 2020 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New5 Sept 2020 ↗

Quarterly progress reports

16 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

16 quarterly progress reports are on file with UPRERA, covering 2020-Q2 to 2024-Q1.

QuarterConstructionCertificates
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal namePURVANCHAL PROJECTS PRIVATE LIMITED
RolePromoter · current
RERA IDUPRERAPRM73757
PANAAFCP4046B
CIN / TANU70102DL2010PTC200716
Name of chairmanSHAH ALAM
Registered addressLSC, A-7, 2nd FLOOR, PURVANCHAL PLAZA, MAYUR VIHAR, PHASE-II, DELHI-110092
RERA contact
Registered since2019
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Lucknow

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
PURVANCHAL PROJECTS PVT. LTD. CAPITAL TOWERBankBANK OF BARODABranchVISHAL KHAND LUCKNOWA/C no.IFSCBARB0VJVIKH
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about PURVANCHAL CAPITAL TOWER

Is PURVANCHAL CAPITAL TOWER RERA registered?

Yes. PURVANCHAL CAPITAL TOWER is registered with UPRERA under registration number UPRERAPRJ849094, registered on 15 Oct 2020. Estanzo reproduces that filing; it does not verify the work behind it.

Has PURVANCHAL CAPITAL TOWER been completed?

UPRERA still lists PURVANCHAL CAPITAL TOWER as Registered, so it is not shown as completed here. A completion certificate dated 28 Sept 2024 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.

Who is the builder of PURVANCHAL CAPITAL TOWER?

PURVANCHAL PROJECTS PRIVATE LIMITED is the promoter entity that filed PURVANCHAL CAPITAL TOWER with UPRERA (promoter RERA ID UPRERAPRM73757). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted PURVANCHAL CAPITAL TOWER more time to complete?

UPRERA's record carries 1 completion extension for PURVANCHAL CAPITAL TOWER, the latest running to 30 Jun 2024. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does PURVANCHAL CAPITAL TOWER have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is PURVANCHAL CAPITAL TOWER located?

PURVANCHAL CAPITAL TOWER is registered in Lucknow, as filed with UPRERA.

What configurations are available in PURVANCHAL CAPITAL TOWER?

The unit plan filed with UPRERA lists OTHER and SHOP. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in PURVANCHAL CAPITAL TOWER?

The approved unit plan filed with UPRERA runs from 36 to 145 m² of carpet area (about 387 to 1,559 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in PURVANCHAL CAPITAL TOWER?

The approved unit plan describes 1 block and 204 units of which 178 are homes and 26 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is PURVANCHAL CAPITAL TOWER?

About 158 units per acre: 204 planned units across 1.29 acres (5,210 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗