RADHA GOBIND PALACE

UPRERARegistered

RADHA GOBIND PALACE is a RERA-registered commercial project by M/S. RADHAGOVIND TRADELINK PVT. LMT in NOOR NAGAR, Ghaziabad (RERA ID UPRERAPRJ411560). Registered with a completion deadline of 31 Oct 2025.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ411560
Project categoryCommercial
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryGhaziabad Development Authority
Proposed start9 Aug 2023
Project duration27 months
AddressRADHA GOBIND HOTAL, KHASRA 1210, 1211, 1212, NOOR NAGAR, Ghaziabad, Ghaziabad
TehsilGhaziabad
Applicant typeCompany
Applicant address4, Chowringhee lane Block1, 3rd floor room - kolkata.
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    MAP20190418122624093

  2. valid to

    Permit revalidated

    MAP20190418122624098

  3. Building permit sanctioned

    MAP20190418122624098

  4. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  5. Registered with RERA

  6. to

    Extension granted

  7. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  8. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered10 Jul 2024
Original completion31 Oct 2024
Revised completion31 Oct 2025
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹27,000
Sanctioning authorityGhaziabad Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors95 · 1 · 6 (units from plan)
Homes · commercial units64 · 31 (shops and offices filed in the same plan)
  • STUDIO64 67%
  • SHOP31 33%
ConfigurationUnitsCarpet area
SHOP3118
STUDIO6421-23
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
A · SHOP, STUDIO69518-23
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
A. Abhishek kumar
License CA/2014/63100
D-201, Blue, moon, homes Rajnagar, Ext. Ghazibad.
Engineer
Piyush Agarweal
212 Tower A-1, THUM- A40, Sec 62, Noida , UP
Contractor
DOWAR BROTHERS PVT.LTD
S3-LOC, ANSAL GHAZIABAD, UP
Sr.Development work declared to RERA
1Demarcation of Plots
The plot has - 1637.77 sqmt. of area that will be demarcated as per the sanction and survey drawing.
2Boundary Wall
A boundary wall of RCC/Brick with plaster and railing will be prepared.
3Road Work
Internal road size will be as per Layout and its will be RCC Trimix road or Bituman Road with kerb stone on sides.
4Footpaths
Footpaths is provided as per layout plan and it will be cement concrete stone.
5Water Supply Including Drinking Water Facilities
Yes, Ghaziabad development Authority, water supply system collection in under ground water reservoirs and pumped to terrace tanks.
6Sewer System
Sewer system and its size will be as per the design calculation. It has RCC hume pipe with manhole chamber and collection chamber.
7Drain
Rainwater drain will be provided as the design to carry all the rainwater of the complex in a ring line. The same will be connected ta rain water harvesting pits.
8Parks
Landscape area is provided as per Local Building Bye-Laws.
9Tree Planting
No. of tree is provided as per the approved layout Plan and as per Local Building Bye-Laws.
10Design For Electric Supply Including Street Lighting
Electric supply and street lighting is provided per the Layout plan and Local authority Norms.
11Community Buildings
NA.
12Treatment and Disposal System of Sewage and Sullage water
Disposal system of sewage and sullage water is being used through STP which is used for Landscape and flushing purpose.
13Solid Waste Management And Disposal System
All the solid waste manage through organic waste converter, collection bins and segregation table as per GDA mater plan.
14Water Conservation System
Rain water harvesting system is being provided to conserve rainwater and dual flush system.
15Energy Management System Including Use of Renewable Energy
Yes, solar energy lights in common area and external area also usage of LED lights.
16Fire Protection And Fire Safety System
As per the building plan, we will design the best fire protection consisting Sprinklers system , Yard hydrant as per approved plan.
17Social Infrastructure And Other Public Amenities Including Public Health Services
Social infrastructure and other public amenities including public health services and also provided proper water supply and sanitary facilities on stilt floor.
18Emergency Evacuation Services
As per approved plan building plan and fire approvals , fire staircases are provided.
19Other Miscellaneous Work
As per the Layout plan and requirement.
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

2 permits

An approval and the date it runs to - not proof the work matching it was done.

2 sanctioning permits are on record with UPRERA, the latest valid to 26 Oct 2024. 1 of them carries a revalidation, valid to 26 Apr 2025.

Sanctioned by Ghaziabad Development Authority · 1,638 sqm of land · an approved plan of 1 block and 95 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endRevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossaryDocuments filed
MAP2019041812262409326 Oct 201925 Oct 202425 Oct 202631 Oct 2024—
MAP2019041812262409829 May 202026 Oct 202425 Apr 202831 Oct 202429 May 2020
valid to 26 Apr 2025
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
no file published
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 1 completion extension for this project, running to 31 Oct 2025.

#Granted fromExtended uptoNote
131 Oct 202431 Oct 2025—

Land & documents

28 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
1210M,1211,12122450Khasra
1210M,1211,12121637.77Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Khatauni extract · 07/06/2019
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Registry document · 11118
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Khatauni extract · 07/06/2019
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Sale deed · 11118
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 6158
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 1447
The registered deed by which the promoter bought the land.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
not reported—
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
not reported—
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
not reported—
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
not reported—
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
not reported—
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
not reported—
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
not reported—
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
not reported—
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New30 Jun 2024 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New11 Jun 2024 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New8 Apr 2024 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New8 Apr 2024 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New4 Jun 2024 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New4 Jun 2024 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New4 Jun 2024 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New5 Jun 2024 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New28 Jun 2024 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New2 Jul 2024 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New13 Jun 2024 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New13 Jun 2024 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New31 May 2024 ↗
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
New8 Apr 2024 ↗

Quarterly progress reports

5 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

5 quarterly progress reports are on file with UPRERA, covering 2023-Q2 to 2024-Q2.

QuarterConstructionCertificates
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameM/S. RADHAGOVIND TRADELINK PVT. LMT
RolePromoter · current
RERA IDUPRERAPRM283750
PANAAFCR5676P
CIN / TANAAFCR5676P
Name of chairmanOM PRAKASH AGARWAL
Registered address4, Chowringhee lane Block1, 3rd floor room - kolkata.
RERA contact
Registered since2024
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Ghaziabad

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
M/S RADHAGOBIND TRADELINK PVT.LTD Collection Account for Radha Gobind PalaceBankPNB BANKBranchRAJNAGARBranch address127 C, SEC 11, RAJNAGARBranch districtGhaziabad, Uttar PradeshA/C no.IFSCPUNB0407800Branch emailbo4078@pnb.com
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
M/s RADHAGOBIND TRADELINK PVT. LTD Separate account for Radha Gobind PalaceBankPNBBranchPNB RAJ NAGARBranch address127 RAJ NAGAR SEC 11,Branch districtGhaziabad, Uttar PradeshA/C no.IFSCPUNB407800
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
M/S RADHAGOBIND TARDELINK PVT LTD Transaction account Radhagobind PalaceBankPNB RAJNAGARBranchRAJ NAGARBranch address127 RAJNAGAR SEC 11, GHAZIABADBranch districtGhaziabad, Uttar PradeshA/C no.IFSCPUNB407800
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about RADHA GOBIND PALACE

Is RADHA GOBIND PALACE RERA registered?

Yes. RADHA GOBIND PALACE is registered with UPRERA under registration number UPRERAPRJ411560, registered on 10 Jul 2024. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for RADHA GOBIND PALACE?

The completion date filed with UPRERA is 31 Oct 2025. No completion certificate is on record yet.

Who is the builder of RADHA GOBIND PALACE?

M/S. RADHAGOVIND TRADELINK PVT. LMT is the promoter entity that filed RADHA GOBIND PALACE with UPRERA (promoter RERA ID UPRERAPRM283750). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted RADHA GOBIND PALACE more time to complete?

UPRERA's record carries 1 completion extension for RADHA GOBIND PALACE, the latest running to 31 Oct 2025. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does RADHA GOBIND PALACE have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is RADHA GOBIND PALACE located?

RADHA GOBIND PALACE is registered in NOOR NAGAR, Ghaziabad, as filed with UPRERA.

What configurations are available in RADHA GOBIND PALACE?

The unit plan filed with UPRERA lists SHOP and STUDIO. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in RADHA GOBIND PALACE?

The approved unit plan filed with UPRERA runs from 18 to 23 m² of carpet area (about 198 to 248 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in RADHA GOBIND PALACE?

The approved unit plan describes 1 block and 95 units of which 64 are homes and 31 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is RADHA GOBIND PALACE?

About 235 units per acre: 95 planned units across 0.40 acres (1,638 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗