RAJNAGAR RESIDENCY

UPRERARegistered

RAJNAGAR RESIDENCY is a RERA-registered residential project by M R Mittals Infratech Private Limited in Ghaziabad (RERA ID UPRERAPRJ6560). Registered with a completion deadline of 29 Jun 2021. UP-RERA flags this project "Default on QPR": it has not filed its mandatory quarterly progress report(s).

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ6560
Project categoryResidential
Registration typeOngoing
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryGhaziabad Development Authority
Proposed start22 Mar 2012
Original start22 Mar 2012
Project duration112 months
AddressGhaziabad, Ghaziabad
TehsilGhaziabad
Applicant typeCompany
Applicant addressB-12 Triveni Complex,E-10-12, Jawahar park, Laxminagar, Delhi-92
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  2. Building permit sanctioned

    87/MPLAN/Zone-I/17

  3. Registered with RERA

  4. Completion certificate filed

  5. to

    Extension granted

  6. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  7. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  8. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

  9. 3 completion certificates filed

  10. Completion certificate filed

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly reports are in default on this project’s record.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered31 Jul 2017
Original completion31 Dec 2019
Revised completion29 Jun 2021
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary15 Oct 2019
Registration fee₹1,47,500
Sanctioning authorityGhaziabad Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors1,190 · 9 · 17 (units from plan)
Homes · commercial units1,172 · 18 (shops and offices filed in the same plan)
  • 3 BHK512 43%
  • 1 BHK333 28%
  • 2 BHK267 22%
  • 4 BHK60 5%
  • SHOP18 2%
ConfigurationUnitsCarpet area
1 BHK33315-50
3 BHK51272-97
4 BHK60117
2 BHK26754-74
SHOP1812-15
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
Block -1 (Tower - A) · 1 BHK, SHOP1514112-26
Block -2 (Tower - B) · 3 BHK1514972-97
Block -3 (Tower - C & D) · 4 BHK, 3 BHK, 2 BHK1620456-117
Block -4 (Tower - E ) · 2 BHK1515054
Block -5 (Tower - F ) · 3 BHK148491
Block -5 (Tower - G ) · 3 BHK1414072
Block -6 (Tower - H ) · 2 BHK, 1 BHK1414050-58
E.W.S · 1 BHK149115
L.I.G · 1 BHK149127
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Viresh Goel
License CA/95/18587
T- 134 A, AAM Bagh Farm House, Near Shamshi Talab, Andheria Morh, Mehrauli, New Delhi 110030
Engineer
P.K. Kulshreshtha
N-17, Aam bagh Darm Houses, Shamshi Talab, Nr Andheria Morh, Mehrauli, New Delhi - 110030
Contractor
Buildwell Construction Company
C/o Mange Ram Bhatta Com Khasra No 988, 989 Opp Jain Tube Company N H 58 Merrut Road Ghaziabad U.P.
Sr.Development work declared to RERA
1Demarcation of Plots
Plot Has Already been demarcated with boundary wall on all sides.
2Boundary Wall
Plot Has Already been demarcated with boundary wall on all sides.
3Road Work
65% of Internal Roads work has been finished
4Footpaths
65% of Internal Roads work has been finished
5Water Supply Including Drinking Water Facilities
Authority is going to supply Ganga Water and they are working on the building a water treatment for the same.
6Sewer System
STP is already operational for Raj Nagar Extension & sewer Line has already been laid.
7Drain
80% of internal drain have been finished
8Parks
50% of Parks have been developed
9Tree Planting
25 % of Tree Planting have been done
10Design For Electric Supply Including Street Lighting
65% of Internal Street Lightning work has been finished.
11Community Buildings
Club building work has been Started
12Treatment and Disposal System of Sewage and Sullage water
STP is getting installed at site & treated water is going to be used for horticulture & flushing need.
13Solid Waste Management And Disposal System
Fully Automatic Sewage treatment has been installed at site
14Water Conservation System
Modern Rain Water harvesting system type has been installed at site.
15Energy Management System Including Use of Renewable Energy
Led Lights have been used in most common Areas and energy efficient equipments have been installed, wherever possible
16Fire Protection And Fire Safety System
Already Executed as per norms
17Social Infrastructure And Other Public Amenities Including Public Health Services
Already Existed in the Vicinity
18Emergency Evacuation Services
As per norms
19Other Miscellaneous Work
As per norms
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

1 agent

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1NIKHIL JAINUPRERAAGT12804
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 14 Jul 2022.

Sanctioned by Ghaziabad Development Authority · 28,475 sqm of land · an approved plan of 9 blocks and 1190 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
87/MPLAN/Zone-I/1715 Jul 201714 Jul 202214 Jul 202430 Dec 2020
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
no file published
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 2 completion extensions for this project, the latest running to 29 Jun 2021.

#Granted fromExtended uptoNote
131 Dec 201930 Dec 2020—
230 Dec 202029 Jun 2021Six months extension in view of force majeure caused by covid-19 pandemic

Land & documents

71 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
8972150—
10742780—
9382400—
939, 9409602—
935313.6—
1075167.22—
918760—
107550.17—
107562.70—
1075334.44—
1075250.83—
941,9424550—
9442150—
1078/1379.59—
1078/1189—
1078/1569.38—
1079146.31—
1079146.31—
1079146.31—
1079133.77—
1079146.31—
1079105.06—
1087167.22—
107550.17—
1075125.42—
1075277.59—
107571.07—
7169 (Kh No 1079)234.11—
8972150Khasra
10742780Khasra
9382400Khasra
939,9409602Khasra
935313.6Khasra
1075167.22Khasra
918760Khasra
107550.17Khasra
107562.70Khasra
1075334.44Khasra
107550.17Khasra
1075125.42Khasra
1075250.83Khasra
1075277.59Khasra
107571.07Khasra
941, 9424550Khasra
1079234.11Khasra
9442150Khasra
1078/1379.59Khasra
1078/1189Khasra
1078/1569.38Khasra
1079133.77Khasra
1079146.31Khasra
1079146.31Khasra
1079146.31Khasra
1079146.31Khasra
1079105.06Khasra
1087167.22Khasra
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

29 registry or lease-deed filings are on this project’s record with UPRERA, the earliest dated 11 Aug 2011.

Registry no.DateTypeArea
7154 (Kh No 897)11 Aug 2011self—
944724 Oct 2011self—
10980 (kh No 938)7 Dec 2011self—
10980 (kh No 938)7 Dec 2011self—
10977 (Kh No: 939, 940)7 Dec 2011self—
10976 (Kh No 935)7 Dec 2011self—
1677 (kh No 1075)13 Feb 2012self—
1785 (Kh No 918)15 Feb 2012self—
1826 (Kh No 1075)16 Feb 2012self—
1821 (Kh No 1075)16 Feb 2012self—
2188 (Kh No 1075)27 Feb 2012self—
2176 (Kh No 1075)27 Feb 2012self—
2453 (kh No 1075)6 Mar 2012self—
2558 (kh NO: 1075)12 Mar 2012self—
3462( Kh No 1075)28 Mar 2012self—
4105 (kh No: 1075)11 Apr 2012self—
7147 (Kh No: 941, 942)18 Jun 2012self—
7169 (kh No: 1079)19 Jun 2012self—
8972 (Kh No: 944)3 Aug 2012self—
6308 (Kh No 1078/1)11 Jun 2013self—
8199(Kh No: 1078/1)13 Jul 2012self—
11180 (kh No: 1078/1)5 Oct 2012self—
11235 (kh No: 1079)9 Oct 2012self—
11234 (kh No 1079)9 Oct 2012self—
11233(Kh No 1079)9 Oct 2012self—
11163 (kh No1079)4 Oct 2012self—
11162 (kh No: 1079)4 Oct 2012self—
12209 (Kh No: 1079)5 Nov 2012self—
12211 (kh NO: 1087)5 Nov 2012self—
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Khatauni extract · 1421-1426
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Document checklist
DocumentStatusUploaded
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
not reported—
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New5 Jul 2018 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New5 Jul 2018 ↗
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
New5 Jul 2018 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New5 Jul 2018 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New5 Jul 2018 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New5 Jul 2018 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New17 Jul 2018 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New6 Jul 2018 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New6 Jul 2018 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New6 Jul 2018 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
Old24 Oct 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old24 Oct 2017 ↗

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking waterGROUND WATER
Fire safety (as filed with RERA)AS PER FIRE NOC
Renewable energyAS PER SANCTION MAP
Other facilitiesN.A.

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Quarterly progress reports

5 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

5 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2021-Q1.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameM R Mittals Infratech Private Limited
RolePromoter · current
RERA IDUPRERAPRM8071
PANAAHCM0946P
CIN / TANU70109DL2011PTC216657
Name of chairmanSunil Kumar Mittal
Registered addressB-12 Triveni Complex,E-10-12, Jawahar park, Laxminagar, Delhi-92
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Ghaziabad

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
M R Mittals Infratech Pvt LtdBankAXIS BANK LTDBranchAXIS BANK LTD RDC Branch Ghaziabad U.P.A/C no.IFSCUTIB0001082
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

Common questions about RAJNAGAR RESIDENCY

Is RAJNAGAR RESIDENCY RERA registered?

Yes. RAJNAGAR RESIDENCY is registered with UPRERA under registration number UPRERAPRJ6560, registered on 31 Jul 2017. Estanzo reproduces that filing; it does not verify the work behind it.

Has RAJNAGAR RESIDENCY been completed?

UPRERA still lists RAJNAGAR RESIDENCY as Registered, so it is not shown as completed here. A completion certificate dated 15 Oct 2019 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.

Who is the builder of RAJNAGAR RESIDENCY?

M R Mittals Infratech Private Limited is the promoter entity that filed RAJNAGAR RESIDENCY with UPRERA (promoter RERA ID UPRERAPRM8071). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Why does RAJNAGAR RESIDENCY show "default on QPR"?

UPRERA flags this project as in default on quarterly progress reporting - the promoter has not filed one or more mandatory quarterly progress reports. The flag is the authority's, not Estanzo's.

Has UPRERA granted RAJNAGAR RESIDENCY more time to complete?

UPRERA's record carries 2 completion extensions for RAJNAGAR RESIDENCY, the latest running to 29 Jun 2021. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does RAJNAGAR RESIDENCY have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is RAJNAGAR RESIDENCY located?

RAJNAGAR RESIDENCY is registered in Ghaziabad, as filed with UPRERA.

What configurations are available in RAJNAGAR RESIDENCY?

The unit plan filed with UPRERA lists 1 BHK, 3 BHK, 4 BHK, 2 BHK and SHOP. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in RAJNAGAR RESIDENCY?

The approved unit plan filed with UPRERA runs from 12 to 117 m² of carpet area (about 124 to 1,259 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in RAJNAGAR RESIDENCY?

The approved unit plan describes 9 blocks and 1,190 units of which 1,172 are homes and 18 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is RAJNAGAR RESIDENCY?

About 169 units per acre: 1,190 planned units across 7.04 acres (28,475 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗